* consumers Power POW ERi Nii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 April 23, 1992 Nuclear Regulatory Commission Document Control Desk Washington, DC *20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -10CFR21 REPORT OF ALLIS CHALMERS SWITCHGEAR BREAKERS REFURBISHED BY SITEK OF MILWAUKEE
      .i consumers
* GB Slade General Manager The following information is provided with respect to a 10CFR21 reportable occurrence.
                                                                      *
at Palisades.
* Power                                                     GB Slade General Manager POWERiNii MICHlliAN'S PROliRESS Palisades Nuclear Plant:         27780 Blue Star Memorial Highway, Covert, Ml 49043 April 23, 1992 Nuclear Regulatory Commission Document Control Desk Washington, DC *20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
A thirty day written follow up report will be submitted.
10CFR21 REPORT OF ALLIS CHALMERS SWITCHGEAR BREAKERS REFURBISHED BY SITEK OF MILWAUKEE The following information is provided with respect to a 10CFR21 reportable occurrence. at Palisades. A thirty day written follow up report will be submitted.
On April 15,1992, the evaluation of improperly terminated wires on the closing relay for the 2400V switchgear breaker to P-66A, High Pressure Safety Injection Pump was determined to be 10CFR21 reportable.
On April 15,1992, the evaluation of improperly terminated wires on the closing relay for the 2400V switchgear breaker to P-66A, High Pressure Safety Injection Pump was determined to be 10CFR21 reportable. These improper wire terminations were completed during a solenoid operated breaker refurbishment by Sitek of Milwaukee. Seven 2400V solenoid operated breakers from the Palisades Plant were sent to Sitek of Milwaukee for refurbishment. We believe that all seven solenoid operated breakers have the improper wire terminations.
These improper wire terminations were completed during a solenoid operated breaker refurbishment by Sitek of Milwaukee.
One of the breakers supplies power to the safety related HPSI pump, while the other six breakers supply non-safety grade equipment. To date four breakers (including the safety related one) have been inspected and fixed and all exhibited the same problem. The remaining three breakers will be inspected at a later date.
Seven 2400V solenoid operated breakers from the Palisades Plant were sent to Sitek of Milwaukee for refurbishment.
* No operational problems due to the improper terminations have been noted on any of the affected breakers. Problems expected if the terminations came loose would be a failure of the breaker to close. At the present time all the uninspected breakers are closed.
We believe that all seven solenoid operated breakers have the improper wire terminations.
The original procurement of these breakers was before the IEEE standards were developed. These breakers were bought as commercial items and grandfathered to class lE. These breakers were refurbished by Sitek of Milwaukee, who did not have a quality program, and Consumers Power Co. applied our QA program and 10CFR21 reportability.
One of the breakers supplies power to the safety related HPSI pump, while the other six breakers supply non-safety grade equipment.
Ct7 t!.u r. ~ 0 J         , j '-' ,..,,,_
To date four breakers (including the safety related one) have been inspected and fixed and all exhibited the same problem. The remaining three breakers will be inspected at a later date.
( __9_2_0-:5::-:0::-::7::':0::-:1;-;2~4~9;;,2;;;0~4,.;2;;>3;;;------r---\
* No operational problems due to the improper terminations have been noted on any of the affected breakers.
P DR A.DOCK 05000255 l    S               .                         PDR                       A CMS' ENERGY COMPANY
Problems expected if the terminations came loose would be a failure of the breaker to close. At the present time all the uninspected breakers are closed. The original procurement of these breakers was before the IEEE standards were developed.
 
These breakers were bought as commercial items and grandfathered to class lE. These breakers were refurbished by Sitek of Milwaukee, who did not have a quality program, and Consumers Power Co. applied our QA program and 10CFR21 reportability.
                    *
C t7 t!. r. 0 J u ,j '-' ,..,,,_ ( __
* The detailed information required by the NRC is attached. Sitek has state-d they have not supplied any nuclear plant other than Palisades.
ll P DR A.DOCK 05000255 S . PDR A CMS' ENERGY COMPANY
~~
*
General Manager CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment
* The detailed information required by the NRC is attached.
 
Sitek has state-d they have not supplied any nuclear plant other than Palisades. General Manager CC Administrator, Region III, USNRC NRC Resident Inspector  
-Palisades Attachment
,-;; ...
,-;; ...
* ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255
            *
* 10CFR21 REPORT ON ALLIS CHALMERS SWITCHGEAR BREAKERS REFURBISHED BY SITEK OF MILWAUKEE 4/23/92 3 Pages
* ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 10CFR21 REPORT ON ALLIS CHALMERS SWITCHGEAR BREAKERS REFURBISHED BY SITEK OF MILWAUKEE 4/23/92 3 Pages
*' *
 
* 10CFR21 REPORT I. Name and address of individual informing the NRC. P. M. Donnelly, Director of Plant Safety and Licensing Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043 2. The basic component which contains defects. Allis Chalmers 2400/4160 V switchgear
*'                     *
: 3. The firm supplying the basic component which contained a defect. Allis Chalmers 2400/4160 V switchgear refurbished by Sitek of Milwaukee formerly Seimens Energy and Automation P.O.Box 2387 5700 W. Hemlock Milwaukee, Wi 53223 4a. Nature of the defect. The wires on the closing circuit relay {52X) were improperly landed. See attached sketch. 4b. The safety hazard which could be created by such a defect. The breaker may fail to close when required if the wires come detached from the terminals.
* 10CFR21 REPORT I. Name and address of individual informing the NRC.
P. M. Donnelly, Director of Plant Safety and Licensing Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043
: 2. The basic component which contains defects.
Allis Chalmers 2400/4160 V switchgear
: 3. The firm supplying the basic component which contained a defect.
Allis Chalmers 2400/4160 V switchgear refurbished by Sitek of Milwaukee formerly Seimens Energy and Automation P.O.Box 2387 5700 W. Hemlock Milwaukee, Wi 53223 4a. Nature of the defect.
The wires on the closing circuit relay {52X) were improperly landed.
See attached sketch.
4b. The safety hazard which could be created by such a defect.
The breaker may fail to close when required if the wires come detached from the terminals.
: 5. The date when information of the defect was obtained.
: 5. The date when information of the defect was obtained.
The improper was first noted on 3/20/92 and corrected on the initial breaker on 3/24/92. It was subsequently evaluated and linked to the refurbishment
The improper terminatio~ was first noted on 3/20/92 and corrected on the initial breaker on 3/24/92. It was subsequently evaluated and linked to the refurbishment _of the breakers on 4/15/92.
_of the breakers on 4/15/92. 6. The number and location of all such components subject to this Part 21 Sitek of Milwaukee has stated that the only nuclear facility to whom they have supplied refurbished breakers is Palisades.
: 6. The number and location of all such components subject to this Part 21 Sitek of Milwaukee has stated that the only nuclear facility to whom they have supplied refurbished breakers is Palisades. Palisades has identified seven (7) solenoid operated breakers which are affected.
Palisades has identified seven (7) solenoid operated breakers which are affected.
Stored energy breakers also refurbished by Sitek do not contain the affected closing relay and therefore are not affected by this Part 21.
Stored energy breakers also refurbished by Sitek do not contain the affected closing relay and therefore are not affected by this Part 21. All seven breakers are.installed in the Palisades Plant. Four of the seven have been inspected and found to contain the improper terminations.
All seven breakers are.installed in the Palisades Plant. Four of the seven have been inspected and found to contain the improper terminations.
These terminations were corrected on those four breakers.
These terminations were corrected on those four breakers. The remaining three are installed on a non-safety related bus and are presently closed.
The remaining three are installed on a non-safety related bus and are presently closed. Palisades will inspect those breakers at a future date.
Palisades will inspect those breakers at a future date.
 
. *.
. *.
* 10CFR21 REPORT 7a. The corrective action planned or taken. Sitek of Milwaukee:
* 10CFR21 REPORT
Not known at this time. Palisades:
* 7a. The corrective action planned or taken.
Inspect and repair the breakers.
Sitek of Milwaukee: Not known at this time.
* 7b. The name of the individual responsible for the corrective action. Sitek of Milwaukee:
Palisades: Inspect and repair the breakers.
Roger Laurenz (414) 358-0005 Palisades:
7b. The name of the individual responsible for the corrective action.
R.B. Kasper 7c. The length of time required to complete the corrective action. Sitek of Milwaukee:
Sitek of Milwaukee: Roger Laurenz (414) 358-0005 Palisades: R.B. Kasper 7c. The length of time required to complete the corrective action.
To Be Determined Palisades:
Sitek of Milwaukee: To Be Determined Palisades: To Be Determined
To Be Determined
: 8. Any advice related to the defect that has been, is being, or   ~ill be given from the supplier.
: 8. Any advice related to the defect that has been, is being, or be given from the supplier.
Sitek of Milwaukee has stated that. Palisade~ is the only nuclear facility to whom th~y have supplied refurbished breakers.
Sitek of Milwaukee has stated that.
The original procurement of these breakers was before the IEEE standards were developed. These breakers were bought as commercial items and grandfathered to class IE. These breakers were refurbished by Sitek of Milwaukee, who did not have a quality program, and Consumers Power Co.
is the only nuclear facility to whom have supplied refurbished breakers.
applied our QA program and IOCFR21 reportability.
The original procurement of these breakers was before the IEEE standards were developed.
 
These breakers were bought as commercial items and grandfathered to class IE. These breakers were refurbished by Sitek of Milwaukee, who did not have a quality program, and Consumers Power Co. applied our QA program and IOCFR21 reportability.
                                                                                          '*
* 1f1'1111WY::?...L
                                        ~.-'/VO~
_i.::>t;;tJ.hO O.SX Id *  
1f1'1111WY::?...L O~Xl.-1 f..,o~-~SI
...__
                                                    ...__ .J...:)3~f~O :>NI.
:>NI. 1111 -t ,, " . '*}}
_i.::>t;;tJ.hO~
7~/'YIW~..iU. O.SX Id
*
* 1111 - t
                                                                                ,,
                                                                                  .~
                                                                                      " .}}

Revision as of 19:17, 21 October 2019

Part 21 Rept Re Improperly Terminated Wires on Closing Relay for 2,400-volt Switchgear Mfg by Allis Chalmers & Refurbished by Sitek of Milwaukee.Corrective Actions Not Yet Determined.Palisades Only Facility W/Subj Defect
ML18058A413
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/23/1992
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-92 NUDOCS 9205070124
Download: ML18058A413 (6)


Text

  • ,:

.i consumers

  • Power GB Slade General Manager POWERiNii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 April 23, 1992 Nuclear Regulatory Commission Document Control Desk Washington, DC *20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

10CFR21 REPORT OF ALLIS CHALMERS SWITCHGEAR BREAKERS REFURBISHED BY SITEK OF MILWAUKEE The following information is provided with respect to a 10CFR21 reportable occurrence. at Palisades. A thirty day written follow up report will be submitted.

On April 15,1992, the evaluation of improperly terminated wires on the closing relay for the 2400V switchgear breaker to P-66A, High Pressure Safety Injection Pump was determined to be 10CFR21 reportable. These improper wire terminations were completed during a solenoid operated breaker refurbishment by Sitek of Milwaukee. Seven 2400V solenoid operated breakers from the Palisades Plant were sent to Sitek of Milwaukee for refurbishment. We believe that all seven solenoid operated breakers have the improper wire terminations.

One of the breakers supplies power to the safety related HPSI pump, while the other six breakers supply non-safety grade equipment. To date four breakers (including the safety related one) have been inspected and fixed and all exhibited the same problem. The remaining three breakers will be inspected at a later date.

  • No operational problems due to the improper terminations have been noted on any of the affected breakers. Problems expected if the terminations came loose would be a failure of the breaker to close. At the present time all the uninspected breakers are closed.

The original procurement of these breakers was before the IEEE standards were developed. These breakers were bought as commercial items and grandfathered to class lE. These breakers were refurbished by Sitek of Milwaukee, who did not have a quality program, and Consumers Power Co. applied our QA program and 10CFR21 reportability.

Ct7 t!.u r. ~ 0 J , j '-' ,..,,,_

( __9_2_0-:5::-:0::-::7::':0::-:1;-;2~4~9;;,2;;;0~4,.;2;;>3;;;------r---\

P DR A.DOCK 05000255 l S . PDR A CMS' ENERGY COMPANY

  • The detailed information required by the NRC is attached. Sitek has state-d they have not supplied any nuclear plant other than Palisades.

~~

General Manager CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment

,-;; ...

  • ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 10CFR21 REPORT ON ALLIS CHALMERS SWITCHGEAR BREAKERS REFURBISHED BY SITEK OF MILWAUKEE 4/23/92 3 Pages
  • ' *
  • 10CFR21 REPORT I. Name and address of individual informing the NRC.

P. M. Donnelly, Director of Plant Safety and Licensing Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043

2. The basic component which contains defects.

Allis Chalmers 2400/4160 V switchgear

3. The firm supplying the basic component which contained a defect.

Allis Chalmers 2400/4160 V switchgear refurbished by Sitek of Milwaukee formerly Seimens Energy and Automation P.O.Box 2387 5700 W. Hemlock Milwaukee, Wi 53223 4a. Nature of the defect.

The wires on the closing circuit relay {52X) were improperly landed.

See attached sketch.

4b. The safety hazard which could be created by such a defect.

The breaker may fail to close when required if the wires come detached from the terminals.

5. The date when information of the defect was obtained.

The improper terminatio~ was first noted on 3/20/92 and corrected on the initial breaker on 3/24/92. It was subsequently evaluated and linked to the refurbishment _of the breakers on 4/15/92.

6. The number and location of all such components subject to this Part 21 Sitek of Milwaukee has stated that the only nuclear facility to whom they have supplied refurbished breakers is Palisades. Palisades has identified seven (7) solenoid operated breakers which are affected.

Stored energy breakers also refurbished by Sitek do not contain the affected closing relay and therefore are not affected by this Part 21.

All seven breakers are.installed in the Palisades Plant. Four of the seven have been inspected and found to contain the improper terminations.

These terminations were corrected on those four breakers. The remaining three are installed on a non-safety related bus and are presently closed.

Palisades will inspect those breakers at a future date.

. *.

  • 7a. The corrective action planned or taken.

Sitek of Milwaukee: Not known at this time.

Palisades: Inspect and repair the breakers.

7b. The name of the individual responsible for the corrective action.

Sitek of Milwaukee: Roger Laurenz (414) 358-0005 Palisades: R.B. Kasper 7c. The length of time required to complete the corrective action.

Sitek of Milwaukee: To Be Determined Palisades: To Be Determined

8. Any advice related to the defect that has been, is being, or ~ill be given from the supplier.

Sitek of Milwaukee has stated that. Palisade~ is the only nuclear facility to whom th~y have supplied refurbished breakers.

The original procurement of these breakers was before the IEEE standards were developed. These breakers were bought as commercial items and grandfathered to class IE. These breakers were refurbished by Sitek of Milwaukee, who did not have a quality program, and Consumers Power Co.

applied our QA program and IOCFR21 reportability.

'*