{{#Wiki_filter:August 29, 2019
{{#Wiki_filter:August 29, 2019
  Mr. Bryan C. Hanson
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
President and CNO, Exelon Nuclear
4300 Winfield Road
4300 Winfield Road
Warrenville, IL 60555
Warrenville, IL 60555
  SUBJECT: QUAD CITIE
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2NOTIFICATION
S NUCLEAR POWER STATION, UNITS 1 AND 2
            OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST
-NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000254/201
            FOR INFORMATION 05000254/2019013; 05000265/2019013
9 0 13; 05000265/201
Dear Mr. Hanson:
9 0 13  Dear Mr. Hanson: On November 4, 201 9 the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire protection baseline inspection
On November 4, 2019 the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire
at your Quad Cities Nuclear Power
protection baseline inspection at your Quad Cities Nuclear Power Station, Units 1 and 2. This
Station, Units 1 and 2
inspection will be performed in accordance with Inspection Procedure (IP) 71111.05T, the
.  Th is inspection will be performed in accordance with Inspection Procedure
NRCs baseline fire protection IP.
(IP) 71111.05T, the NRC's baseline fire protection  
Changes were made to the IP 71111.05T which now requires the fire protection inspection to
IP. Changes were made to the IP 71111.05T which now requir es the fire protection inspection
review your actions to mitigate postulated events that could potentially cause loss of large areas
to review your actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires. This requirement was implemented
of power reactor facilities due to explosions or fires. This requirement was implemented by the
by the issuance of the Interim Compensatory Measures
issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b, and the
Order EA-02-026, Section B.5.b , and the subsequent requirements of Title 10 Code of Federal Regulations, Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements
subsequent requirements of Title 10 Code of Federal Regulations, Part 50.54(hh)(2),
. During t his inspection, the
which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b
B.5.b requirements review will be performed during the first onsite week of the inspection starting  
requirements review will be performed during the first onsite week of the inspection starting
on November 4, 2019. The schedule for the onsite inspection activity is as follows:  Information Gathering Visit
on November 4, 2019.
: November 4-5, 2019;  B.5.b Requirements: November 6-8, 2019; and  Fire Protection Inspection: November 1 8-22, 2019; and December 2-6, 201 9. The purpose of the information gathering visit is: (1) to obtain information and documentation needed to support the inspection; (2) to become familiar with the Braidwood Station
The schedule for the onsite inspection activity is as follows:
Fire Protection Programs, fire protection features, post
    *   Information Gathering Visit: November 4-5, 2019;
-fire safe shutdown capabilities, and plant layout; and (3) to arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.
    *   B.5.b Requirements: November 6-8, 2019; and
 
    *   Fire Protection Inspection: November 18-22, 2019; and
B. Hanson -2- Experience has shown that the baseline fire protection inspections are extremely resource intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection
                                    December 2-6, 2019.
impact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups.
The purpose of the information gathering visit is: (1) to obtain information and documentation
  The first group lists information necessary to aid the inspection team in choosing specific focus area
needed to support the inspection; (2) to become familiar with the Braidwood Station Fire
s for the inspection. It is requested that this information be
Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant
provided to the lead inspector via mail or electronically no later than
layout; and (3) to arrange administrative details, such as office space, availability of
October 18, 2019.  The second
knowledgeable office personnel and to ensure unescorted site access privileges.
group also list s information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and  
 
to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit  
B. Hanson                                       -2-
on November 4, 2019.   The third group of requested documents consists of
Experience has shown that the baseline fire protection inspections are extremely resource
those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week beginning November 1 8, 2019.   The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection.
intensive both for the NRC inspectors and the licensee staff. In order to minimize the
It is important that all of these documents
inspection impact on the site and to ensure a productive inspection for both organizations,
are up to date and complete in order to
we have enclosed a request for documents needed for the inspection. These documents
minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
have been divided into four groups.
  The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory contact for this inspection is Mr. Tom Petersen
    *  The first group lists information necessary to aid the inspection team in choosing
of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at  
        specific focus areas for the inspection. It is requested that this information be
630-829-9824 or via e-mail at Alan.Dahbur@nrc.gov
        provided to the lead inspector via mail or electronically no later than October 18, 2019.
This letter does not contain new or amended information collection requirements subject  
    *   The second group also lists information and areas for discussion necessary to aid the
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150
        inspection team in choosing specific fire protection focus areas for the inspection and
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.  
        to ensure that the inspection team is adequately prepared for the inspection. It is
B. Hanson -3- This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html
        requested this information be available during the information gathering visit on
and at the NRC Public Document Room in accordance with 10
        November 4, 2019.
CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
    *  The third group of requested documents consists of those items that the team will
  Sincerely, /RA/   Alan Dahbur, Senior Reactor Inspector
        review, or need access to, during the inspection. Please have this information available
Engineering Branch 3
        by the first day of the second onsite inspection week beginning November 18, 2019.
Division of Reactor Safety Docket Nos. 50
    *  The fourth group lists the information necessary to aid the inspection team in tracking
-254; 50-265 License Nos. NPF
        issues identified as a result of the inspection. It is requested that this information be
-29; NPF-30 Enclosure:
        provided to the lead inspector as the information is generated during the inspection.
Document Request for Fire Protection
        It is important that all of these documents are up to date and complete in order to
  Inspection
        minimize the number of additional documents requested during the preparation
  cc: Distribution via LISTSERV
        and/or the onsite portions of the inspection.
 
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory
B. Hanson -4- Letter to Bryan C. Hanson
contact for this inspection is Mr. Tom Petersen of your organization. If there are any questions
from Alan Dahbur
about the inspection or the material requested, please contact the lead inspector at 630-829-
dated August 29, 201 9. SUBJECT: QUAD CITIE
9824 or via e-mail at Alan.Dahbur@nrc.gov.
S NUCLEAR POWER STATION, UNITS 1 AND 2
This letter does not contain new or amended information collection requirements subject
-NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000254/201
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
9 0 13; 05000265/201
collection requirements were approved by the Office of Management and Budget, Control
9 0 13  DISTRIBUTION
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
: Douglas Dodson
respond to, a request for information or an information collection requirement unless the
RidsNrrDorlLpl3
requesting document displays a currently valid Office of Management and Budget Control
RidsNrrPMQuadCities Resour
Number.
ce RidsNrrDirsIrib Resource
 
Darrell Roberts
B. Hanson                                   -3-
John Giessner
This letter and its enclosure will be made available for public inspection and copying at
Jamnes Cameron
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
Allan Barker
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
DRPIII DRSIII                           ADAMS Accession Number: ML19241B336 Publicly Available
                                            Sincerely,
  Non-Publicly Available
                                            /RA/
  Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
                                            Alan Dahbur, Senior Reactor Inspector
  OFFICE RIII       NAME A.Dahbur:cl   DATE 08/29/19   OFFICIAL RECORD COPY
                                            Engineering Branch 3
 
                                            Division of Reactor Safety
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
Docket Nos. 50-254; 50-265
Enclosure Inspection Report:
License Nos. NPF-29; NPF-30
05000 254/20 1 901 3; 05000 265/201901 3  Onsite Inspection Dates:
Enclosure:
November 4-5, 201 9 (Information Gathering Visit
Document Request for Fire Protection
) November 6-8, 2019 (B.5.b Requirements
Inspection
) November 1 8-22, 201 9 (Fire Protection Inspection
cc: Distribution via LISTSERV
) December 2-6, 201 9 (Fire Protection Inspection
 
Inspection Procedures:
B. Hanson                                                                 -4-
71111.05T, "Fire Protection
Letter to Bryan C. Hanson from Alan Dahbur dated August 29, 2019.
(Triennial)"
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2NOTIFICATION
71152, "Identification
                    OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST
and Resolution of Problems"
                    FOR INFORMATION 05000254/2019013; 05000265/2019013
  Inspectors:
DISTRIBUTION:
Alan Dahbur , Lead Inspector 630-829-9824 Alan.Dahbur@nrc.gov
Douglas Dodson
  Atif Shaikh , Jasmine Gilliam, Senior Reactor Inspector Reactor Inspector
RidsNrrDorlLpl3
630-829-9824 630-829-9831 Atif.Shaikh@nrc.gov
RidsNrrPMQuadCities Resource
Jasmine.Gilliam@nrc.gov
RidsNrrDirsIrib Resource
  I. Information Requested Prior To the Information Gathering Visit
Darrell Roberts
  The following information is requested by October 18, 2019. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information should be sent to  
John Giessner
Alan Dahbur
Jamnes Cameron
(e-mail address
Allan Barker
Alan.Dahbur@nrc.gov). Electronic media is preferred. The preferred file format is a searchable
DRPIII
"pdf" file on a compact disk
DRSIII
(CD). The CD should be indexed and hyper
ADAMS Accession Number: ML19241B336
-linked to facilitate ease of use, if possible. Please provide three copies of each CD submitted (one for each inspector).
    Publicly Available                       Non-Publicly Available                       Sensitive                 Non-Sensitive
  1. The most risk
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
-significant fire areas as determined by
  OFFICE             RIII
probabilistic risk analyses , if available. Otherwise, the reactor plant's Individual Plant Examination for External Events
NAME               A.Dahbur:cl
for fire and
DATE               08/29/19
results of any post-Individual Plant Examination for External Events
                                                          OFFICIAL RECORD COPY
reviews for fire.
 
  2. A copy of the current version of the Fire Protection Program, fire hazards analysis, safe shutdown analysis
                DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
(SSA), Updated Safety Analysis Report
Inspection Report:               05000254/2019013; 05000265/2019013
, technical specifications
Onsite Inspection Dates:         November 4-5, 2019            (Information Gathering Visit)
, license (including the fire protection license condition), and technical requirements manual or equivalent for fire protection structures, systems, and compo
                                  November 6-8, 2019           (B.5.b Requirements)
nents.  3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which Title 10 of the Code of Federal Regulations
                                  November 18-22, 2019          (Fire Protection Inspection)
(CFR), Part 50, Appendix
                                  December 2-6, 2019            (Fire Protection Inspection)
R, Section III.G , requirements are satisfied under Section
Inspection Procedures:           71111.05T, Fire Protection (Triennial)
III.G.3), or where both safe shutdown trains can be affected.
                                  71152, Identification and Resolution of Problems
 
Inspectors:                       Alan Dahbur, Lead Inspector
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
                                  630-829-9824
2 4. Plant operating procedures which would be used and describe shutdown for a postulated fire (for both areas requiring alternative shutdown and areas which do not require alternative shutdown).  
                                  Alan.Dahbur@nrc.gov
Only those procedures with actions specific to shutdown in the event of a fire need be included.
                                  Atif Shaikh,                 Jasmine Gilliam,
  In addition, please include the procedure which directs operators to the applicable safe shutdown procedure
                                  Senior Reactor Inspector     Reactor Inspector
5. Analysis performed in support of plant evaluation regarding multiple spurious operation (MSO), which includes the following:
                                  630-829-9824                 630-829-9831
  a. List of identified multiple spurious fire
                                  Atif.Shaikh@nrc.gov           Jasmine.Gilliam@nrc.gov
-induced circuit failure configurations.
I.     Information Requested Prior To the Information Gathering Visit
  b. List of the generic and plant specific MSOs.
      The following information is requested by October 18, 2019. If you have any questions
  c. Results of expert panel process and associated review/evaluation of the generic and plant specific MSOs and existing SSA. d. Evaluations and corrective actions taken for resolution of MSO issues.
      regarding this request, please call the lead inspector as soon as possible. All
  II. Information Requested During the Information Gathering Visit (November 4, 201 9) The following information is requested to be provided to the inspection team during the onsite information gathering visit. Except for Item
      information should be sent to Alan Dahbur (e-mail address Alan.Dahbur@nrc.gov).
8, it is requested that the following information be
      Electronic media is preferred. The preferred file format is a searchable pdf file on a
provided on three sets of CDs
      compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of
(searchable, if possible
      use, if possible. Please provide three copies of each CD submitted (one for each
) with the B.5.b Mitigating Strategies information (Items 8.a through 8.
      inspector).
h) provided on  
      1.       The most risk-significant fire areas as determined by probabilistic risk analyses,
one separate CD
                if available. Otherwise, the reactor plants Individual Plant Examination for
In addition, one
                External Events for fire and results of any post-Individual Plant Examination
set of hard copy drawings are requested for Items
                for External Events reviews for fire.
4.a. through
      2.       A copy of the current version of the Fire Protection Program, fire hazards
4.d. 1. One set of hard
                analysis, safe shutdown analysis (SSA), Updated Safety Analysis Report,
-copy documents for facility layout drawings which identify plant
                technical specifications, license (including the fire protection license condition),
fire area delineation; areas protected by automatic fire suppression and detection;
                and technical requirements manual or equivalent for fire protection structures,
and locations of fire protection equipment.
                systems, and components.
  2. Licensing Information
      3.       A list of fire areas requiring alternative shutdown capability, (i.e., those areas for
a. All Nuclear Regulatory Commission
                which Title 10 of the Code of Federal Regulations (CFR), Part 50, Appendix R,
(NRC) Safety Evaluation Report s (SERs) applicable to fire protection (specifically including those SERs referenced by the
                Section III.G, requirements are satisfied under Section III.G.3), or where both
plant fire protection license condition) and all licensing correspondence referenced by the SERs
                safe shutdown trains can be affected.
b. All licensing correspondence associated with the comparison to Standard Review Plan (NUREG
                                                                                            Enclosure
-0800), Section
 
9.5.1 or equivalent for licensing purposes; c. Exemptions from  
            DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
10 CFR 50.48 and  
    4.     Plant operating procedures which would be used and describe shutdown for a
10 CFR Part 50, Appendix R, and associated licensing correspondence;
            postulated fire (for both areas requiring alternative shutdown and areas which do
  d. For pre-1979 plants, all licensing correspondence associated with those sections of 10 CFR Part 50, Appendix R, that are not applicable  
            not require alternative shutdown). Only those procedures with actions specific to
to the plant under  
            shutdown in the event of a fire need be included. In addition, please include the
10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with those fire protection features proposed or implemented by the licensee that have been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position APCSB 9.5-1 reflected in the NRC fire protection SERs issued before
            procedure which directs operators to the applicable safe shutdown procedure.
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
    5.     Analysis performed in support of plant evaluation regarding multiple spurious
3 February 19, 1981 , (10 CFR 50.48(b)(1)(i)); or those fire protection features , which were accepted by the NRC staff in comprehensive fire protection SERs issued before Appendix A to Branch Technical Position APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii));
            operation (MSO), which includes the following:
and  e. The Final Safety Analysis Report sections applicable to fire protection, FHA, and SSA in effect at the time of original licensing.
            a.     List of identified multiple spurious fire-induced circuit failure configurations.
  3. Fire Protection Program
            b.     List of the generic and plant specific MSOs.
a. A listing of changes made to the Fire Protection Program
            c.     Results of expert panel process and associated review/evaluation of the
since the last triennial fire protection inspection
                    generic and plant specific MSOs and existing SSA.
b. For pre-1979 plants, a listing of the protection
            d.     Evaluations and corrective actions taken for resolution of MSO issues.
methodologies identified  
II. Information Requested During the Information Gathering Visit (November 4, 2019)
under 10 CFR Part 50, Appendix
    The following information is requested to be provided to the inspection team during the
R, Section
    onsite information gathering visit. Except for Item 8, it is requested that the following
III.G , used to achieve compliance for selected fire zones/areas (to be determined during information gathering visit). That is, please specify whether 3
    information be provided on three sets of CDs (searchable, if possible) with the B.5.b
-hour rated fire barriers; (Section III.G.2.a), 20
    Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD.
-foot separation along with detection and suppression; (Section III.G.2.b), 1
    In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.
-hour rated fire barriers with detection  
    1.     One set of hard-copy documents for facility layout drawings which identify plant
and suppression; (Section III.G.2.c), or alternative shutdown capability;  
            fire area delineation; areas protected by automatic fire suppression and
(Section III.G.3) is used as a strategy for each selected fire zone/area;
            detection; and locations of fire protection equipment.
  c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe-shutdown evaluations);
    2.     Licensing Information:
  d. A list of applicable codes and standards related to the design of plant fire protection features. The list should include National Fire Protection Association code versions committed to (i.e., the National Fire Protection Association
            a.     All Nuclear Regulatory Commission (NRC) Safety Evaluation
Codes of Record); and e. List of plant deviations from code commitments
                    Reports (SERs) applicable to fire protection (specifically including those
and associated evaluations.
                    SERs referenced by the plant fire protection license condition) and all
  4. Facility Information:
                    licensing correspondence referenced by the SERs;
  a. Piping and instrumentation (flow) diagrams
            b.     All licensing correspondence associated with the comparison to Standard
showing the components used  
                    Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing
to achieve and maintain hot standby and cold shutdown for fires outside the control room , those components used for those areas requiring alternative shutdown capability, and systems relied upon for B.5.b mitigation strategies. These can be of the type that are used for training
                    purposes;
b. One-line schematic drawings of the electrical distribution system for  
            c.     Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and
4160 Volts alternating current (Vac) down to 480Vac; c. One-line schematic drawings of the electrical distribution sy
                    associated licensing correspondence;
stem for 250 Volts direct current (Vdc) and 125Vdc systems as applicable;
            d.     For pre-1979 plants, all licensing correspondence associated with
  d. Logic diagrams showing the components used to achieve and maintain hot standby and cold shutdown; and
                    those sections of 10 CFR Part 50, Appendix R, that are not applicable
  e. Safe shutdown cable routing database (requested electronically
                    to the plant under 10 CFR 50.48(b)(1). Specifically, the licensing
, such as on CD , if available
                    correspondence associated with those fire protection features proposed
).
                    or implemented by the licensee that have been accepted by the NRC staff
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
                    as satisfying the provisions of Appendix A to Branch Technical Position
4 5. Operations Response for Fire Protection
                    APCSB 9.5-1 reflected in the NRC fire protection SERs issued before
a. Pre-fire plans for selected fire zones/areas (to be determined during information gathering visit
                                                2
); b. Plant operating procedures which specify the initial operations response to a fire alarm or annunciator; and c. Procedure for calling out the fire brigade
 
and requesting off
  DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
-site assistance.
            February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection
  6. Corrective Actions
            features, which were accepted by the NRC staff in comprehensive fire
a. Listing of open and closed fire protection condition reports (i.e., problem identification forms and their resolution reports) since the date of the last triennial fire protection inspection; and  
            protection SERs issued before Appendix A to Branch Technical Position
  b. List of current fire impairments, including duration
            APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and
7. General Information
  e.       The Final Safety Analysis Report sections applicable to fire protection,
a. A listing of abbreviations and/or designators for
            FHA, and SSA in effect at the time of original licensing.
plant systems
3. Fire Protection Program:
b. Organization charts of site personnel down to the level of fire protection staff personnel; and
  a.       A listing of changes made to the Fire Protection Program since the last
   c. A phone list for onsite licensee personnel.
            triennial fire protection inspection;
  8. B.5.b Mitigating Strategies
  b.       For pre-1979 plants, a listing of the protection methodologies identified
a. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and
            under 10 CFR Part 50, Appendix R, Section III.G, used to achieve
10 CFR 50.54(hh)(2);
            compliance for selected fire zones/areas (to be determined during
  b. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be extensive damage mitigation guidelines, severe accident management guidelines, emergency operating procedures, abnormal operating procedures, etc.
            information gathering visit). That is, please specify whether 3-hour rated
c. A matrix that shows the correlation between the mitigation strategies identified
            fire barriers; (Section III.G.2.a), 20-foot separation along with detection and
in Nuclear Energy Institute 06
            suppression; (Section III.G.2.b), 1-hour rated fire barriers with detection
-12 and the site
            and suppression; (Section III.G.2.c), or alternative shutdown capability;
-specific procedures or guidelines that
            (Section III.G.3) is used as a strategy for each selected fire zone/area;
are used to implement each strategy;
  c.       A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to
   d. A listing of engineering evaluations/calculations that were used to verify engineering bases for
            safe-shutdown evaluations);
the mitigation strategies;
  d.       A list of applicable codes and standards related to the design of plant fire
  e. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.)
            protection features. The list should include National Fire Protection
required to be used to implement the mitigation strategies;
            Association code versions committed to (i.e., the National Fire Protection
 
            Association Codes of Record); and
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
  e.       List of plant deviations from code commitments and associated evaluations.
5 f. A list of B.5.b mitigating strategies, if any, which have implementing details that differ from
4. Facility Information:
that documented in the submittals and the SER; g. Copies of Memoranda of Understanding (e.g., with local fire departments)
  a.       Piping and instrumentation (flow) diagrams showing the components used
required to implement any mitigating strategies; and
            to achieve and maintain hot standby and cold shutdown for fires outside the
  h. A list of changes made to B.5.b mitigating strategies and associated procedures since the previous NRC inspection of B.5.b mitigating strategies
            control room, those components used for those areas requiring alternative
(November 6, 201 5). 9. Onsite Discussions
            shutdown capability, and systems relied upon for B.5.b mitigation strategies.
In addition, during the information gathering visit, it is requested that licensee staff be available for the following:
            These can be of the type that are used for training;
  a. Informal discussion on plant procedures operators would use in the event of fire or explosion (including B.5.b mitigation strategies) and under what conditions would the plant be shutdown using alternative shutdown methodology;
  b.       One-line schematic drawings of the electrical distribution system for
  b. Informal discussion on the plant's safe shutdown cable routing database and the plant-wide cable routing database, as applicable;
            4160 Volts alternating current (Vac) down to 480Vac;
and  c. A tour of alternative shutdown and risk
  c.       One-line schematic drawings of the electrical distribution system for
-significant fire areas
            250 Volts direct current (Vdc) and 125Vdc systems as applicable;
d. A discussion of scheduling of fire drills which may occur during the inspection so that the inspectors may be able to observe a fire drill, if possible. III. Information  
  d.       Logic diagrams showing the components used to achieve and maintain
Requested to be Available on first D ay of the Second Onsite Inspection W eek (November 18, 201 9) Th e following information is requested to be provided on the first day of inspection.  
            hot standby and cold shutdown; and
It is requested that th
  e.       Safe shutdown cable routing database (requested electronically, such as
is information be provided on three sets of CDs (searchable, if possible).
            on CD, if available).
  1. Program Procedures:
                                        3
  a. Procedures for:
 
  i. Administrative controls (such as allowed out of service times and compensatory measures) for fire protection systems and components
  DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
  ii. Control of transient combustibles
5. Operations Response for Fire Protection:
  iii. Control of hot work
  a.     Pre-fire plans for selected fire zones/areas (to be determined during
  b. List of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps, and suppression systems; and
          information gathering visit);
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
  b.     Plant operating procedures which specify the initial operations response
6 c. List of maintenance procedures which routinely verify
          to a fire alarm or annunciator; and
fuse breaker coordination in
  c.     Procedure for calling out the fire brigade and requesting off-site
accordance with the post
          assistance.
-fire safe shutdown coordination analysis. 2. Design and Equipment Information:
6. Corrective Actions:
  a. Coordination calculations and/or justifications that verify fuse/breaker coordination for selected fire zones/areas (to be determined during information gathering visit) that are fed off of the same electrical buses as components in the protected safe shutdown train;
  a.     Listing of open and closed fire protection condition reports (i.e., problem
  b. Copies of significant fire protection and post-fire safe shutdown related design change package descriptions (including their associated  
          identification forms and their resolution reports) since the date of the last
10 CFR 50.59 evaluations) and Generic Letter
          triennial fire protection inspection; and
86-10 (or adverse to safe shutdown) evaluations;
  b.     List of current fire impairments, including duration.
  c. Gaseous suppression system pre
7. General Information:
-operational testing, if applicable, for selected fire zones/areas (to be determined during information gathering visit); d. Hydraulic calculations and supporting test data which demonstrate operability for water suppression systems, if applicable, for selected fire zones/areas (to be determined during information gathering visit
  a.     A listing of abbreviations and/or designators for plant systems;
); e. Alternating current coordination calculations for 4160Vac down to 480Vac electrical systems;
  b.     Organization charts of site personnel down to the level of fire protection
and  f. List of all fire protection or Appendix R calculations.
          staff personnel; and
  3. Assess ment and Corrective Actions
   c.     A phone list for onsite licensee personnel.
The three most recent fire protection Quality Assurance
8. B.5.b Mitigating Strategies:
audits and/or fire
  a.     A list of all modifications to regulatory commitments made to meet the
protection self
          requirements of Section B.5.b of the ICM Order, EA-02-026, dated
-assessments.
          February 25, 2002, the subsequently imposed license conditions, and
  4. Any updates to information previously provided.
          10 CFR 50.54(hh)(2);
  IV Information Requested to Be Provided Throughout the Inspection
  b.     Copies of procedures/guidelines that were revised or generated to
  1. Copies of any corrective action documents generated as a result of the inspection team's questions or queries during this inspection.
          implement the mitigation strategies. These could be extensive damage
  2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).
          mitigation guidelines, severe accident management guidelines,
  If you have questions regarding the information requested, please contact the lead inspector.
          emergency operating procedures, abnormal operating procedures, etc.;
  c.     A matrix that shows the correlation between the mitigation strategies
          identified in Nuclear Energy Institute 06-12 and the site-specific
          procedures or guidelines that are used to implement each strategy;
   d.     A listing of engineering evaluations/calculations that were used to verify
          engineering bases for the mitigation strategies;
  e.     Copies of procedures used to inventory equipment (hoses, fittings,
          pumps, etc.) required to be used to implement the mitigation strategies;
                                      4
 
              DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
            f.       A list of B.5.b mitigating strategies, if any, which have implementing
                      details that differ from that documented in the submittals and the SER;
            g.       Copies of Memoranda of Understanding (e.g., with local fire departments)
                      required to implement any mitigating strategies; and
            h.       A list of changes made to B.5.b mitigating strategies and associated
                      procedures since the previous NRC inspection of B.5.b mitigating
                      strategies (November 6, 2015).
    9.     Onsite Discussions:
            In addition, during the information gathering visit, it is requested that licensee
            staff be available for the following:
            a.       Informal discussion on plant procedures operators would use in the event
                      of fire or explosion (including B.5.b mitigation strategies) and under what
                      conditions would the plant be shutdown using alternative shutdown
                      methodology;
            b.       Informal discussion on the plants safe shutdown cable routing database
                      and the plant-wide cable routing database, as applicable; and
            c.       A tour of alternative shutdown and risk-significant fire areas.
            d.       A discussion of scheduling of fire drills which may occur during the
                      inspection so that the inspectors may be able to observe a fire drill, if
                      possible.
III. Information Requested to be Available on first Day of the Second Onsite
    Inspection Week (November 18, 2019)
    The following information is requested to be provided on the first day of inspection. It is
    requested that this information be provided on three sets of CDs (searchable, if possible).
    1.     Program Procedures:
            a.       Procedures for:
                  i. Administrative controls (such as allowed out of service times and
                      compensatory measures) for fire protection systems and components
                  ii. Control of transient combustibles
                iii. Control of hot work
            b.       List of maintenance and surveillance testing procedures for alternative
                      shutdown capability and fire barriers, detectors, pumps, and suppression
                      systems; and
                                                  5
 
              DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
              c.     List of maintenance procedures which routinely verify fuse breaker
                      coordination in accordance with the post-fire safe shutdown coordination
                      analysis.
        2.   Design and Equipment Information:
              a.     Coordination calculations and/or justifications that verify fuse/breaker
                      coordination for selected fire zones/areas (to be determined during
                      information gathering visit) that are fed off of the same electrical buses
                      as components in the protected safe shutdown train;
              b.     Copies of significant fire protection and post-fire safe shutdown
                      related design change package descriptions (including their associated
                      10 CFR 50.59 evaluations) and Generic Letter 86-10 (or adverse to safe
                      shutdown) evaluations;
              c.     Gaseous suppression system pre-operational testing, if applicable, for
                      selected fire zones/areas (to be determined during information gathering
                      visit);
              d.     Hydraulic calculations and supporting test data which demonstrate
                      operability for water suppression systems, if applicable, for selected fire
                      zones/areas (to be determined during information gathering visit);
              e.     Alternating current coordination calculations for 4160Vac down to 480Vac
                      electrical systems; and
              f.     List of all fire protection or Appendix R calculations.
        3.   Assessment and Corrective Actions:
              The three most recent fire protection Quality Assurance audits and/or fire
              protection self-assessments.
        4.   Any updates to information previously provided.
IV     Information Requested to Be Provided Throughout the Inspection
        1.   Copies of any corrective action documents generated as a result of the
              inspection teams questions or queries during this inspection.
        2.   Copies of the list of questions submitted by the inspection team members and
              the status/resolution of the information requested (provided daily during the
              inspection to each inspection team member).
If you have questions regarding the information requested, please contact the lead inspector.
                                                  6
}}
}}

Revision as of 23:52, 7 October 2019

Ltr. 08/29/19 Quad Cities Nuclear Power Station, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000254/2019013; 05000265/2019013 (DRS-A.Dahbur)
ML19241B336
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/29/2019
From: Alan Dahbur
Division of Reactor Safety III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019013
Download: ML19241B336 (10)


See also: IR 05000254/2019013

Text

August 29, 2019

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2NOTIFICATION

OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST

FOR INFORMATION 05000254/2019013; 05000265/2019013

Dear Mr. Hanson:

On November 4, 2019 the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire

protection baseline inspection at your Quad Cities Nuclear Power Station, Units 1 and 2. This

inspection will be performed in accordance with Inspection Procedure (IP) 71111.05T, the

NRCs baseline fire protection IP.

Changes were made to the IP 71111.05T which now requires the fire protection inspection to

review your actions to mitigate postulated events that could potentially cause loss of large areas

of power reactor facilities due to explosions or fires. This requirement was implemented by the

issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b, and the

subsequent requirements of Title 10 Code of Federal Regulations, Part 50.54(hh)(2),

which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b

requirements review will be performed during the first onsite week of the inspection starting

on November 4, 2019.

The schedule for the onsite inspection activity is as follows:

  • Information Gathering Visit: November 4-5, 2019;
  • B.5.b Requirements: November 6-8, 2019; and
  • Fire Protection Inspection: November 18-22, 2019; and

December 2-6, 2019.

The purpose of the information gathering visit is: (1) to obtain information and documentation

needed to support the inspection; (2) to become familiar with the Braidwood Station Fire

Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant

layout; and (3) to arrange administrative details, such as office space, availability of

knowledgeable office personnel and to ensure unescorted site access privileges.

B. Hanson -2-

Experience has shown that the baseline fire protection inspections are extremely resource

intensive both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection for both organizations,

we have enclosed a request for documents needed for the inspection. These documents

have been divided into four groups.

  • The first group lists information necessary to aid the inspection team in choosing

specific focus areas for the inspection. It is requested that this information be

provided to the lead inspector via mail or electronically no later than October 18, 2019.

  • The second group also lists information and areas for discussion necessary to aid the

inspection team in choosing specific fire protection focus areas for the inspection and

to ensure that the inspection team is adequately prepared for the inspection. It is

requested this information be available during the information gathering visit on

November 4, 2019.

  • The third group of requested documents consists of those items that the team will

review, or need access to, during the inspection. Please have this information available

by the first day of the second onsite inspection week beginning November 18, 2019.

  • The fourth group lists the information necessary to aid the inspection team in tracking

issues identified as a result of the inspection. It is requested that this information be

provided to the lead inspector as the information is generated during the inspection.

It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation

and/or the onsite portions of the inspection.

The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory

contact for this inspection is Mr. Tom Petersen of your organization. If there are any questions

about the inspection or the material requested, please contact the lead inspector at 630-829-

9824 or via e-mail at Alan.Dahbur@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

B. Hanson -3-

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Alan Dahbur, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-254; 50-265

License Nos. NPF-29; NPF-30

Enclosure:

Document Request for Fire Protection

Inspection

cc: Distribution via LISTSERV

B. Hanson -4-

Letter to Bryan C. Hanson from Alan Dahbur dated August 29, 2019.

SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2NOTIFICATION

OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST

FOR INFORMATION 05000254/2019013; 05000265/2019013

DISTRIBUTION:

Douglas Dodson

RidsNrrDorlLpl3

RidsNrrPMQuadCities Resource

RidsNrrDirsIrib Resource

Darrell Roberts

John Giessner

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML19241B336

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII

NAME A.Dahbur:cl

DATE 08/29/19

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

Inspection Report: 05000254/2019013; 05000265/2019013

Onsite Inspection Dates: November 4-5, 2019 (Information Gathering Visit)

November 6-8, 2019 (B.5.b Requirements)

November 18-22, 2019 (Fire Protection Inspection)

December 2-6, 2019 (Fire Protection Inspection)

Inspection Procedures: 71111.05T, Fire Protection (Triennial)

71152, Identification and Resolution of Problems

Inspectors: Alan Dahbur, Lead Inspector

630-829-9824

Alan.Dahbur@nrc.gov

Atif Shaikh, Jasmine Gilliam,

Senior Reactor Inspector Reactor Inspector

630-829-9824 630-829-9831

Atif.Shaikh@nrc.gov Jasmine.Gilliam@nrc.gov

I. Information Requested Prior To the Information Gathering Visit

The following information is requested by October 18, 2019. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All

information should be sent to Alan Dahbur (e-mail address Alan.Dahbur@nrc.gov).

Electronic media is preferred. The preferred file format is a searchable pdf file on a

compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of

use, if possible. Please provide three copies of each CD submitted (one for each

inspector).

1. The most risk-significant fire areas as determined by probabilistic risk analyses,

if available. Otherwise, the reactor plants Individual Plant Examination for

External Events for fire and results of any post-Individual Plant Examination

for External Events reviews for fire.

2. A copy of the current version of the Fire Protection Program, fire hazards

analysis, safe shutdown analysis (SSA), Updated Safety Analysis Report,

technical specifications, license (including the fire protection license condition),

and technical requirements manual or equivalent for fire protection structures,

systems, and components.

3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for

which Title 10 of the Code of Federal Regulations (CFR), Part 50, Appendix R,

Section III.G, requirements are satisfied under Section III.G.3), or where both

safe shutdown trains can be affected.

Enclosure

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

4. Plant operating procedures which would be used and describe shutdown for a

postulated fire (for both areas requiring alternative shutdown and areas which do

not require alternative shutdown). Only those procedures with actions specific to

shutdown in the event of a fire need be included. In addition, please include the

procedure which directs operators to the applicable safe shutdown procedure.

5. Analysis performed in support of plant evaluation regarding multiple spurious

operation (MSO), which includes the following:

a. List of identified multiple spurious fire-induced circuit failure configurations.

b. List of the generic and plant specific MSOs.

c. Results of expert panel process and associated review/evaluation of the

generic and plant specific MSOs and existing SSA.

d. Evaluations and corrective actions taken for resolution of MSO issues.

II. Information Requested During the Information Gathering Visit (November 4, 2019)

The following information is requested to be provided to the inspection team during the

onsite information gathering visit. Except for Item 8, it is requested that the following

information be provided on three sets of CDs (searchable, if possible) with the B.5.b

Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD.

In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.

1. One set of hard-copy documents for facility layout drawings which identify plant

fire area delineation; areas protected by automatic fire suppression and

detection; and locations of fire protection equipment.

2. Licensing Information:

a. All Nuclear Regulatory Commission (NRC) Safety Evaluation

Reports (SERs) applicable to fire protection (specifically including those

SERs referenced by the plant fire protection license condition) and all

licensing correspondence referenced by the SERs;

b. All licensing correspondence associated with the comparison to Standard

Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing

purposes;

c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and

associated licensing correspondence;

d. For pre-1979 plants, all licensing correspondence associated with

those sections of 10 CFR Part 50, Appendix R, that are not applicable

to the plant under 10 CFR 50.48(b)(1). Specifically, the licensing

correspondence associated with those fire protection features proposed

or implemented by the licensee that have been accepted by the NRC staff

as satisfying the provisions of Appendix A to Branch Technical Position

APCSB 9.5-1 reflected in the NRC fire protection SERs issued before

2

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection

features, which were accepted by the NRC staff in comprehensive fire

protection SERs issued before Appendix A to Branch Technical Position

APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and

e. The Final Safety Analysis Report sections applicable to fire protection,

FHA, and SSA in effect at the time of original licensing.

3. Fire Protection Program:

a. A listing of changes made to the Fire Protection Program since the last

triennial fire protection inspection;

b. For pre-1979 plants, a listing of the protection methodologies identified

under 10 CFR Part 50, Appendix R, Section III.G, used to achieve

compliance for selected fire zones/areas (to be determined during

information gathering visit). That is, please specify whether 3-hour rated

fire barriers; (Section III.G.2.a), 20-foot separation along with detection and

suppression; (Section III.G.2.b), 1-hour rated fire barriers with detection

and suppression; (Section III.G.2.c), or alternative shutdown capability;

(Section III.G.3) is used as a strategy for each selected fire zone/area;

c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to

safe-shutdown evaluations);

d. A list of applicable codes and standards related to the design of plant fire

protection features. The list should include National Fire Protection

Association code versions committed to (i.e., the National Fire Protection

Association Codes of Record); and

e. List of plant deviations from code commitments and associated evaluations.

4. Facility Information:

a. Piping and instrumentation (flow) diagrams showing the components used

to achieve and maintain hot standby and cold shutdown for fires outside the

control room, those components used for those areas requiring alternative

shutdown capability, and systems relied upon for B.5.b mitigation strategies.

These can be of the type that are used for training;

b. One-line schematic drawings of the electrical distribution system for

4160 Volts alternating current (Vac) down to 480Vac;

c. One-line schematic drawings of the electrical distribution system for

250 Volts direct current (Vdc) and 125Vdc systems as applicable;

d. Logic diagrams showing the components used to achieve and maintain

hot standby and cold shutdown; and

e. Safe shutdown cable routing database (requested electronically, such as

on CD, if available).

3

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

5. Operations Response for Fire Protection:

a. Pre-fire plans for selected fire zones/areas (to be determined during

information gathering visit);

b. Plant operating procedures which specify the initial operations response

to a fire alarm or annunciator; and

c. Procedure for calling out the fire brigade and requesting off-site

assistance.

6. Corrective Actions:

a. Listing of open and closed fire protection condition reports (i.e., problem

identification forms and their resolution reports) since the date of the last

triennial fire protection inspection; and

b. List of current fire impairments, including duration.

7. General Information:

a. A listing of abbreviations and/or designators for plant systems;

b. Organization charts of site personnel down to the level of fire protection

staff personnel; and

c. A phone list for onsite licensee personnel.

8. B.5.b Mitigating Strategies:

a. A list of all modifications to regulatory commitments made to meet the

requirements of Section B.5.b of the ICM Order, EA-02-026, dated

February 25, 2002, the subsequently imposed license conditions, and

10 CFR 50.54(hh)(2);

b. Copies of procedures/guidelines that were revised or generated to

implement the mitigation strategies. These could be extensive damage

mitigation guidelines, severe accident management guidelines,

emergency operating procedures, abnormal operating procedures, etc.;

c. A matrix that shows the correlation between the mitigation strategies

identified in Nuclear Energy Institute 06-12 and the site-specific

procedures or guidelines that are used to implement each strategy;

d. A listing of engineering evaluations/calculations that were used to verify

engineering bases for the mitigation strategies;

e. Copies of procedures used to inventory equipment (hoses, fittings,

pumps, etc.) required to be used to implement the mitigation strategies;

4

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

f. A list of B.5.b mitigating strategies, if any, which have implementing

details that differ from that documented in the submittals and the SER;

g. Copies of Memoranda of Understanding (e.g., with local fire departments)

required to implement any mitigating strategies; and

h. A list of changes made to B.5.b mitigating strategies and associated

procedures since the previous NRC inspection of B.5.b mitigating

strategies (November 6, 2015).

9. Onsite Discussions:

In addition, during the information gathering visit, it is requested that licensee

staff be available for the following:

a. Informal discussion on plant procedures operators would use in the event

of fire or explosion (including B.5.b mitigation strategies) and under what

conditions would the plant be shutdown using alternative shutdown

methodology;

b. Informal discussion on the plants safe shutdown cable routing database

and the plant-wide cable routing database, as applicable; and

c. A tour of alternative shutdown and risk-significant fire areas.

d. A discussion of scheduling of fire drills which may occur during the

inspection so that the inspectors may be able to observe a fire drill, if

possible.

III. Information Requested to be Available on first Day of the Second Onsite

Inspection Week (November 18, 2019)

The following information is requested to be provided on the first day of inspection. It is

requested that this information be provided on three sets of CDs (searchable, if possible).

1. Program Procedures:

a. Procedures for:

i. Administrative controls (such as allowed out of service times and

compensatory measures) for fire protection systems and components

ii. Control of transient combustibles

iii. Control of hot work

b. List of maintenance and surveillance testing procedures for alternative

shutdown capability and fire barriers, detectors, pumps, and suppression

systems; and

5

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

c. List of maintenance procedures which routinely verify fuse breaker

coordination in accordance with the post-fire safe shutdown coordination

analysis.

2. Design and Equipment Information:

a. Coordination calculations and/or justifications that verify fuse/breaker

coordination for selected fire zones/areas (to be determined during

information gathering visit) that are fed off of the same electrical buses

as components in the protected safe shutdown train;

b. Copies of significant fire protection and post-fire safe shutdown

related design change package descriptions (including their associated

10 CFR 50.59 evaluations) and Generic Letter 86-10 (or adverse to safe

shutdown) evaluations;

c. Gaseous suppression system pre-operational testing, if applicable, for

selected fire zones/areas (to be determined during information gathering

visit);

d. Hydraulic calculations and supporting test data which demonstrate

operability for water suppression systems, if applicable, for selected fire

zones/areas (to be determined during information gathering visit);

e. Alternating current coordination calculations for 4160Vac down to 480Vac

electrical systems; and

f. List of all fire protection or Appendix R calculations.

3. Assessment and Corrective Actions:

The three most recent fire protection Quality Assurance audits and/or fire

protection self-assessments.

4. Any updates to information previously provided.

IV Information Requested to Be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during this inspection.

2. Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have questions regarding the information requested, please contact the lead inspector.