ML17313B061

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr
ML17313B061
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/31/1999
From: Fulton J, Ide W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00552-WEI-J, NUDOCS 9908170288
Download: ML17313B061 (9)


Text

CATEGORY REGULAT RY INFORMATION DXSTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:990 8170288 DOC.DATE: &~~1- NOTARIZED: NO Verde Nuclear Station, Unit 1, Arizona Publi DOCKET

'. '<<5TN-'50-529 Palo FACIL:STN-50-528 Palo Verde Nuclear Station-, Unit 2, Arizona Publi 05000528 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,'J ~ DE Arizona Public Service Co. (formerly Arizona Nuclear Power IDE,W.E. Arizona Public Service Co. (formerly Arizona Nuclear Power RECXP.NAME RECIPIENT AFFILIATXON

SUBJECT:

Monthl ati epts for July 1999 for .PVNGS,Units 1,2 &

ith 990810 ltr.

D1STRIEUTION CODE: IE24D COPIES RECEIVED:LTR 3 ENCL I SIZE:

TITLE: Monthly Operating Report (per Tech Specs) E NOTES: STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL FIELDS,M 1 1 INTERNAL: ACRS 1 1 FILE CENTER 0 1 1 OC/DBA/PAD 1 1 E 1 1 RGN4 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 D NRC PDR 1 1 M

E N

NOTE TO ALL "RZDS" RECIPZENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

1 4~/ t

'1

~

William E. Ide Tel. 623-393-6116 Mail Station 7602 Vice President Fax 623-393-6077 PO Box 52034 Nud ear Production e-mail WEleapsc.corn Phoenix, Arizona 65072-2034 035-00552-WEI/JDF August 10, 1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for JULY 1999 Enclosed are the Monthly Operating Reports for July 1999, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, 3 7'] t".I WEI/JDF/cj I

Enclosures:

JULY 1999 Monthly Operating Reports pc~

cc: E. W. Merschoff (all w/enclosures)

P. H. Harrell INPO Records Center Utility Data Institute 9908i70288 9'P073i PDR ADOCK 05000528, R PDR

\

I

'k

l NRC MONTHLYOPERATING DATA REPORT t

DOCKET NQ.: 50-528 UNIT NAME: PVNGS-1 DATE: 8/9/99 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: July 1999

1. Design Electrical Rating (Net MWe): 1265
2. MaximumDependabie Capacity(NetMWe): 1243

,Unit 1 Generating Statistics, This Month Yr. to Date Cumulative

3. Hours Reactor was Critical 744.0 5,035.8 86,905.0
4. Hours Generator was On-Line, 744.0 5,028.1 85,658.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 924,337 6,273,302 102,051,583 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason2 ReactoR to Prevent Occurrence No reactor shutdowns occurred during the month of July 1999.

1F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

h I~

F41,'

fly..

I

NRC MONTHLYOPERATING DATA REPORT DOCKET NOz.'. 50-529 UNIT NAME: PVNGS-2 DATE: 8/9/99 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: July 1999

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity(Net MWe): 1243 Unit 2 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 4,221.6 86,407.3 Hours Generator was On-Line 744.0 4,185.7 85,178.5 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 930,173 5,188,298 102,702,683 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of July 1999.

~

F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

l NRC MONTHLYOPERATING DATA REPORT t

DOCKET NQ'.: 50-530 UNIT NAME: PVNGS-3 DATE: 8/9/99 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: July 1999

1. Design Electrical Rating (Net MWe): 1269
2. MaximumDependable Capacity(NetMWe): 1247 Unit 3 Generating Statistics This Month Yr. to Date Cumulative
3. Hours Reactor was Critical 744.0 5,088.0 82,283.6
4. Hours Generator was On-Line 744.0 5,088.0 81,423.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 925,321 6,352,424 98,706,301 UNIT SHUTDOWNS Types'ours Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Reason2 Reactor> to Prevent Occurrence No reactor shutdowns occurred during the month of July 1999.

"F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

g'" i~ . ~ 't 4

1 i~ r.

1