ML17313B061

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With
ML17313B061
Person / Time
Site: Palo Verde  
Issue date: 07/31/1999
From: Fulton J, Ide W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00552-WEI-J, NUDOCS 9908170288
Download: ML17313B061 (9)


Text

CATEGORY REGULAT RY INFORMATION DXSTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:990 FACIL:STN-50-528

, '. '<<5TN-'50-529 STN-50-530 AUTH.NAME FULTON,'J ~ DE IDE,W.E.

RECXP.NAME 8170288 DOC.DATE: &~~1-NOTARIZED: NO DOCKET Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 Palo Verde Nuclear Station-, Unit 2, Arizona Publi 05000529 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTHOR AFFILIATION Arizona Public Service Co.

(formerly Arizona Nuclear Power Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIPIENT AFFILIATXON

SUBJECT:

Monthl ati epts for July 1999 for.PVNGS,Units 1,2 ith 990810 ltr.

D1STRIEUTION CODE:

IE24D COPIES RECEIVED:LTR 3 ENCL I

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: STANDARDIZED PLANT Standardized plant.

Standardized plant.

05000528 05000529 05000530 E

RECIPIENT ID CODE/NAME FIELDS,M INTERNAL: ACRS OC/DBA/PAD RGN4 EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT XD CODE/NAME FILE CENTER 0

E NOAC COPIES LTTR ENCL 1

1 1

1 1

1 D

M E

N NOTE TO ALL "RZDS" RECIPZENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

4~/

t 1

'1

~

William E. Ide Vice President Nudear Production Tel. 623-393-6116 Fax 623-393-6077 e-mail WEleapsc.corn Mail Station 7602 PO Box 52034 Phoenix, Arizona 65072-2034 035-00552-WEI/JDF August 10, 1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for JULY 1999 Enclosed are the Monthly Operating Reports for July 1999, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

Ifyou have any questions, please contact Judy Fulton at (602) 250-3549.

3 7'] t".I Sincerely, WEI/JDF/cj

Enclosures:

JULY 1999 Monthly Operating Reports I

pc~

cc:

E. W. Merschoff P. H. Harrell INPO Records Center UtilityData Institute 9908i70288 9'P073i PDR ADOCK 05000528, R

PDR (all w/enclosures)

\\

I

'k

l t

NRC MONTHLYOPERATING DATAREPORT DOCKET NQ.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-528 PVNGS-1 8/9/99 J. D. Fulton 602 250-3549 Reporting Period:

July 1999 1.

Design Electrical Rating (Net MWe):

1265 2.

MaximumDependabie Capacity(NetMWe):

1243

,Unit 1 Generating Statistics, 3.

Hours Reactor was Critical 4.

Hours Generator was On-Line, 5.

Unit Reserve Shutdown Hours This Month 744.0 744.0 0.0 Yr. to Date 5,035.8 5,028.1 0.0 Cumulative 86,905.0 85,658.7 0.0 6.

Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS 924,337 6,273,302 102,051,583 No.

Outage Method of Duration Shutting Down Date Type" Hours Reason2 ReactoR Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of July 1999.

1F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

h I~

F41, fly..

I

NRC MONTHLYOPERATING DATAREPORT DOCKET NOz.'.

UNITNAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-529 PVNGS-2 8/9/99 J. D. Fulton 602 250-3549 Reporting Period:

July 1999 1.

Design Electrical Rating (Net MWe):

1265 2.

Maximum Dependable Capacity(Net MWe):

1243 Unit 2 Generating Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS This Month 744.0 744.0 0.0 930,173 Yr. to Date 4,221.6 4,185.7 0.0 5,188,298 Cumulative 86,407.3 85,178.5 0.0 102,702,683 No.

Outage Method of Duration Shutting Down Date Type" Hours Reason Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of July 1999.

~ F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain) l t

NRC MONTHLYOPERATING DATAREPORT DOCKET NQ'.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-530 PVNGS-3 8/9/99 J. D. Fulton 602 250-3549 Reporting Period:

July 1999 1.

Design Electrical Rating (Net MWe):

1269 2.

MaximumDependable Capacity(NetMWe):

1247 Unit 3 Generating Statistics 3.

Hours Reactor was Critical 4.

Hours Generator was On-Line 5.

Unit Reserve Shutdown Hours 6.

Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS This Month 744.0 744.0 0.0 925,321 Yr. to Date 5,088.0 5,088.0 0.0 6,352,424 Cumulative 82,283.6 81,423.7 0.0 98,706,301 Outage Duration No.

Date Types'ours Reason2 Method of Shutting Down Reactor>

Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of July 1999.

"F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain) g'" i ~

~'t 4

1 i~

r.

1