Mid-Cycle Performance Review and Inspection Plan 2010 - Salem Nuclear Generating Station, Units 1 and 2
ML102440364
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/01/2010
From: Arthur Burritt
Reactor Projects Branch 3
To: Joyce T
Public Service Enterprise Group
BURRITT AL
References
Download: ML102440364 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2010 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC wN09 P. O. Box 236 Hancock's Bridge, NJ 08038

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2

Dear Mr. Joyce:

On August 10,2010, the NRC staff completed its performance review of Salem Nuclear Generating Station (Salem). Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Onlyw~Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Salem Units 1 and 2 was within the Licensee Response column of the NRC's Action Matrix. based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31.2011. In addition to the baseline inspections, we plan to conduct an inspection of your independent spent fuel storage installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337~5069 with any questions you may have regarding this letter or the inspection plan.

T.Joyce 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, a copy of this letter and its II enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

Sincerely.

Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272,50-311 License Nos. DPR-70. DPR-75

Enclosure:

Salem Nuclear Generating Station Inspection! Activity Plan cc w/encl: Distribution via ListServ

T. Joyce 3 I In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its I

enclosure will be made available electronically for public inspection in the NRC Public ).

Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRAJ Arthur L Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272,50-311 license Nos. DPR-70, DPR-75

Enclosure:

Salem Nuclear Generating Station Inspection! Activity Plan cc w/encl: Distribution via ListServ Distribution w/encl: N. McNamara, SLO M. Dapas, Acting RA D. Tifft, SLO D. Lew, Acting ORA D. Serend, PAO J. Clifford, DRP N. Sheehan, PAO A. Burritt, ORP R. Barkley, ORA L Cline, DRP John Thompson, NRR A. Turilin, DRP RidsNrrDirslpab@nrc.gov C. Douglas, DRP RidsNrrPMSalemResource D. Schroeder, ORP. SRI RidsNrrDorlLpl1-2Resource H. Balian, DRP, RI ROPreportsResource@nrc.gov K. McKenzie. DRP. OA L Trocine, RI OEDO Director, DRS Deputy Director, DRS DRS Branch Chiefs (6)

SUNSI REVIEW COMPLETE: ALB (Reviewer's Initials) ML102440364 DOCUMENT NAME: S:\ROP-11 MID-CYCLE REVIEW\BRANCH 3\SALEM MID-CYCLE LETTER2010.DOCX After declaring this document "An Official Agency Record" it will be released to the Public.

To receive acopy ofthis document, indicate in box:"C' Copy w/o attachmenUenclosure, E' " Copy wI altachmenflenciosure'NNo copy OFFICE mmt RI/DRP RIIDRP NAME DSchroederl LC for LClinel LC DATE 8/31/10 08/31/10 OFFICIAL RECORD COpy

Page 1 of3 Salem 08/30/201015: 04:53 Inspection / Activity Plan Report 22 07/01/2010 - 12/31/2011 Planned Dates Start End Title 71124 - HP 1 1.2 07/19/2010 07/23/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1.2 07/19/2010 07/23/2010 IP 71124.02 Occupational ALARA Planning and Controls 1,2 07/19/2010 07/23/2010 IP 71124.04 Occupational Dose Assessment TI-177 - MANAGING GAS ACCUMULATION IN ECCS 3 1.2 08/02/2010 08/06/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System ISFSI - ISFSI - DRY RUN AND INITIAL LOADING 1.2 08/09/2010 08/13/2010 IP 60854 Preoperational Testing Of An ISFSI 1,2 08/09/2010 08/1312010 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1.2 09/07/2010 09110/2010 IP 60854 Preoperational Testing Of An ISFSI 1.2 09/0712010 09/10/2010 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1,2 09/07/2010 09110/2010 IP 60855 Operation Of An ISFSI 1,2 09/0712010 09/10/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1,2 09/13/2010 09/17/2010 IP 60854 Preoperational Testing Of An ISFSI 1,2 09/13/2010 09/17/2010 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage FacUlty Installation at Operating Plants 1,2 09/13/2010 09/1712010 IP 60855 Operation Of An ISFSI 1.2 09/13/2010 09/17/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 09/24EXM - SALEM RETAKE SIMULATOR EXAM 2 09/13/2010 09/13/2010 U01835 FY10-SALEM U1/2 RETAKE OPERATOR LICENSING EXAM 09/24/2010 09/24/2010 U01835 FY10-SALEM U1/2 RETAKE OPERATOR LICENSING EXAM 71124 - HP & ISFSI 1 1,2 09/27/2010 10101/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1,2 09/27/2010 10/01/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 09/27/2010 10/01/2010 IP 71124.05 Radiation Monitoring Instrumentation 1,2 09127/2010 10101/2010 IP 71151-0R01 Occupational Exposure Control Effectiveness 1,2 09/27/2010 10/01/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent 7111107T - TRIENNIAL HEAT SINK 1 1,2 12/06/2010 12/10/2010 IP 7111107T Heat Sink Performance 71124 - HP INSPECTION 1,2 01/03/2011 01/07/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 01/03/2011 01/07/2011 IP 71124.02 Occupational ALARA Planning and Controls 1,2 01/03/2011 01/0712011 IP 71124.04 Occupational Dose Assessment 7111121 - CDBI 7 1,2 01/24/2011 01/28/2011 IP 7111121 Component Design Bases Inspection 1,2 02/07/2011 02111/2011 IP 7111121 Component Design Bases Inspection his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of3 Salem 08/30/2010 15:04:53 Inspection / Activity Plan Report 22 07/01/2010 - 12/31/2011 Planned Dates Start End Title 7111121 -CDBI 7 1.2 02/14/2011 02/1812011 IP 7111121 Component Design Bases Inspection EP PROGR - EP PROGRAM INSPECTION 1.2 03114/2011 03/1812011 IP 7111402 Alert and Notification System Testing 1.2 03114/2011 03/1812011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1.2 03/14/2011 03118/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1.2 03114/2011 03/18/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1,2 03/14/2011 03/18/2011 IP 71151-EP01 Drill/Exercise Performance 1,2 03/14/2011 03/18/2011 IP 71151-EP02 ERO Drill Participation 1.2 03/14/2011 03/18/2011 IP 71151*EP03 Alert & Notification System 2515/172 - TI25151172 RCS OM WELDS 1 2 04/11/2011 04/22/2011 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 7111108P - U21NSERVICE INSPECTION 1 2 04/11/2011 04/22/2011 IP 7111108P Inservice Inspection Activities - PWR 0912EXM - OPERATOR LICENSING INITIAL EXAMS 5 08/15/2011 08/19/2011 U01830 FY11* SALEM. INITIAL OL EXAM 09/1212011 09/16/2011 U01830 FY11- SALEM. INITIAL OL EXAM 71124 - HP 1 2 04/18/2011 04/22/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 04/18/2011 04/22/2011 IP 71124.02 Occupational ALARA Planning and Controls 2 04/18/2011 04/22/2011 IP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation 71152 -PI&R 4 1,2 06/27/2011 07/01/2011 IP 711528 . Identification and Resolution of Problems 1,2 07/11/2011 07/15/2011 IP 711528 Identification and Resolution of Problems 711111B - SALEM REQUAL INSP WI P/F RESULTS 3 1,2 09/18/2011 09/22/2011 IP 7111111B Licensed Operator Requalification Program 71124 -REMP 1.2 07/25/2011 07/29/2011 IP 71124.07 Radiological Environmental Monitoring Program 71124 -HP 1 1,2 10/17/2011 10/21/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 1,2 10/17/2011 10/21/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1011712011 10/21/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 10/17/2011 10121/2011 IP 71124.02 Occupational ALARA Planning and Controls 10/17/2011 10/21/2011 IP 71124.05 Radiation Monitoring Instrumentation his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 30f3 Salem 08130/2010 15:04:53 Inspection I Activity Plan Report 22 07/01/2010

  • 1213112011 Planned Dates Start End Title 2515/172
  • U11NSERVICE INSPECTION 10/1712011 10/28/2011 IP 711110BP lnselVice Inspection Activities - PWR 71124 - RADWASTE 1 1,2 12/05/2011 12/09/2011 IP 71124.08 RadIoactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation his repor!'does!1-ot include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.