ML17244A217: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.8UMTORM NFORMATXON DXSTRIBUTION
{{#Wiki_filter:.
., TEM DOCKET NBR.50-244/5 RE GINNA 1;STERLING DQC DATE: 781204 1 RECXPIENT:
8UMTORM         NFORMATXON DXSTRIBUTION       ., TEM DOCKET NBR.         50-244/                         1 5 RE GINNA 1;STERLING DQC   DATE:       781204 RECXPIENT:               7 DE LE                     ACCESSXON NBR: 7812080123 QRIGINATQR. MITE, L.D.                                 COPIES RECEIVED:
7 DE LE ACCESSXON NBR: 7812080123 QRIGINATQR.
CQMPANy.         -ROCHESTER -GAS   & ELEC CORP       LTR
MITE, L.D.COPIES RECEIVED: CQMPANy.~-ROCHESTER-GAS&ELEC CORP LTR 1 ENCL 0  
                  ~
1         ENCL       0


==SUBJECT:==
==SUBJECT:==
SIZE: Summary 781004 meeting re: High Energy Line Breaks Inside Containment.
SIZE:
Addi info is being gathered on this subj.OIS TRIPUTION CODE t ADO i , D?8TR Te'UT ION TITLE!GFNERAL DISTRIBUTION FOR AFTER ISSUANCE OF UPFRATING LICENSE~NAHE REG F'PAR I 8, E OELb HANAUER CORF.aERFORHANCE BR AO FOR SYS 5 PROJ ENGINF./RING HP REACTno SAFFTY 8R" PLANT SYSTEMS RR'EB EFFLUENT TREAT SYS D BRINKMAH LPOR TERA NSIC ACRS W/7 ENCL W/ENCL W/ENCI.W/2 ENCl.I, TR ONLY W/ENCL W/ENCL W/ENCL W/ENCL W/EnlCL w/ENCL W/ENCL W/ENCL W/ENCL'A/ENCL w/ENCL W/ENCL W/t6 ENCL FOR ACTION ORBfj2 BC LL BC,.,..'G TOTAL NUMBER OF COPIES REClUIREO I LTR E>>Cl 40 39 NOTES-I&E-3 CYS ALL MATL  
Summary 781004 meeting re: High Energy Line Breaks Inside Containment. Addi info is being gathered on this subj .
OIS TRIPUTION CODE t         ADO   i
  , D?8TR Te'UT ION   TITLE!
GFNERAL DISTRIBUTION FOR AFTER ISSUANCE OF UPFRATING LICENSE ~
NAHE                                                   FOR ACTION REG     F W/7 ENCL                ORBfj2 BC LL    BC,.,   ..'G W/ENCL
            'PAR                    W/ENCI.
I  8,  E                    W/2 ENCl.
OELb                            I, TR ONLY HANAUER                        W/ENCL CORF. aERFORHANCE BR            W/ENCL AO FOR SYS 5 PROJ              W/ENCL ENGINF./RING HP                W/ENCL
"
REACTno SAFFTY 8R              W/EnlCL PLANT SYSTEMS RR                w/ENCL
'EB                                W/ENCL EFFLUENT TREAT SYS            W/ENCL D BRINKMAH                    W/ENCL LPOR                          'A/ENCL TERA                          w/ENCL NSIC                          W/ENCL ACRS                          W/t6     ENCL TOTAL NUMBER OF COPIES             REClUIREO I LTR       40 E>>Cl     39 NOTES-       I&E   3 CYS ALL MATL


REGULATORY DOCKET HLE COPY December 4, 1978 Director of Nuclear Reactor Regulation ATTN: Mr.Dennis L.Ziemann, Chief Operating Reactors Branch 42 U.S.Nuclear Regulatory Commission Washington, DC 20555  
REGULATORY DOCKET HLE COPY December 4, 1978 Director of Nuclear Reactor Regulation ATTN:   Mr. Dennis L. Ziemann, Chief Operating Reactors Branch 42 U.S. Nuclear Regulatory Commission Washington, DC 20555


==Dear Mr.Ziemann:==
==Dear Mr. Ziemann:==
Members of the Rochester Gas 6 Electric Corporation staff met with representatives of your staff on October 4, 1978 to discuss High Energy Line Breaks Inside Containment.
 
Since that time we have identified a preliminary list of high energy lines inside containment.
Members of the Rochester Gas 6 Electric Corporation staff met with representatives of your staff on October 4, 1978 to discuss High Energy Line Breaks Inside Containment. Since that time we have identified a preliminary list of high energy lines inside containment. Specific portions of those lines which may need to be analyzed for pipe whip or other effects of pipe rupture will be designated after a containment. inspection is completed during our upcoming refueling outage beginning in February, 1979.
Specific portions of those lines which may need to be analyzed for pipe whip or other effects of pipe rupture will be designated after a containment.
Westinghouse has retrieved from files information about original analyses performed for some of the piping lines inside contain-ment. It is anticipated that by January, 1979 they will have com-pleted a review of the original analyses and prepared a summary report.
inspection is completed during our upcoming refueling outage beginning in February, 1979.Westinghouse has retrieved from files information about original analyses performed for some of the piping lines inside contain-ment.It is anticipated that by January, 1979 they will have com-pleted a review of the original analyses and prepared a summary report.RG&E and Westinghouse are also preparing a program and schedule for resolution of this SEP topic.We expect.to be able to submit a detailed schedule in January 1979.Sincerely yours,~a/
RG&E and Westinghouse are also preparing a program and schedule for resolution of this SEP topic. We expect. to be able to submit a detailed schedule in January 1979.
y g","'.')7J(>l<~>A}}
Sincerely yours,
                                  ~a/
 
    ","'.')7J( >l <~>
y g A}}

Revision as of 21:14, 29 October 2019

Summary of 781004 Meeting Re High Energy Line Breaks Inside Containment.Addl Info Is Being Gathered on This Subj
ML17244A217
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/04/1978
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
TASK-03-05.A, TASK-3-5.A, TASK-RR NUDOCS 7812080123
Download: ML17244A217 (4)


Text

.

8UMTORM NFORMATXON DXSTRIBUTION ., TEM DOCKET NBR. 50-244/ 1 5 RE GINNA 1;STERLING DQC DATE: 781204 RECXPIENT: 7 DE LE ACCESSXON NBR: 7812080123 QRIGINATQR. MITE, L.D. COPIES RECEIVED:

CQMPANy. -ROCHESTER -GAS & ELEC CORP LTR

~

1 ENCL 0

SUBJECT:

SIZE:

Summary 781004 meeting re: High Energy Line Breaks Inside Containment. Addi info is being gathered on this subj .

OIS TRIPUTION CODE t ADO i

, D?8TR Te'UT ION TITLE!

GFNERAL DISTRIBUTION FOR AFTER ISSUANCE OF UPFRATING LICENSE ~

NAHE FOR ACTION REG F W/7 ENCL ORBfj2 BC LL BC,., ..'G W/ENCL

'PAR W/ENCI.

I 8, E W/2 ENCl.

OELb I, TR ONLY HANAUER W/ENCL CORF. aERFORHANCE BR W/ENCL AO FOR SYS 5 PROJ W/ENCL ENGINF./RING HP W/ENCL

"

REACTno SAFFTY 8R W/EnlCL PLANT SYSTEMS RR w/ENCL

'EB W/ENCL EFFLUENT TREAT SYS W/ENCL D BRINKMAH W/ENCL LPOR 'A/ENCL TERA w/ENCL NSIC W/ENCL ACRS W/t6 ENCL TOTAL NUMBER OF COPIES REClUIREO I LTR 40 E>>Cl 39 NOTES- I&E 3 CYS ALL MATL

REGULATORY DOCKET HLE COPY December 4, 1978 Director of Nuclear Reactor Regulation ATTN: Mr. Dennis L. Ziemann, Chief Operating Reactors Branch 42 U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Ziemann:

Members of the Rochester Gas 6 Electric Corporation staff met with representatives of your staff on October 4, 1978 to discuss High Energy Line Breaks Inside Containment. Since that time we have identified a preliminary list of high energy lines inside containment. Specific portions of those lines which may need to be analyzed for pipe whip or other effects of pipe rupture will be designated after a containment. inspection is completed during our upcoming refueling outage beginning in February, 1979.

Westinghouse has retrieved from files information about original analyses performed for some of the piping lines inside contain-ment. It is anticipated that by January, 1979 they will have com-pleted a review of the original analyses and prepared a summary report.

RG&E and Westinghouse are also preparing a program and schedule for resolution of this SEP topic. We expect. to be able to submit a detailed schedule in January 1979.

Sincerely yours,

~a/

","'.')7J( >l <~>

y g A