| issue date = 10/09/1993
| issue date = 10/09/1993
| title = Special Rept 2-SR-93-003:on 931002,thirty Day Period for Returning loose-part Detection Sys Channel 8 to Operable Status Exceeded.Subj Channel Scheduled to Be Reworked & Returned to Svc During Next Outage
| title = Special Rept 2-SR-93-003:on 931002,thirty Day Period for Returning loose-part Detection Sys Channel 8 to Operable Status Exceeded.Subj Channel Scheduled to Be Reworked & Returned to Svc During Next Outage
| author name = LEVINE J M
| author name = Levine J
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  

Revision as of 18:16, 18 June 2019

Special Rept 2-SR-93-003:on 931002,thirty Day Period for Returning loose-part Detection Sys Channel 8 to Operable Status Exceeded.Subj Channel Scheduled to Be Reworked & Returned to Svc During Next Outage
ML17310A700
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/09/1993
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
192-00865-JML-B, 192-865-JML-B, 2-SR-93-003, 2-SR-93-3, NUDOCS 9310200032
Download: ML17310A700 (8)


Text

ACCELERATED DOCUMENT DISTRIBUTION SYSTEM REGULA'+I INFORMATION DISTRZBUTIOI/YSTEM (RIDE)ACCESSION NBR:9310200032 DOC.DATE: 93/10/09 NOTARIZED:

NO , DOCKET¹FACIL!STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.

Arizona Public Service Co.(formerly Arizona Nuclear Power REC I P.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special Rept 2-SR-93-003:on 931002,thirty day period for returning loose-part detection sys channel 8 to operable status exceeded.Subj channel scheduled to be reworked&returned to svc during next outage.DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR Q ENCL J SIZE: 3 TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.D A NOTES:Standardized plant.05000529 RECIPIENT ID CODE/NAME PDV LA HOLIANF B INTERNAL: ACRS AEOD/DSP/TPAB NRR/DE/EELB

.NRR/DORS/OEAB NRR/DRCH/HICB NRR/DRIL/RPEB N SA PLB REG FIL 02 FILE 01 COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PDV PD TRAN,L AEOD/DOA AEOD/ROAB/DSP NRR/DE/EMEB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRSS/PRPB NRR/DSSA/SRXB RES/DSIR/EIB COPIES LTTR ENCL 1 1 1 1 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 EXTERNAL: EG&G BRYCEFJ.H NRC PDR NSIC POOREFW.2 2 1 1 1 1 L ST LOBBY WARD NSIC MURPHYFG.A NUDOCS FULL TXT 1 1 1 1 1 1 Y,OTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP US TO REDUCE WASTE!COYTACT THE DOCUMENT COYTROL DESK, ROOhh I'1-37 (EXT.50".2065)TO ELIMINATE YOUR YAME FI<Ohh DIS1'I;IDUTION LISTS FOR DOCUhIEblTS YOU DOY'T YEED!D TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 31 l l JAMES M.LEVINE VICE PRESIDENT NUCLEAR PADDUCTIDII Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX.ARIZONA 85072-2034 1 92-00855-JM4'BAG/P MM October 9, 1993 U.S.Nuclear Regulatory Commission-ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 50-529 (Ucense No.NPF-51)Special Report 2-SR-93-003 File: 93-020-404 Attached please find Special Report 2-SR-93-003 prepared and submitted pursuant to Technical Specification 3.3.3.7 ACTION (a)and Technical Specification 6.9.2.This report discusses the inoperability of one (1)Loose-Part Detection System channel for more than thirty (30)days.If you have any questions, please contact Burt Grabo at (602)393-6492.Sincerely,/JMUBAG/PMM/pm Attachment cc:, W.F.Conway (all w/attachment)

B.H.Faulkenberry J.A.Sloan 1800 nt=" 93i020003-05000529 2 q31009 PDR ADOCK pDR S

~~PALO VERDE NUCLEAR GENERATING STATION UNIT 2 Loose-Part Detection System License No.NPF-51 Docket No.50-529 Special Report 2R-93-003 Initial Conditions:

This Special Report is being submitted pursuant to Technical Specification Limiting Condition for Operation (TS LCO)3.3.3.7 ACTION (a)and TS 6.9.2 to report the inoperability of one (1)Loose-Part Detection System channel for more than thirty (30)days.The remaining seven (7)channels continue to function properly.TS LCO 3.3.3.7 is applicable in Mode 1 (POWER OPERATION) and Mode 2 (STARTUP).

The thirty (30)day period for returning the channel to an operable status was exceeded at approximately 1030 MST on October 2, 1993.S stem Information:

The Loose-Part Detection System is designed to detect the presence of loose parts within the Reactor Coolant System (RCS).The Palo Verde Unit 2 Loose-Part Detection System consists of eight (8)channels.Each channel consists of a piezoelectric accelerometer and associated amplification, indication, and recording circuitry.

The eight (8)sensors are positioned in the following locations:

two (2)mounted on the Reactor Vessel upper head (Channels 1 and 2), two (2)mounted on the Reactor Vessel lower incore nozzle (Channels 3 and 4), and one (1)on each of the two (2)Steam Generators'nlet and outlet nozzles (Channels 5, 6, 7, and 8).The accelerometer detects loose parts using acoustic signals which are generated when loose parts impact an RCS component or structure.

Signals in excess of the alarm setpoint will result in an alarm condition.

The alarms are the"latch on" type (i.e., the alarm will remain on when the system returns to normal and will not clear until the alarm is manually reset).There is one (1)alarm indicator in the Control Room for the eight (8)channels.Actions Taken: During a routine monitoring of the audio signal of the Loose-Part Detection System, the system engineer discovered that Channel 8 was inaudible.

The other channels appeared to be functioning normally.During initial troubleshooting, the cables to Channels 7 and 8 were transposed and the problem switched to Channel 7.The problem with Channel 8 was determined to be originating from within Containment.

At approximately 1030 MST on September 2, 1993, the Loose-Part Detection System was declared inoperable.

Subsequent troubleshooting determined that the probable failure is either a hardline cable-related problem or a bad connection at the accelerometer since there is no audible sound on the channel.

t Special Report 2-SR-93-003 Page 2 Cause of the Malfunction:

The failure of Channel 8 is apparently due to vibration (i.e., the vibration caused the hardline cable-related problem or the bad connection at the accelerometer).

An equipment root cause of failure analysis cannot be performed to verify or to rectify the Loose-Part Detection System channel problem due to industrial (i.e., high temperatures) and radiation safety concerns.A decision was made by PVNGS management to initiate compensatory actions (i.e., daily aural checks), enter the Technical Specification ACTION statement (i.e., prepare and submit a Special Report), and to repair the channel during the next outage.Plans for Restorin the Channel to OPERABLE Status: The inoperable Loose-Part Detection System channel is scheduled to be reworked and returned to service during the next outage.Channel 8 is incapable of being used to monitor for loose parts since the signal is inaudible.

The remaining seven (7)channels continue to function properly at this time.During the period of inoperability, the STAs and Operations personnel will perform twice daily aural checks on Channels 1 through 8 (i.e., during dayshift and nightshift).