Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML18066A3301998-11-11011 November 1998 Part 21 Rept Re Potential Safety Hazard Associated with Wrist Pin Assemblies for FM-Alco 251 Engines at Palisades Nuclear Power Plant.Caused by Insufficient Friction Fit Between Pin & Sleeve.Supplier of Pin Will No Longer Be Used ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML18066A1711998-06-0101 June 1998 Part 21 Rept Re Impact of RELAP4 Excessive Variability on Palisades Large Break LOCA ECCS Results.Change in PCT Between Cycle 13 & Cycle 14 Does Not Constitute Significant Change Per 10CFR50.46 ML18065B1351998-01-0606 January 1998 Part 21 Rept Re Use of Deltstrat Code for RCS Flow Rate Determination.Code Corrects for Temps to Determine Hot Leg Bulk Coolant Temp ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause ML18065B0111996-10-18018 October 1996 Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology ML18065A5001996-02-15015 February 1996 Part 21 Rept Re Hex Bolts Mfg by Cardinal Industrial Products (Cip).Aerofin Will Provide Replacement Bolts for Bolts in Question If Util Notify Aerofin in Writing within 30 Days of Date of ltr.10CFR21 Rept from CIP Encl ML18065A1441995-10-0404 October 1995 Part 21 Rept Re Fastener Products (Hex Bolts) Mfg by Cardinal Industrial Products.Bolts Used as Header Cover Plate Bolts in Safety Related Containment Air Cooler Replacement Cooling Coils Furnished by Aerofin Corp to CPC ML18064A8841995-08-30030 August 1995 Part 21 Rept Re Presence of Hardwired Connection in Each of Four Containment High Pressure Trip Logic Circuits.Jumpers Removed in Slot 11 of Interconnection Module Assemblies in All Four Channels ML18058B9021993-07-0101 July 1993 Part 21 Rept Re Potential Defect in Vicor Corp mini-mod Dc/ DC Converter Modules.Deficiency Identified During Failure Analysis of Subj Modules While in Svc at Palisades in Apr 1993.Affected Dc/Dc Converter Modules at Plant Replaced ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML18058B0201992-08-24024 August 1992 Part 21 Rept Re 920513 & 0701,premature Lifting of Farris Safety Relief Valve RV-3128 & SI Tank T-82B Relief Valve. Initially Reported on 920701.Caused by Misalignment of Spring Adjustment Screw Bore.Bonnet & Spring Replaced ML18058B0051992-07-30030 July 1992 Part 21 Rept 23967:on 920513 & 0701,Farris Relief Valve RV-3128 & SI Tank Relief Valve T-82B Lifted Prematurely. Caused by Misalignment of Spring Adjustment Screw Bore in Valve Bonnet.Util Has 23 Subj Valves in Facility ML18058A4551992-05-15015 May 1992 Part 21 Rept Re Allis Chambers Switchgear Breakers Refurbished by Sitek of Milwaukee.Original Procurement of Breakers Before IEEE Stds Were Developed.Breakers Sent to Sitek of Milwaukee for Refurbishment ML18058A4131992-04-23023 April 1992 Part 21 Rept Re Improperly Terminated Wires on Closing Relay for 2,400-volt Switchgear Mfg by Allis Chalmers & Refurbished by Sitek of Milwaukee.Corrective Actions Not Yet Determined.Palisades Only Facility W/Subj Defect ML18054B4681990-02-27027 February 1990 Part 21 Rept Re Defective PORV Block Valve W/Limitorque Actuator Type SMB-00-25.Caused by Missing Pin That Connects Limit Switch Drive Gear to Main Actuator Drive Train.Valve Actuator Disassembled to Find Cause of Malfunction ML20005G6831990-01-0505 January 1990 Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced ML18054B0931989-11-0909 November 1989 Part 21 Rept Re Siemens-Allis Breaker mis-wired During Refurbishment Resulting in Blowing of Breaker Fuse.Caused by Vendor Error.Vendor Corrected Drawing File ML18054B1331989-11-0606 November 1989 Part 21 Rept Re Defect in Rockbestos Electrical Cable W/ Incorrect Shield Matl Supplied to Plant.Util Has Identified & Dispositioned Affected Cable Onsite.Rockbestos Has Shipped Replacement Cable & Authorized Return of Defective Cable ML18054A4711988-12-22022 December 1988 Part 21 Rept Re Deficiencies in Sample-Webtrol,Inc Masoneilan Valve Parts.Initially Reported on 881021.All Suspect Matl Remaining in Warehouse Pulled & Being Controlled ML18053A6731988-11-18018 November 1988 Part 21 Rept Re Potential for Counterfeit Masoneilan Valve Parts Being Supplied to Commercial Nuclear Facilities. All Identified Parts from Plant Named in 881021 Rept Segregated & Replaced.Independent Investigation Underway ML18054A3961988-10-21021 October 1988 Part 21 Rept Re Masoneilan Valve Parts Supplied by Sample- Webtrol,Inc Not Meeting Specs.Initially Reported on 881018. Matl in Warehouse Pulled & Location of Issued Matl Being Identified for Disposition or Replacement ML20127L4521988-10-21021 October 1988 Part 21 & Deficiency Rept Re Info on Discovery That Some Masoneilan Valve Parts Supplied by Samole-Webtrol Inc Are Not Genuine.Also Confirms 881018 Telcon Rept Re Notification Criteria of 10CFR21.21(b)(2) ML18054A3071988-05-25025 May 1988 Part 21 Rept Re Failure of Ashcroft Glycerin Filled Bourdon Tube Pressure Gauges That Failed at Pressure within Operating Range.Caused by Separated Weld.Faulty Gauges Replaced ML18053A3891988-05-20020 May 1988 Part 21 Rept Re Missing Cotter Pin in Ite Breaker Trip Mechanism Resulting in Breaker Failing to Close.Initially Reported on 880513.Breaker Repaired,Cotter Pin Inserted & Breaker Reinstalled ML18053A3641988-05-0202 May 1988 Part 21 Rept Re Inaccurate 1,000 Ppm Boron Std Used to Standardize Titrant Used for Boron Concentration Analysis. Initially Reported on 880429.All Suspect Matl Removed & Labeled Not for Use ML20215G2441987-06-16016 June 1987 Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment ML20209G1911986-08-13013 August 1986 Part 21 Rept Re Enerfab,Inc Containment Bldg Emergency Escape Airlock Design Deficiency.Initially Reported on 860724.Two Actuating Cams for Inner & Outer Equalizing Valves Modified ML20206S0841986-06-30030 June 1986 Part 21 Rept Re Possible Cut Wires in Wire Harness of Bbc Brown Boveri K600/K800 Circuit Breakers.Initially Reported on 860509.Safety Implications Listed.Gear Guard Designed to Prevent Cut Wires ML20140A5281985-12-19019 December 1985 Part 21 Rept Forwarding Ltr Sent to Customers Re Check Valves Missing Lock Welds on Hinge Supports or Hinge Support Capscrews,Per 851121 Request.List of Customers Receiving Ltr Also Encl ML20087F4281984-02-29029 February 1984 Part 21 Rept Re Apparent Design Deficiency in Siemens Allis Model MA-205B Stored Energy Circuit Breaker.Breaker Insp & Hold Down Device Orientation Will Be Complete by 840401. Determination of Permanent Fix & Implementation by 840601 ML20083E1881983-12-14014 December 1983 Supplemental Part 21 Rept Re Incorrect Boron Stds Purchased from Jt Baker Chemical Co.Initially Reported on 821222. Independent Evaluation Revealed Ph of Boron Std Too Low. Titration Procedure Appropriate & Will Continue to Be Used ML20080N9701983-09-30030 September 1983 Part 21 Deficiency Rept Re Defective ITT-Grinnell Hydraulic Snubbers.Initially Reported in 830928 Telcon.Deficient Snubber Valve Blocks Will Be Remachined & Snubbers Rebuilt ML20072N9891983-07-0808 July 1983 Interim Part 21 Rept Confirming 830705 Telcon Re Anomalies in Artificially Aged Apparatus (Using Ahrrenius Methodology W/Elevated Temp Aging).Deficiency Found During Qualification Testing for IEEE 323-1974.Draft Notices Encl ML20028C2521982-12-22022 December 1982 Part 21 Rept Re Jt Baker Chemical Co Defective 1,000 Ppm Boron Std Used for Standardization of Sodium Hydroxide to Determine Primary Coolant Sys Boron Concentration.Initially Reported 821220.Another Supplier Used ML20041F1911982-03-0303 March 1982 Part 21 Rept Re Defective Diesel Generator Governor Mfg by Woodward Governor Co Initially Reported 820226.Lock Washer & Nut Missing from Shutdown Solenoid & Broken Nut Found Inside Assembly.Governor Replaced & Returned for Repair ML20038C6741981-12-0303 December 1981 Part 21 Rept Re Weld Fractures Possibly Attributable to Modified Installation Procedure for Mounting of Battery Rack.Encl Notices Have Been Sent to Facilities Receiving Similar Frames for L Size Cell Racks ML20038A8711981-11-23023 November 1981 Advises That Sectioned Frame Welds Will Be Examined on Receipt from Bechtel,Compared W/Welds on Rack Qualified at Wyle Labs on 761116 & Examined in Light of Installation Conditions Observed by C&D Personnel at Site 811014-15 ML20011A5791981-10-21021 October 1981 Part 21 Rept Re Welded Subassemblies Found to Have Welds W/Lack of Acceptable Weld Deposit to Base Metal Fusion, Initially Reported 811020.Replacement Racks Have Been Fabricated & Are Being Installed ML18045A8201980-10-17017 October 1980 Part 21 Rept Re Pipe Supports W/Partially or Totally self- Aligning Rod End Bushings.Info Submitted to Other Bechtel Power Divs on 801008 for Review.Rept Will Be Provided If Defect Applies to Other Bechtel Projects ML18045A8021980-10-0808 October 1980 Part 21 Rept Re Pipe Supports W/Partially or Totally Disengaged self-aligning Rod End Bushings Furnished by Itt Grinell,Corner & Lada,Pacific Scientific-Kintech Div & NPS Industries ML19270G4771979-05-11011 May 1979 Natl Pollution Discharge Elimination Sys 790507 Noncompliance Notification Re Excessive Neutralizer Tank Discharge.Caused by Operating Errors.Discharge Procedures Discussed W/Operators ML19290A4731973-08-17017 August 1973 Deficiency Rept Re Grease Leakage Discovered on 730720 from 2090P Casing Filler Mfg by Viscosity Oil Co Into Vertical Tendon Conduits.Liner Plate Checked & No Bulging or Buckling Found.Samples of Leaking Matl Taken 1998-08-13
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18066A6901999-11-0101 November 1999 Rev 5 to Palisades Nuclear Plant Colr. ML18066A6761999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant ML18066A6271999-09-0202 September 1999 LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr ML18066A6351999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant ML18066A6771999-08-31031 August 1999 Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant ML18066A6221999-08-20020 August 1999 LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr ML18066A6061999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr ML18066A5201999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr ML18066A4841999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr ML18066A6371999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18068A5941999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr ML18066A4161999-04-0101 April 1999 Rev 4 to COLR, for Palisades Nuclear Plant ML18066A4501999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr ML18066A4671999-03-31031 March 1999 Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant. ML18068A5351999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With 990302 Ltr ML18066A3931999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With 990202 Ltr ML18066A3781999-01-20020 January 1999 LER 98-013-00:on 981222,safeguards Transfer Tap Changer Failure Caused Inadvertant DG Start.Caused by Failed Motor Contactor.Contactor Was Replaced.With 990120 Ltr ML20206F6131998-12-31031 December 1998 1998 Consumers Energy Co Annual Rept. with ML18066A3651998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr ML18066A3421998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With 981202 Ltr ML18066A3301998-11-11011 November 1998 Part 21 Rept Re Potential Safety Hazard Associated with Wrist Pin Assemblies for FM-Alco 251 Engines at Palisades Nuclear Power Plant.Caused by Insufficient Friction Fit Between Pin & Sleeve.Supplier of Pin Will No Longer Be Used ML18068A4921998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With 981103 Ltr ML18068A4851998-10-29029 October 1998 LER 97-011-01:on 971012,starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps Occurred.Caused by Inadequate Procedures & Operator Decision.Sop Used for Starting Primary Coolant Pump Enhanced ML18066A3181998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Palisades Nuclear Plant ML18066A2901998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Palisades Nuclear Power Plant.With 980903 Ltr ML18066A3191998-08-31031 August 1998 Revised Monthly Operating Rept Data for Aug 1998 for Palisades Nuclear Plant ML18066A2831998-08-18018 August 1998 LER 98-010-00:on 980721,reactor Manually Tripped.Caused by Failure of Coupling Which Drives Feedwater Pump Main Lube Oil Pump.Main Lube Oil Pump Coupling & Associated Components Replaced & Satisfactorily Tested ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237E0301998-07-31031 July 1998 ISI Rept 3-3 ML18066A2701998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Palisades Nuclear Plant.W/980803 Ltr ML18066A2311998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Palisades Nuclear Plant ML18066A2261998-06-30030 June 1998 LER 98-009-00:on 980531,small Pinhole Leak Found on One of Welds,During Leak Test Following Replacement of Pcs Sample Isolation Valves.Caused by Welder Error.Leaking Welds Repaired ML18066A3061998-06-18018 June 1998 SG Tube Inservice Insp. ML20249C4951998-06-17017 June 1998 Rev 1 to EA-GEJ-98-01, Palisades Cycle 14 Disposition of Events Review ML18066A1781998-06-0909 June 1998 LER 98-008-00:on 980511,noted That Procedure Did Not Fully Satisfy Requirement to Test High Startup Rate Trip Function. Caused by Misunderstanding of Testing Requirements.Revised TS Surveillance Test Procedure & Reviewed Other Procedures ML18066A1711998-06-0101 June 1998 Part 21 Rept Re Impact of RELAP4 Excessive Variability on Palisades Large Break LOCA ECCS Results.Change in PCT Between Cycle 13 & Cycle 14 Does Not Constitute Significant Change Per 10CFR50.46 ML18066A1741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Palisades Nuclear Plant.W/980601 Ltr ML18066A2321998-05-31031 May 1998 Revised MOR for May 1998 for Palisades Nuclear Plant ML18068A4701998-05-31031 May 1998 Annual Rept of Changes in ECCS Models Per 10CFR50.46. ML18065B2451998-05-13013 May 1998 LER 98-007-00:on 980413,HPIS Sys Was Noted Inoperable During TS Surveillance Test.Caused by Performance of Flawed Procedure.Operators & Engineers Will Be Trained to Improve Operational Decision Making Through Resources & Knowledge ML18066A2331998-04-30030 April 1998 Revised MOR for Apr 1998 for Palisades Nuclear Plant ML18068A3461998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Palisades Nuclear Plant.W/980501 Ltr ML18066A3411998-04-22022 April 1998 Rev 0 to EMF-98-013, Palisades Cycle 14:Disposition & Analysis of SRP Chapter 15 Events. ML18065B2071998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Palisades Nuclear Plant.W/980403 Ltr ML20217C2741998-03-31031 March 1998 Independent Review - Is Consumers Energy Method (W Method) of Determining Palisades Nuclear Plant Best Estimate Fluence by Combining Transport Calculation & Dosimetry Measurements Technically Sound & Does It Meet Intent of Pts ML18066A2341998-03-31031 March 1998 Revised MOR for Mar 1998 for Palisades Nuclear Plant ML18068A3041998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Palisades Nuclear Plant.W/980302 Ltr ML18066A2351998-02-28028 February 1998 Revised MOR for Feb 1998 for Palisades Nuclear Plant ML18065B1641998-02-0505 February 1998 Rev 0 to Regression Analysis for Containment Prestressing Sys at 25th Year Surveillance. ML18067A8211998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Palisades Nuclear Plant.W/980203 Ltr 1999-09-30
[Table view] |
Text
.-. -. .. . . - _. - - - ._- . - _ _ - - . - - _ - - - . - - . . . _ . . - . - _
+ ;
i .
f .
f 4 00ii!UmMS
- POWBf
~' - POWERING i MICHIGAN 5 PROGRE55 c.~ ,.i on. : ins n.n r....n no.o. J.<6 oa, w mos . isivi tes osso
]
i October 21, 1968 i
i Nuclear Regulatory Commission i Document Centrol Desk 3 Washington, DC 20555 i
i
! DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
MASONEILAN VALVE PARTS DEFICIENCIES l The attached 10CFR21 Report provides information on the discovery that some j Hasoneilan valve parts supplied by Sample-Vebtrol Inc. are not genuine.
, This correspondence confirms a telecon report made to VLAxelson of the i Region III staff on October 18, 1988 and thus conforirs with the notification l criteria of 10CFR21.21(b)(2) .-
1 l, '
Brian D Johnson i Staff Licensing Engineer i
! CC Administrator, Region III. NRC l NEC Resident Inspector - Palisades
. Attachment
?
d 5
a
'I.
4 t
OC10SE-0179-NLO2 9301270159 921005-PDR FDIA CORTE92-231' PDR-
_ _ . - - . . _ - . . _ _ _ , _ . . . . . . _ _ . - - - . ~ . _ . - . . - _ _ . _..m. . . - - -
(
i , ,
1 4
L ATTACHMENT Consumers Power Company Palisades Plant j Docket 50-255 4
MASONE11AN VAI.VE PARTS DEFICIENCIES -
October 21, 1988 i
i i
e A
I i
J e
h 2 Pages OC1088-0179-NLO2
l l
i MASONEILAN VALVE INTERNALS DEFICIENCY 10CTR21 REPORT l
l The following information should be provided to the Nuclear Licensing Administrator when a deficiency is considered to be reportable under Part 21:
- 1) Name and Address of . It dividual informing the Commission (to be filled in by the Nuclear Licensing Administrator),
- a. Telecon: DJMalone
- Palisades Plant Consumers Power Company 1
- b. Written: BDJohnson, P24-606 l
Consumers Power Company 1945 W Parnall Road 4 Jackson, MI 49201
- 2) Facility Identification, activity or basic component which fails to comply or contains defects is:
Masoneflan valve internals (parts) procured from Sample - Webtrol Inc for use on the Palisades Nuclear Plant, i
- 3) The fire constructing facility or supplying the basic component which failed to comply or contained defect is:
! Sample - Vebtrol Inc
- 4) a. Nature of defect or failure to comply is:
, Manoneflan valve internals (parts) procured from Sample - Webtrol as CQ (commercial grade) or non - Q were not genuine Mar.onellan parts.
Parts were manufactured by CVS Inc and Cor-Val.
I
- b. The safety hazard which was or could be created is:
i
. Parts dedicated for use in' basic components may not meet Masoneflan specifications.
- 5) The date when information of defect or, f ailure to comply was obtained is:
Responsible CPCo personnel informed at 0830 on October 17, 1988.
=M11088-0178-NLO2
i i . .. .
i
- 6) In the case of a basic corponent which contains a defect or fails to coeply the number and location of all such corponents in use at, supplied for or being supplied for one or more facilities or setivities
- subject to Part 21.
j To date 12 purchase orders for 63 pieces have been identified which l vere procured zrom 1983 to 1988 as Masoneflan parts, however, parts were not genuine. 24 of the 63 pieces were purchased CO and dedicated. 20
- pieces (CQ and non-Q) of the original 63 had been issued to work orders. The 6 CQ parts of these 20 cay be installed in basic 4
components.-
- 7) a. The corrective action planned or taken is:
a All suspect materini remaining in the varehousa has been pulled and j
is being controlled. Location of issued material is being identified for disposition or replacement if parts have not yet been replaced.
Notified Big Rock Point who is reviewing sample Vebtrol putchases
! crders (3) for suspect valve parts. Primarily all Big Rock Point parts are believed to be genuine Masonellan parts. Reviewing i
additional product lines distributed by Sample - Webtrol Inc. for applicability.
- b. The nare of the individual / organization responsible is:
John Buechler, Consumers Power is responsible for corrective action,
- c. The length of tiee required to complete action was or is estimated
- to be:
Issued caterial vill be dispositioned prior to start-up from our current refueling outage.
Remaining actions are estfeated to take approximately 90 days.
l
- 6) Any advice related to the defect of failure to cocply about the facility, activity, or basic cocponent that has been, is being, or will be Fiven to purchasers or licensees:
Sample - Webtrol is the authorized Masonellan distributor for 5 other plants: Big Rock Point, D C Cook, Fere1, Davis-Besse, and Perry.
l H11088-0178-NLO2 ,
1
. _ . - _ . , , , . . . . - ., m.. , . . . .. . . . . . _ . . - . . . _ _..,_-,c..
i /'[
' i ,,T o CB$la de , ' Pali sade s ~
l /
- From DJMelone, Palisades CONStTHERS e[
POWER-l Date. Novembe r 3,1988 - N COMPANY-i Subject PALISADES PLANT-- Internal i 10CFR21 MEETING RECARDING SUSPECT Correspondence i MASONEILAN VALVE PARTS PROCURED FROM l SAMPLE-WEBIROL CONTROLS, INC .
i CC KVBerryhP24-614A RD0ross, Palisades DJM88*061
'ERSJalsonV NRC E 8, JMBuechler, Palieades j DWJoos, Palisades CSKozup, Palisades j JClewis, Palisades. TJPalaisano, Palisades j REHcCaleb, Palisades At 1100 on October 21, 1988, a meeting was held with representatives of i Masonellan North American Operations, Sample-Webtrol Control, Inc, Consumers
! Power Company, and the NRC. This meetinS was held to discuss the 10CFR21
{ notification made by CPCo on October 18, 1988, regarding. suspect Masoneilan l valve part s procured from Sample-Webt rol Cont rol, Inc. The following were in i attendance:
N,, R C CPCo j J Cuillen, Office of Generic R E McCaleb, QA Director
- Information J H Buechler, Materials Management J J Fetrosino, Division of J R Johns, Operations Analyst Reactor Inspection D J Malone, Licensing Analyst -
and Safeguards T J Palmisano, System ragineering E R Swanson, Senior Resident Superintendent
[ Inspector D C Tu rn e r , Engineerink_Section i Supe rvisor l D Jones, General Office QA
!- D tiirsch, General Of fice QA j- Masoneilan Sample-Webt rol Cont rol s. Inc W T Allen, III, Quality Assurance R A Ray, Vice President A
Manager -W F Sample, President
! D Ellis, Technical Service Representative >
K Juncewicz, Midwest Sales. Manager R L Saraf, Nuclear Sales and l
Marketing Manager
.The purpose of this. meeting was to provide a forum for -all involved af filia-tions to presenteinfornation_regarding the procurement o t' -the' suspe_ct valve parts and ask questions'of other involved parties.
The issue regarding the suspect valve parts surfaced on.0ctober 14, 1988, when D Ellis , Masoneilan, _ identified -parts issued . for work on turbine bypass valve,.
[. CV-0511, not genuine Masoneilan replacement part's. CPCo personnel contacted 1
/
IC1188-0002A-PM01
. . . _ _. ; _,._;..-._.,_... _ . _ . , _ _ , .. _._ - ._. ..a _a _ __[
2 t he part s distributor, Sample-Webtrol Controls, Inc (S-W) regarding the s u s te c t parts. On Oc t o be r 17, 1988, S-W had confirmed that several CPCo purchase orders f or Masoneilan replacement part s had been filled with parts manuf actured by corporations other than Masoneilan. This issue was presented to Plant Hanagement at the Plant Corrective Action Review Board (CARB) meeting a t 0830 on Oc t obe r 17, 1988.
At 0930 on Oc tober 18, 1988, in a conference call between S-W and CPCo, S-W inf ormed CPCo t hat they had identified ten purchase orders between 1983 and 1988 where part s other than genuine Masoneilan part s had been supplied to the Palisades Plant when Masoneilan parts numbers had originally been specified.
Of these ten purchase + orders, two were identified as QC with the remaining eight NQ. S-W further identified that the part s were manuf actured by either CVC, Inc , or COR-Val, both of Houma , LA.
The f ollowing represents information, statement s, and questions provided by the representatives present.
CPCo
- 1. Since the Oct ober 18, 1988, conference call, two additional purchase orders were identified for a total of 12 (two CQ, ten NQ). CPCo did not ask f or certificates of aut henticity for the two CQ purchase orders. A total of 142 purchase orders for Kasoneilan parts have been placed through S-W since 1977 (24 Q, 40 OQ, and 78 NQ).
- 2. Through the 12 purchase orders, a total of 63 parts were not manufactured by Ma soneil an. Of the 63 parts,12 have been issued to Work Orders (six CQ parts).
- 3. Approximately 45 percent of all Masoneilan part s procured for use at Palisades.were through S-W. All orders through S-W were procured for stock with a delivery time of approximately seven weeks.
Hasoneilan
- 1. Masoneilan presently does not authorize other vendors to manufacture their parts. Between September 1975 and September 1980, CVS Inc was authorized to manuf acture Haroneilan parts.
- 2. All nuclear _ plant orders, Q or WQ, are filled through Masonellan's Massachusetts facilities.
I
- 3. There are ways in most cases to identify genuine Hasonellan parts. Both manuf acturing tolerance and stock raterial source may af f ect component o pe ra bi l i ty.
4 Hasoneilan does not authorize the use of non-Hasoneilan parts in their i
valves; nor do they authorize their distributors to sell anything other then genuine Hasoneilan parts. .
I Cll88-0002A- PH01
i 4~e 3
t 4
i Sampl e-Webt rol . Inc (S-W) 4
- 1. S-W is an suthorized Masoneilan distributor f or sia nuclear plants in the Midwest: Palisades, Big Rock Point, D C Cook, Te rmi II , Da vi s-Be s s e , a nd Perry.
- 2. No other nuclear plants in S-W territory, except for Big Rock Point , have i received Kasoneilan parts f rom S-W.
i j 3. Some of the 63 parts supplied to Palisades were procured by S-W f rom CVC, l Inc after September 1980.
l 4. A portion of S-W stock was bought as one lot (without all records) from i another distributorship.
) NRC l
- 1. J J Petrosino asked S-W how parts not manuf actured by Masoneilan got l
4 substituted. S-V responded thtt at a time, CVS, Inc was an authorized ~
3 manuf acturer that was utilized when lead-times were short. A S-W employee i who procured parts from CVS, Inc after 1980 has had employment te rminat ed l approximately one year ago.
i 2. J J Petrosino asked Masoneilan if part numbers were changed when manufac-turing specifications are changed. Masoneilan responded that each change
- i s evaluated, but not in all cases are. numbers changed.
i
- 3. J J Petrosino recommended Palisades verif y adequacy of all Hasonellan
!_ parts in stock.
( 4. J J Petrosino questioned whether other (37 in North America) authorized l- Hasoneilan distributors may be sul-stituting parts manuf actured by companies other than Masoneilan. Masoneilati acknowledged this practice in other
! industries, but were legally bounc' to a degree with respect to actions j t hey could take.
[
's> s.pW 1=
L l-l'
, ' I Cl l 88-0002 A-PH01.