|
|
Line 3: |
Line 3: |
| | issue date = 04/24/2007 | | | issue date = 04/24/2007 |
| | title = E-MAIL (NPA-PD) Paper Abstract | | | title = E-MAIL (NPA-PD) Paper Abstract |
| | author name = Palla R L | | | author name = Palla R |
| | author affiliation = NRC/NRR/ADES | | | author affiliation = NRC/NRR/ADES |
| | addressee name = Greene N A | | | addressee name = Greene N |
| | addressee affiliation = NRC/NRR/ADES | | | addressee affiliation = NRC/NRR/ADES |
| | docket = 05000293 | | | docket = 05000293 |
Line 23: |
Line 23: |
| Paper Abstract I came across this, as well as some papers (actually just abstracts) by Jen Thorpe and by Samuel Miller. | | Paper Abstract I came across this, as well as some papers (actually just abstracts) by Jen Thorpe and by Samuel Miller. |
| 1ýc:vemp\uvv)uuuui. | | 1ýc:vemp\uvv)uuuui. |
| i ivw F'age 1 ql c:\temp\~VV}UUUU].i lvii-' I-'age 1 Mail Envelope Properties (462E5206.BI2 | | i ivw F'age 1 ql c:\temp\~VV}UUUU].i lvii-' I-'age 1 Mail Envelope Properties (462E5206.BI2 |
| : 18 : 10412) | | : 18 : 10412) |
|
| |
|
Line 35: |
Line 35: |
| Security: To Be Delivered: | | Security: To Be Delivered: |
| Status Tracking: Size 414 542552 No None Yes Standard No None No Standard Immediate Delivered | | Status Tracking: Size 414 542552 No None Yes Standard No None No Standard Immediate Delivered |
| & Opened | | & Opened 2.3 NUMERICAL STUDY OF THE INFLUENCES ON POLLUTANT TRANSPORT DUE TO MULTIPLE CONVERGENCE ZONES IN THE SEA BREEZES OF CAPE COD AND SOUTHEASTERN MASSACHUSETTS Nelson L. Seaman , Aijun Deng', Glenn K. Hunter', Bruce A. Egan 2 , and Annette M. Gibbs', 1The Pennsylvania State University Department of Meteorology, University Park, PA 2 Egan Environmental, Inc.Beverly, MA 1. INTRODUCTION In New England (NE) it is common for power plants and other large emission sources to be concentrated along the coastline, where prevailing mid-latitude westerly winds can advect effluents over the ocean. Of course, mesoscale circulations, especially the sea breeze, can dominate coastal winds when the large-scale flow is weak and land-ocean thermal contrast is large.However, irregular coastlines (bays and peninsulas) and topography lead to multiple thermally driven circulations that can interact and make it difficult to estimate exposure to harmful airborne species.Therefore, a numerical investigation has been conducted to better understand the influences on pollutant transport and diffusion due to interactions between local and mesoscale sea-breezes over Cape Cod and southeast MA. The study involves a mesoscale meteorological model (the PSU/NCAR MM5v3.4), a trajectory calculator (TRAJEC) and three plume dispersion models (CALPUFF, ISC3ST, and SCIPUFF). |
| | |
| ===2.3 NUMERICAL===
| |
| | |
| STUDY OF THE INFLUENCES ON POLLUTANT TRANSPORT DUE TO MULTIPLE CONVERGENCE ZONES IN THE SEA BREEZES OF CAPE COD AND SOUTHEASTERN MASSACHUSETTS Nelson L. Seaman , Aijun Deng', Glenn K. Hunter', Bruce A. Egan 2 , and Annette M. Gibbs', 1The Pennsylvania State University Department of Meteorology, University Park, PA 2 Egan Environmental, Inc.Beverly, MA 1. INTRODUCTION In New England (NE) it is common for power plants and other large emission sources to be concentrated along the coastline, where prevailing mid-latitude westerly winds can advect effluents over the ocean. Of course, mesoscale circulations, especially the sea breeze, can dominate coastal winds when the large-scale flow is weak and land-ocean thermal contrast is large.However, irregular coastlines (bays and peninsulas) and topography lead to multiple thermally driven circulations that can interact and make it difficult to estimate exposure to harmful airborne species.Therefore, a numerical investigation has been conducted to better understand the influences on pollutant transport and diffusion due to interactions between local and mesoscale sea-breezes over Cape Cod and southeast MA. The study involves a mesoscale meteorological model (the PSU/NCAR MM5v3.4), a trajectory calculator (TRAJEC) and three plume dispersion models (CALPUFF, ISC3ST, and SCIPUFF). | |
| Transport and diffusion of plumes from two power plants (elevated sources), a highway, and Otis AFB (surface sources) were calculated. | | Transport and diffusion of plumes from two power plants (elevated sources), a highway, and Otis AFB (surface sources) were calculated. |
| A companion paper in this volume describes the dispersion modeling results (Egan et al. 2002). This paper focuses on the meteorological modeling and trajectory calculations. | | A companion paper in this volume describes the dispersion modeling results (Egan et al. 2002). This paper focuses on the meteorological modeling and trajectory calculations. |
Revision as of 00:39, 13 July 2019
Letter Sequence Other |
---|
|
Results
Other: ML070440355, ML070440356, ML070440358, ML070440359, ML070440402, ML070440406, ML070680341, ML071020291, ML071020319, ML071020383, ML071020483, ML071020505, ML071030021, ML071030022, ML071030042, ML071030069, ML071030191, ML071030211, ML071030221, ML071200177, ML071200179, ML071200187, ML071200188, ML071200197, ML071240467, ML071240473, ML071280766, ML071280811, ML071280814, ML071290120, ML071290155, ML071290298, ML071290387, ML071560466, ML071560469, ML071560479, ML071570036, ML071570037, ML071570049, ML071570052, ML071570059, ML071570063, ML071570118, ML071570122, ML071570124, ML071580958, ML071580962, ML071580965, ML071580976, ML071580981... further results
|
MONTHYEARML0712901552006-05-0909 May 2006 (NPA-PD) Letter to Mary Lampert from the Commonwealth of Massachusetts Executive Office of Heath and Human Services, Department of Public Health, Regarding Child Heath Statistics Project stage: Other ML0704403592007-01-0404 January 2007 E-MAIL: (PD) FW: Pilgrim in the News Project stage: Other ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. Project stage: Other ML0704403952007-01-18018 January 2007 E-mail: (PD) Upcoming Pilgrim Environmental License Renewal Meeting Project stage: Meeting ML0705301852007-01-24024 January 2007 Draft Environmental Impact Statement Public Meeting, January 24, 2007, Evening Transcript-Corrected Project stage: Request ML0705301892007-01-24024 January 2007 Draft Environmental Impact Statement Public Meeting, January 24, 2007, Afternoon Transcript-Corrected Project stage: Request ML0706003092007-01-24024 January 2007 Attachments to Pilgrim Draft Environmental Impact Statement Afternoon Meeting Transcripts Project stage: Request ML0703305622007-01-24024 January 2007 Dseis Meeting Presentation, Preliminary Results of Environmental Review Pilgrim Nuclear Power Station Project stage: Request ML0704403552007-01-26026 January 2007 E-MAIL: (PA) Backgrounder.Pdf Project stage: Other ML0704403562007-01-26026 January 2007 E-MAIL: (PA) Scan001 (30).pdf Project stage: Other ML0704403582007-01-26026 January 2007 E-MAIL: (PA) Meteorology/Modeling Considerations for Various NRC Regulatory Licensing Programs Project stage: Other ML0704404022007-01-30030 January 2007 E-MAIL: (PD) Pilgrim SEIS Project stage: Other ML0704404062007-01-31031 January 2007 E-mail: (PD) Pilgrim Follow Up Information Project stage: Other ML0706803512007-02-0707 February 2007 E-MAIL: (PD) Pilgrim Meeting Handouts Project stage: Meeting ML0706803412007-02-15015 February 2007 E-MAIL: (PD) Pilgrim SEIS Project stage: Other ML0710300222007-02-28028 February 2007 E-MAIL: (PA) Response from Comment on NRC Documents Project stage: Other ML0707501272007-03-0101 March 2007 E-MAIL: (PD) Requested Document, Safety Evaluation Report with Open Items Related to the License Renewal of Pilgrim Nuclear Power Station Project stage: Approval ML0710300212007-03-0202 March 2007 E-MAIL: (PA) Pilgrim Nuclear Power Station Deis Comments Project stage: Other ML0710204792007-03-0202 March 2007 E-MAIL: (PA) Distribution of Final Document: Summary of Public Meetings Draft SEIS Pilgrim Project stage: Draft Approval ML0710301912007-03-0505 March 2007 E-MAIL: (PD) Request Hard copy-safety Evaluation Report from Mary Lampert To- phb1@nrc.gov 3/5/07 11:32am Project stage: Other ML0710302112007-03-0606 March 2007 E-MAIL: (PD) Week of 2/26 - Conference Calls from Perry Buckberg to Doug Ellis 3/6/07 9:18am Project stage: Other ML0710302212007-03-0707 March 2007 E-MAIL: (PD) Updated - Week of 2/26 Conference Call Record from Perry Buckberg to Doug Ellis 3/7/07 6:36am Project stage: Other ML0710205082007-03-0808 March 2007 E-MAIL: (PA) 1266 DC Mass Ag Comments on Draft EIS 2-28-07.pdf Project stage: Draft Other ML0710204902007-03-0808 March 2007 E-MAIL: (PA) 1266 DC Mass Ag Comments on Draft EIS 2-28-07.pdf Project stage: Draft Other ML0710204832007-03-12012 March 2007 E-mail: (PA) PNPS License Renewal - Cooling Tower Question Project stage: Other ML0710300422007-03-13013 March 2007 E-MAIL: (PD) Copy of LRA Amendment 15 Letter - from Edward Sanchez to phb1@nrc.gov 3/13/07 12:29pm Project stage: Other ML0710300482007-03-19019 March 2007 E-mail: (PD) Meeting Summary - March 14 & 15 2007 - from Perry Buckberg to Doug Ellis 3/19/07 7:05am Project stage: Meeting ML0710300582007-03-20020 March 2007 E-MAIL: (PD) Pilgrim Lr ACRS Subcommittee (Sc) Meeting on 4/4/07 - from Mairtri Banerjee to Lambros Lois; Perry Buckberg 3/20/07 1:20pm Project stage: Meeting ML0710300632007-03-21021 March 2007 E-MAIL: (PD) Fwd: Meeting Summary - March 14 & 15 2007 - from Perry Buckberg to Doug Ellis 3/21/07 1:04pm Project stage: Meeting ML0710205052007-03-21021 March 2007 E-MAIL: (PA) EPA Suspends 316(b) Rule Project stage: Other ML0710300692007-03-22022 March 2007 E-MAIL: (PD) Dry Well - Event Number: 43245 - from Mary Lampert to Perry Buckberg 3/22/07 9:08am Project stage: Other ML0710301762007-03-27027 March 2007 E-MAIL: (PD) Pilgrim Draft ACRS Presentation - from Bryan Ford to Perry Buckberg 3/27/07 5:25pm Project stage: Draft Other ML0710203452007-03-28028 March 2007 E-MAIL: (PD) Revised Draft ACRS Fluence Slides2 Project stage: Draft Other ML0710202962007-03-28028 March 2007 E-MAIL: (PD) Draft Program Detail Pilgrim ACRS Subcommitte Presentation.Ppt Project stage: Draft Other ML0710202912007-03-28028 March 2007 E-MAIL: (PD) Drywell Project stage: Other ML0710203432007-03-29029 March 2007 E-MAIL: (PD) Revised Draft ACRS Fluence Slides Project stage: Draft Other ML0710203162007-03-29029 March 2007 E-MAIL: (PD) Pdf Copy of Entergy Letter Providing Comments on Draft SER on Pilgrim LRA Project stage: Draft Other ML0710203192007-03-29029 March 2007 E-MAIL: (PD) Entergy-Preliminary Durability Performance Evaluation of Perry Project stage: Other ML0710203672007-03-30030 March 2007 E-MAIL: (PD) People Attending ACRS Sub Committee Meeting Project stage: Meeting ML0710203832007-03-30030 March 2007 E-MAIL: (PD) Final Presentation to Advisory Committee on Reactor Safguards Project stage: Other ML0712001772007-04-0202 April 2007 E-MAIL: (PD) Fw: Revised Drywell UT Table and Annulus Drain VT-2 Datasheets Project stage: Other ML0712001972007-04-0202 April 2007 E-MAIL: (PD) Annulus Drain Line Buckets Project stage: Other ML0712001882007-04-0303 April 2007 E-MAIL: (PD) Conference Call Record 4/2/2007 Project stage: Other ML0712001872007-04-12012 April 2007 E-MAIL: (PD) Conference Call Record 4/2/2007 Project stage: Other ML0712808142007-04-13013 April 2007 E-MAIL: (NPA-PD) Entergy Efh Comment References Doc - Pilgrim Project stage: Other ML0712001792007-04-18018 April 2007 E-MAIL: (PD) Copy of PNPS LRA Annual Update Letter Project stage: Other ML0712901202007-04-19019 April 2007 E-mail: (NPA-PD) Entergy Efh Comment References2 - Pilgrim Project stage: Other ML0712808112007-04-20020 April 2007 E-MAIL: (NPA-PD) Entergy Efh Comment References - Pilgrim Project stage: Other ML0712902982007-04-24024 April 2007 E-MAIL (NPA-PD) Paper Abstract Project stage: Other ML0712903872007-04-25025 April 2007 E-mail (NPA-PD) Additional Info/References: Sea Breeze Journal Article Project stage: Other 2007-03-21
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
Robert Palla -Paper Abstract Page From: Robert Palla To: Natasha Greene Date: 04/24/2007 2:52:54 PM
Subject:
Paper Abstract I came across this, as well as some papers (actually just abstracts) by Jen Thorpe and by Samuel Miller.
1ýc:vemp\uvv)uuuui.
i ivw F'age 1 ql c:\temp\~VV}UUUU].i lvii-' I-'age 1 Mail Envelope Properties (462E5206.BI2
- 18 : 10412)
Subject:
Creation Date From: Created By: Paper Abstract 04/24/2007 2:52:54 PM Robert Palla RLP3 @nrc.,oov Recipients nrc.gov OWGWPO02.HQGWDO01 PM NAG (Natasha Greene)PM Post Office OWGWPO02.HQGWDO01 Action Delivered Opened Date & Time 04/24/2007 2:53:00 04/24/2007 2:59:04 Delivered Route 04/24/2007 2:53:00 PM Date & Time 04/24/2007 2:52:54 PM 04/24/2007 2:50:01 PM nrc.gov Files MESSAGE 39276.pdf Options Auto Delete: Expiration Date: Notify Recipients:
Priority: ReplyRequested:
Return Notification:
Concealed
Subject:
Security: To Be Delivered:
Status Tracking: Size 414 542552 No None Yes Standard No None No Standard Immediate Delivered
& Opened 2.3 NUMERICAL STUDY OF THE INFLUENCES ON POLLUTANT TRANSPORT DUE TO MULTIPLE CONVERGENCE ZONES IN THE SEA BREEZES OF CAPE COD AND SOUTHEASTERN MASSACHUSETTS Nelson L. Seaman , Aijun Deng', Glenn K. Hunter', Bruce A. Egan 2 , and Annette M. Gibbs', 1The Pennsylvania State University Department of Meteorology, University Park, PA 2 Egan Environmental, Inc.Beverly, MA 1. INTRODUCTION In New England (NE) it is common for power plants and other large emission sources to be concentrated along the coastline, where prevailing mid-latitude westerly winds can advect effluents over the ocean. Of course, mesoscale circulations, especially the sea breeze, can dominate coastal winds when the large-scale flow is weak and land-ocean thermal contrast is large.However, irregular coastlines (bays and peninsulas) and topography lead to multiple thermally driven circulations that can interact and make it difficult to estimate exposure to harmful airborne species.Therefore, a numerical investigation has been conducted to better understand the influences on pollutant transport and diffusion due to interactions between local and mesoscale sea-breezes over Cape Cod and southeast MA. The study involves a mesoscale meteorological model (the PSU/NCAR MM5v3.4), a trajectory calculator (TRAJEC) and three plume dispersion models (CALPUFF, ISC3ST, and SCIPUFF).
Transport and diffusion of plumes from two power plants (elevated sources), a highway, and Otis AFB (surface sources) were calculated.
A companion paper in this volume describes the dispersion modeling results (Egan et al. 2002). This paper focuses on the meteorological modeling and trajectory calculations.
- 2. MODEL DESCRIPTION, METHODOLOGY AND CASE DESCRIPTION The MM5v3.3 is a 3-D non-hydrostatic full-physics meteorological model with a terrain-following vertical coordinate (Grell et al. 1994). For this study, the model was configured with the Dudhia radiation and explicit moisture schemes, and a 1.5-order TKE turbulence scheme. Four nested domains were used with meshes of 36, 12, 4, and 1.33 km (Figure 1). All domains had 50 layers (30 below 1560 m), with the first level at -12 m AGL. The 4-km grid over southern NE had 151 X 151 points and the 1.33-km grid over Cape Cod had 115 X 115 points. The Kain-Fritsch deep convection scheme was used, but only on the 36- and 12-km domains. Four-dimensional data assimilation (FDDA)was applied on the 36- and 12-km domains via analysis Corresponding author: N.L. Seaman, Penn State Univ., Dept. of Meteorology, University Park, PA, 16802.Ph.: 814-863-1583, Email: seaman@ems.psu.edu nudging to reduce large-scale errors that could affect the local sea-breeze development.
NOAA EDAS analyses were used for the model's initial and boundary conditions and for FDDA. Three 48-h cases with weak synoptic-scale forcing were chosen from the summer of 2000: 1-2 July, 5-6 July, and 21-22 August. All three were post cold-frontal cases with weakening large-scale winds and a large land-sea thermal contrast that led to a sea breeze on one or both days of the episodes.3. RESULTS Here, we concentrate on results on the 1.33-km grid at 1800 UTC, 1 July. Manual analysis shows a thermal low over the interior of MA with a converging regional sea-breeze front (Fig. 2). The MM5 reproduces this front, plus several convergence zones due to local sea breezes over Cape Cod (Fig. 3). Figure 4 shows 6-h trajectories initiated from four emissions sources and ending at this same time. The trajectories show strong influences due- to both the regional and local sea breezes. Table 1 gives a summary of statistical results for all three cases in three layers of the atmosphere.
- 4.
SUMMARY
The MM5 produces realistic mesoscale structures on a 1.33 km grid, in terms of both the regional sea breeze and statistical agreement with regional data. The fine-grid model also produces local sea breezes over Cape Cod that cannot be resolved by standard observations.
- 5. ACKNOWLDGEMENTS Support for this study was provided by MA Dept.of Public Health through Contract No. RFR File No. 1J2.6. REFERENCES Egan, B.A., N. Seaman, R. Yamartino, and J. Purdum, 2002: Modeling pollutant dispersion from elevated and ground level sources affected by sea-breeze circulations produced by Cape Cod and its sur-roundings.
AMS 12th Joint Conf. on the Appl. Of Air Poll. Meteor. with A&WMA. Norfolk, VA, 20-24 May, 2 pp.Grell, G.A., J. Dudhia and D.R. Stauffer, 1994: A description of the fifth-generation Penn State/NCAR Mesoscale Model (MM5). NCAR Technical Note NCARITN-398+STR, 121 pp.
S1Gl -0.90 0ARB Uk /.. 2000-09-0119,59.55 2N10-07-0I.0I
.1.011E 5900T,-Figure 1. Location of 36, 12, 4 and 1.33-km nested domains for the MM5 configuration over Cape Cod.CAPECODI -DOMAIN 4 (I,33KM)Figure 3. MM5 surface-layer wind (ms-') on the 1.33-km domain in Case 1 valid at 1800 UTC, 1 July 2000 (+18 h). Full barb is 10 ms>'. Contour interval is 2 ms-1'.Heavy dashed line with wedges represents sea-breeze front. Dashed lines indicate convergence zones.CAPECOD 00.lO. 1.33k0 12-18h'Tr-j-.t -. r. _I ....d .t 12.0 ho...Term-hated
- t 1.0 hu.r-Figure 2 Manual analysis of sea-level pressure (mb)over the area of the 1.33-km MM5 domain for Case 1 at 1800 UTC, 1 July 2000. Isobar interval is 1 mb.Table 1. Averaged MM5 statistics for three cases of the Cape Cod sea breeze. MidTrop is 1000-5000 m, PBL is 45-1000 m, SfcLayer is 12 m AGL.Variable RMS MnAbs Mean % Within Layer Err Err Err Criteria Speed (ms-') Cr=2.0 ms-_MidTrop 2.36 2.03 +0.42 60.3 PBL 2.78 2.34 +0.88 49.7 SfcLayer 1.55 1.30 -0.03 78.9 Direct'n (deg) Cr=20.0deq MidTrop 18.8 16.7 -4.3 80.0 PBL 40.9 31.1 -6.7 52.9 SfcLayer 54.8 41.8 -5.7 41.3 Temp. (C) Cr=2.0 (C)MidTrop 0.99 0.82 +0.14 93.4 PBL 1.21 1.00 -0.51 88.2 SfcLayer 2.41 1.97 +0.16 61.2 Mix.Rat.(q/kq)
Cr=l (q/kq)MidTrop 0.97 0.80 -0.13 63.4 PBL 1.38 1.16 -0.25 55.2 SfcLayer 2.46 2.46 +0.25 33.3 SLvlPrs (mb) Cr=2.5 mb 0.69 0.62 +0.39 100.0 Figure 4. Six-hour TRAJEC forward trajectories based on MM5-simulated winds in Case 1. Release time is 1200 UTC, 1 July 2000 (+12 -18 h). Parcel 1 is Brayton Point plant. Parcel 2 is Canal plant. Parcel 3 is middle of highway segment. Parcel 4 is Otis AFB. Tick marks shown on trajectories give positions at 1-h intervals, or until the parcels exit the domain.