Similar Documents at Salem |
---|
Category:Inspection Plan
MONTHYEARML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) ML22318A1062022-11-14014 November 2022 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000272/2023011 and 05000311/2023011 IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) ML22234A0362022-08-22022 August 2022 Request for Information to Support Triennial Baseline Design - Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000272/2022011 and 05000311/2022011 ML22104A1762022-04-14014 April 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000272/2022402 and 05000311/2022402 IR 05000272/20210062022-03-0202 March 2022 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006) IR 05000272/20210052021-09-0101 September 2021 Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005) IR 05000272/20200062021-03-0303 March 2021 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006) LR-N21-0014, Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 20302021-02-16016 February 2021 Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 2030 ML20281A5172020-10-13013 October 2020 Notification of Conduct of a Fire Protection Team Inspection IR 05000272/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000272/2020005 and 05000311/2020005) ML20077L3492020-03-20020 March 2020 Ti 2515/194 Inspection Documentation Request IR 05000272/20190062020-03-0303 March 2020 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2019006 and 05000311/2019006) IR 05000272/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000272/2019005 and 05000311/2019005) IR 05000272/20180062019-03-0404 March 2019 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2018006 and 05000311/2018006) IR 05000272/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Reports 05000272/2018005 and 05000311/2018005) IR 05000272/20170062018-02-28028 February 2018 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017006, 05000311/2017006, 05000272/2017402, 05000311/2017402, 05000272/2017501, and 05000311/2017501 IR 05000272/20170052017-08-28028 August 2017 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017005 and 05000311/2017005) IR 05000272/20160062017-03-0101 March 2017 Annual Assessment Letter for Salem Nuclear Generating Station (Salem), Units 1 and 2 (Reports 05000272/2016006 and 05000311/2016006) IR 05000272/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station - Unit Nos. 1 and 2 (Report 05000272/2016005 and 05000311/2016005) IR 05000272/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 & 2 (Inspection Report 05000272/2015006 and 05000311/2015006) IR 05000272/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2015005 and 05000311/2015005) IR 05000272/20140012015-03-0404 March 2015 ROP-15 Annual Assessment Letter for Salem Nuclear Generating Station Units 1 and 2 (Report 05000272/2014001 and 05000311/2014001) IR 05000272/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2014006 and 05000311/2014006 IR 05000272/20130012014-03-0404 March 2014 ROP-14 2013 Salem Nuclear Generating Station Units 1 and 2, Annual Assessment Letter, Report 05000272-13-001 and 05000311-13-001),and Inspection Plan IR 05000272/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2013006 and 05000311/2013006 IR 05000272/20120012013-03-0404 March 2013 Annual Assessment Letter for Salem Nuclear Generating Station, Unit 1 and 2 (Report 05000272/2012001 and 05000311/2012001) ML12248A0402012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20110012012-03-0505 March 2012 Annual Assessment Letter for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Report 05000272/2011001 and 05000311/2011001) ML1124112942011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20100012011-03-0404 March 2011 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2, EOC-11 (Report 05000272/2010001 and 05000311/2010001) ML1024403642010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Salem Nuclear Generating Station, Units 1 and 2 ML1029505872010-03-12012 March 2010 Email from Ohara, Timothy to Conte, Richard, FW: Salem U1 Inspection Plan. ML1006208082010-03-0303 March 2010 EOC Letter and Report 22 ML0924403092009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station, Unit Nos. 1 and 2 (September 1, 2009) IR 05000272/20090012009-03-0404 March 2009 Annual Assessment Letter - Salem Nuclear Generating Station, Units 1 and 2 (05000272-09-001 and 05000311-09-001) IR 05000272/20080012008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Salem Station (05000272-08-001, 05000311-08-001) ML0734706552007-12-13013 December 2007 ROP 8 - Salem - Change to Inspection Plan, 12/13/07 ML0724309472007-08-31031 August 2007 Mid-Cycle Review and Inspection Plan IR 05000272/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Salem Generating Station (Report 05000272-07-001, 05000311-07-001) ML0624306512006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station IR 07200200/19600012006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Salem Nuclear Generating Station (Report 05-272/2006001 and 05-311/2006001) ML0406307982004-03-0303 March 2004 2003-04 Annual Assessment Letter - Salem ML0323905112003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Salem Units 1 and 2 ML0306206932003-03-0303 March 2003 2003 Annual Assessment Letter - Salem Nuclear Generating Station ML0223500582002-08-23023 August 2002 2002 Mid-Cycle Performance Review and Inspection Plan - Salem Generating Station Units 1 & 2 IR 05000272/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Salem Nuclear Station - Units 1 & 2 (Report Nos. 50-272/02-001, 50-311/02-001) ML19031A0961977-10-11011 October 1977 Response to NRC Request for Additional Information for Review of Proposed Inservice Inspection & Testing Programs 2024-01-08
[Table view] Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2010 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC wN09 P. O. Box 236 Hancock's Bridge, NJ 08038
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2
Dear Mr. Joyce:
On August 10,2010, the NRC staff completed its performance review of Salem Nuclear Generating Station (Salem). Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Onlyw~Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Salem Units 1 and 2 was within the Licensee Response column of the NRC's Action Matrix. based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31.2011. In addition to the baseline inspections, we plan to conduct an inspection of your independent spent fuel storage installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337~5069 with any questions you may have regarding this letter or the inspection plan.
T.Joyce 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, a copy of this letter and its II enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).
Sincerely.
Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272,50-311 License Nos. DPR-70. DPR-75
Enclosure:
Salem Nuclear Generating Station Inspection! Activity Plan cc w/encl: Distribution via ListServ
T. Joyce 3 I In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its I
enclosure will be made available electronically for public inspection in the NRC Public ).
Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).
Sincerely, IRAJ Arthur L Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272,50-311 license Nos. DPR-70, DPR-75
Enclosure:
Salem Nuclear Generating Station Inspection! Activity Plan cc w/encl: Distribution via ListServ Distribution w/encl: N. McNamara, SLO M. Dapas, Acting RA D. Tifft, SLO D. Lew, Acting ORA D. Serend, PAO J. Clifford, DRP N. Sheehan, PAO A. Burritt, ORP R. Barkley, ORA L Cline, DRP John Thompson, NRR A. Turilin, DRP RidsNrrDirslpab@nrc.gov C. Douglas, DRP RidsNrrPMSalemResource D. Schroeder, ORP. SRI RidsNrrDorlLpl1-2Resource H. Balian, DRP, RI ROPreportsResource@nrc.gov K. McKenzie. DRP. OA L Trocine, RI OEDO Director, DRS Deputy Director, DRS DRS Branch Chiefs (6)
SUNSI REVIEW COMPLETE: ALB (Reviewer's Initials) ML102440364 DOCUMENT NAME: S:\ROP-11 MID-CYCLE REVIEW\BRANCH 3\SALEM MID-CYCLE LETTER2010.DOCX After declaring this document "An Official Agency Record" it will be released to the Public.
To receive acopy ofthis document, indicate in box:"C' Copy w/o attachmenUenclosure, E' " Copy wI altachmenflenciosure'NNo copy OFFICE mmt RI/DRP RIIDRP NAME DSchroederl LC for LClinel LC DATE 8/31/10 08/31/10 OFFICIAL RECORD COpy
Page 1 of3 Salem 08/30/201015: 04:53 Inspection / Activity Plan Report 22 07/01/2010 - 12/31/2011 Planned Dates Start End Title 71124 - HP 1 1.2 07/19/2010 07/23/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1.2 07/19/2010 07/23/2010 IP 71124.02 Occupational ALARA Planning and Controls 1,2 07/19/2010 07/23/2010 IP 71124.04 Occupational Dose Assessment TI-177 - MANAGING GAS ACCUMULATION IN ECCS 3 1.2 08/02/2010 08/06/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System ISFSI - ISFSI - DRY RUN AND INITIAL LOADING 1.2 08/09/2010 08/13/2010 IP 60854 Preoperational Testing Of An ISFSI 1,2 08/09/2010 08/1312010 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1.2 09/07/2010 09110/2010 IP 60854 Preoperational Testing Of An ISFSI 1.2 09/0712010 09/10/2010 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1,2 09/07/2010 09110/2010 IP 60855 Operation Of An ISFSI 1,2 09/0712010 09/10/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1,2 09/13/2010 09/17/2010 IP 60854 Preoperational Testing Of An ISFSI 1,2 09/13/2010 09/17/2010 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage FacUlty Installation at Operating Plants 1,2 09/13/2010 09/1712010 IP 60855 Operation Of An ISFSI 1.2 09/13/2010 09/17/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 09/24EXM - SALEM RETAKE SIMULATOR EXAM 2 09/13/2010 09/13/2010 U01835 FY10-SALEM U1/2 RETAKE OPERATOR LICENSING EXAM 09/24/2010 09/24/2010 U01835 FY10-SALEM U1/2 RETAKE OPERATOR LICENSING EXAM 71124 - HP & ISFSI 1 1,2 09/27/2010 10101/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1,2 09/27/2010 10/01/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 09/27/2010 10/01/2010 IP 71124.05 Radiation Monitoring Instrumentation 1,2 09127/2010 10101/2010 IP 71151-0R01 Occupational Exposure Control Effectiveness 1,2 09/27/2010 10/01/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent 7111107T - TRIENNIAL HEAT SINK 1 1,2 12/06/2010 12/10/2010 IP 7111107T Heat Sink Performance 71124 - HP INSPECTION 1,2 01/03/2011 01/07/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 01/03/2011 01/07/2011 IP 71124.02 Occupational ALARA Planning and Controls 1,2 01/03/2011 01/0712011 IP 71124.04 Occupational Dose Assessment 7111121 - CDBI 7 1,2 01/24/2011 01/28/2011 IP 7111121 Component Design Bases Inspection 1,2 02/07/2011 02111/2011 IP 7111121 Component Design Bases Inspection his report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of3 Salem 08/30/2010 15:04:53 Inspection / Activity Plan Report 22 07/01/2010 - 12/31/2011 Planned Dates Start End Title 7111121 -CDBI 7 1.2 02/14/2011 02/1812011 IP 7111121 Component Design Bases Inspection EP PROGR - EP PROGRAM INSPECTION 1.2 03114/2011 03/1812011 IP 7111402 Alert and Notification System Testing 1.2 03114/2011 03/1812011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1.2 03/14/2011 03118/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1.2 03114/2011 03/18/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1,2 03/14/2011 03/18/2011 IP 71151-EP01 Drill/Exercise Performance 1,2 03/14/2011 03/18/2011 IP 71151-EP02 ERO Drill Participation 1.2 03/14/2011 03/18/2011 IP 71151*EP03 Alert & Notification System 2515/172 - TI25151172 RCS OM WELDS 1 2 04/11/2011 04/22/2011 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 7111108P - U21NSERVICE INSPECTION 1 2 04/11/2011 04/22/2011 IP 7111108P Inservice Inspection Activities - PWR 0912EXM - OPERATOR LICENSING INITIAL EXAMS 5 08/15/2011 08/19/2011 U01830 FY11* SALEM. INITIAL OL EXAM 09/1212011 09/16/2011 U01830 FY11- SALEM. INITIAL OL EXAM 71124 - HP 1 2 04/18/2011 04/22/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 04/18/2011 04/22/2011 IP 71124.02 Occupational ALARA Planning and Controls 2 04/18/2011 04/22/2011 IP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation 71152 -PI&R 4 1,2 06/27/2011 07/01/2011 IP 711528 . Identification and Resolution of Problems 1,2 07/11/2011 07/15/2011 IP 711528 Identification and Resolution of Problems 711111B - SALEM REQUAL INSP WI P/F RESULTS 3 1,2 09/18/2011 09/22/2011 IP 7111111B Licensed Operator Requalification Program 71124 -REMP 1.2 07/25/2011 07/29/2011 IP 71124.07 Radiological Environmental Monitoring Program 71124 -HP 1 1,2 10/17/2011 10/21/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 1,2 10/17/2011 10/21/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1011712011 10/21/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 10/17/2011 10121/2011 IP 71124.02 Occupational ALARA Planning and Controls 10/17/2011 10/21/2011 IP 71124.05 Radiation Monitoring Instrumentation his report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 30f3 Salem 08130/2010 15:04:53 Inspection I Activity Plan Report 22 07/01/2010
- 1213112011 Planned Dates Start End Title 2515/172
- U11NSERVICE INSPECTION 10/1712011 10/28/2011 IP 711110BP lnselVice Inspection Activities - PWR 71124 - RADWASTE 1 1,2 12/05/2011 12/09/2011 IP 71124.08 RadIoactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation his repor!'does!1-ot include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.