Text
. 8UMTORM NFORMATXON DXSTRIBUTION TEM DOCKET NBR.
50-244/
5 RE GINNA 1;STERLING DQC DATE:
781204 1
RECXPIENT:
7 DE LE ACCESSXON NBR:
7812080123 QRIGINATQR. MITE, L.D.
COPIES RECEIVED:
CQMPANy.
~
-ROCHESTER -GAS
& ELEC CORP LTR 1
ENCL 0
SUBJECT:
SIZE:
Summary 781004 meeting re:
High Energy Line Breaks Inside Containment.
Addi info is being gathered on this subj OIS TRIPUTION CODE t ADO i
, D?8TR Te'UT ION TITLE!
GFNERAL DISTRIBUTION FOR AFTER ISSUANCE OF UPFRATING LICENSE ~
NAHE REG F
'PAR I
8, E
OELb HANAUER CORF.
aERFORHANCE BR AO FOR SYS 5
PROJ ENGINF./RING HP REACTno SAFFTY 8R
" PLANT SYSTEMS RR
'EB EFFLUENT TREAT SYS D BRINKMAH LPOR TERA NSIC ACRS W/7 ENCL W/ENCL W/ENCI.
W/2 ENCl.
I, TR ONLY W/ENCL W/ENCL W/ENCL W/ENCL W/EnlCL w/ENCL W/ENCL W/ENCL W/ENCL
'A/ENCL w/ENCL W/ENCL W/t6 ENCL FOR ACTION ORBfj2 BC LL BC,.,..'G TOTAL NUMBER OF COPIES REClUIREO I LTR E>>Cl 40 39 NOTES-I & E 3 CYS ALL MATL
REGULATORY DOCKET HLE COPY December 4,
1978 Director of Nuclear Reactor Regulation ATTN:
Mr. Dennis L. Ziemann, Chief Operating Reactors Branch 42 U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Ziemann:
Members of the Rochester Gas 6 Electric Corporation staff met with representatives of your staff on October 4, 1978 to discuss High Energy Line Breaks Inside Containment.
Since that time we have identified a preliminary list of high energy lines inside containment.
Specific portions of those lines which may need to be analyzed for pipe whip or other effects of pipe rupture will be designated after a containment.
inspection is completed during our upcoming refueling outage beginning in February, 1979.
Westinghouse has retrieved from files information about original analyses performed for some of the piping lines inside contain-ment. It is anticipated that by January, 1979 they will have com-pleted a review of the original analyses and prepared a summary report.
RG&E and Westinghouse are also preparing a program and schedule for resolution of this SEP topic.
We expect. to be able to submit a detailed schedule in January 1979.