Mid-Cycle Performance Review and Inspection Plan 2010 - Salem Nuclear Generating Station, Units 1 and 2
ML102440364
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/01/2010
From: Arthur Burritt
Reactor Projects Branch 3
To: Joyce T
Public Service Enterprise Group
BURRITT AL
References
Download: ML102440364 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2010 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC w N09 P. O. Box 236 Hancock's Bridge, NJ 08038

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2

Dear Mr. Joyce:

On August 10,2010, the NRC staff completed its performance review of Salem Nuclear Generating Station (Salem). Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Onlyw~Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Salem Units 1 and 2 was within the Licensee Response column of the NRC's Action Matrix. based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31.2011. In addition to the baseline inspections, we plan to conduct an inspection of your independent spent fuel storage installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337~5069 with any questions you may have regarding this letter or the inspection plan.

T.Joyce 2

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, II a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

Sincerely.

Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272,50-311 License Nos. DPR-70. DPR-75

Enclosure:

Salem Nuclear Generating Station Inspection! Activity Plan cc w/encl: Distribution via ListServ

T. Joyce 3

I I

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public

).

Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRAJ Arthur L Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272,50-311 license Nos. DPR-70, DPR-75

Enclosure:

Salem Nuclear Generating Station Inspection! Activity Plan cc w/encl: Distribution via ListServ Distribution w/encl:

N. McNamara, SLO M. Dapas, Acting RA D. Tifft, SLO D. Lew, Acting ORA D. Serend, PAO J. Clifford, DRP N. Sheehan, PAO A. Burritt, ORP R. Barkley, ORA L Cline, DRP John Thompson, NRR A. Turilin, DRP RidsNrrDirslpab@nrc.gov C. Douglas, DRP RidsNrrPMSalemResource D. Schroeder, ORP. SRI RidsNrrDorlLpl1-2Resource H. Balian, DRP, RI ROPreportsResource@nrc.gov K. McKenzie. DRP. OA L Trocine, RI OEDO Director, DRS Deputy Director, DRS DRS Branch Chiefs (6)

SUNSI REVIEW COMPLETE: ALB (Reviewer's Initials)

ML102440364 DOCUMENT NAME: S:\\ROP-11 MID-CYCLE REVIEW\\BRANCH 3\\SALEM MID-CYCLE LETTER2010.DOCX After declaring this document "An Official Agency Record" it will be released to the Public.

To receive acopy ofthis document, indicate in box:"C' Copy w/o attachmenUenclosure, E' " Copy wI altachmenflenciosure'NNo copy OFFICE mmt RI/DRP RIIDRP NAME DSchroederl LC for LClinel LC DATE 8/31/10 08/31/10 OFFICIAL RECORD COpy

Page 1 of3 Salem 08/30/201015:04:53 Inspection / Activity Plan Report 22 Planned Dates 07/01/2010 - 12/31/2011 Title

- HP 1

Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls Occupational Dose Assessment

- MANAGING GAS ACCUMULATION IN ECCS 3

Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System

- ISFSI - DRY RUN AND INITIAL LOADING Preoperational Testing Of An ISFSI Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants Preoperational Testing Of An ISFSI Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants Operation Of An ISFSI Operation of an Independent Spent Fuel Storage Installation at Operating Plants Preoperational Testing Of An ISFSI Preoperational Testing of Independent Spent Fuel Storage FacUlty Installation at Operating Plants Operation Of An ISFSI Operation of an Independent Spent Fuel Storage Installation at Operating Plants

- SALEM RETAKE SIMULATOR EXAM 2

FY10-SALEM U1/2 RETAKE OPERATOR LICENSING EXAM FY10-SALEM U1/2 RETAKE OPERATOR LICENSING EXAM

- HP & ISFSI 1

Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiological Hazard Assessment and Exposure Controls Radiation Monitoring Instrumentation 1.2 1.2 1,2 1.2 1.2 1,2 1.2 1.2 1,2 1,2 1,2 1,2 1,2 1.2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 Start 07/19/2010 07/19/2010 07/19/2010 08/02/2010 08/09/2010 08/09/2010 09/07/2010 09/0712010 09/07/2010 09/0712010 09/13/2010 09/13/2010 09/13/2010 09/13/2010 09/13/2010 09/24/2010 09/27/2010 09/27/2010 09/27/2010 09127/2010 09/27/2010 12/06/2010 01/03/2011 01/03/2011 01/03/2011 01/24/2011 02/07/2011 End 07/23/2010 07/23/2010 07/23/2010 08/06/2010 08/13/2010 08/1312010 09110/2010 09/10/2010 09110/2010 09/10/2010 09/17/2010 09/17/2010 09/1712010 09/17/2010 09/13/2010 09/24/2010 10101/2010 10/01/2010 10/01/2010 71124 IP 71124.01 IP 71124.02 IP 71124.04 TI-177 IP 2515/177 ISFSI IP 60854 IP 60854.1 IP 60854 IP 60854.1 IP 60855 IP 60855.1 IP 60854 IP 60854.1 IP 60855 IP 60855.1 09/24EXM U01835 U01835 71124 IP 60855.1 IP 71124.01 IP 71124.05 10101/2010 IP 71151-0R01 Occupational Exposure Control Effectiveness 10/01/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent 7111107T

- TRIENNIAL HEAT SINK 1

12/10/2010 IP 7111107T Heat Sink Performance 71124 01/07/2011 IP 71124.01 01/07/2011 IP 71124.02 01/0712011 IP 71124.04 7111121 01/28/2011 IP 7111121 02111/2011 IP 7111121

- HP INSPECTION Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls Occupational Dose Assessment

- CDBI Component Design Bases Inspection Component Design Bases Inspection his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

7

7 7111121 IP 7111121 EP PROGR IP 7111402 IP 7111403 IP 7111404 IP 7111405 Salem Inspection / Activity Plan 07/01/2010 - 12/31/2011 Title

-CDBI Component Design Bases Inspection

- EP PROGRAM INSPECTION Alert and Notification System Testing Emergency Preparedness Organization Staffing and Augmentation System Emergency Action Level and Emergency Plan Changes Correction of Emergency Preparedness Weaknesses and Deficiencies I P 71151-EP01 Drill/Exercise Performance IP 71151-EP02 ERO Drill Participation IP 71151*EP03 Alert & Notification System 2515/172 IP 2515/172 7111108P IP 7111108P 0912EXM U01830 U01830 71124 IP 71124.01 IP 71124.02 IP 71124.03 71152 IP 711528 IP 711528 711111B IP 7111111B 71124 IP 71124.07 71124 IP 2515/179 IP 60855.1 IP 71124.01 IP 71124.02 IP 71124.05

- TI25151172 RCS OM WELDS 1

Reactor Coolant System Dissimiliar Metal Butt Welds

- U21NSERVICE INSPECTION 1

Inservice Inspection Activities - PWR

- OPERATOR LICENSING INITIAL EXAMS

- HP

-PI&R FY11* SALEM. INITIAL OL EXAM FY11-SALEM. INITIAL OL EXAM 1

Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airbome Radioactivity Control and Mitigation 4

. Identification and Resolution of Problems Identification and Resolution of Problems

- SALEM REQUAL INSP WI P/F RESULTS

-REMP

-HP Licensed Operator Requalification Program Radiological Environmental Monitoring Program Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls Radiation Monitoring Instrumentation Page 2 of3 08/30/2010 Report 22 1.2 1.2 1.2 1.2 1.2 1,2 1,2 1.2 2

2 2

2 2

1,2 1,2 1,2 1.2 1,2 1,2 Start 02/14/2011 03114/2011 03114/2011 03/14/2011 03114/2011 03/14/2011 03/14/2011 03/14/2011 04/11/2011 04/11/2011 08/15/2011 09/1212011 04/18/2011 04/18/2011 04/18/2011 06/27/2011 07/11/2011 09/18/2011 07/25/2011 10/17/2011 10/17/2011 1011712011 10/17/2011 10/17/2011 15:04:53 Planned Dates End 02/1812011 03/1812011 03/1812011 03118/2011 03/18/2011 03/18/2011 03/18/2011 03/18/2011 04/22/2011 04/22/2011 08/19/2011 09/16/2011 04/22/2011 04/22/2011 04/22/2011 07/01/2011 07/15/2011 09/22/2011 07/29/2011 10/21/2011 10/21/2011 10/21/2011 10121/2011 10/21/2011 his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

5 3

1

Page 30f3 08130/2010 Report 22 15:04:53 Salem Inspection I Activity Plan 07/01/2010

  • 1213112011 Planned Dates Start End Title 10/17/2011 10/28/2011 2515/172
  • U11NSERVICE INSPECTION 10/1712011 10/28/2011 IP 711110BP lnselVice Inspection Activities - PWR 71124

- RADWASTE 1

1,2 12/05/2011 12/09/2011 IP 71124.08 RadIoactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation his repor!'does!1-ot include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.