 Issue dateTitleTopic
ML17313A99221 June 1999Special Rept:On 990525,RMS mini-computer Was Removed from Service to Implement Yr 2000 Mod & Was OOS Longer than 72 H Allowed.Caused by Planned Y2K Mods.Preplanned Alternate Sampling Program Was InitiatedOffsite Dose Calculation Manual
ML17313A99118 June 1999Special Rept:On 990510,loose-part Detection Sys Channel 2 Was Declared Inoperable.Caused by Malfunction of Mineral Cable Connector to Accelerometer.Licensee Will Implement Modifications Which Will Enhance loose-part Detection Sys
ML17313A54013 August 1998Special Rept:On 980715,declared PASS Inoperable.Caused by Failure of Offgas Flush/Purge Control Handswitch HS0101. Handswitch Replaced & Post Maintenance Retesting Was Initiated
ML17313A12726 November 1997Special Rept 2-SR-97-002:on 971103,loose-part Detection Sys Channel 2 Declared Inoperable.Caused by Malfunction of Coaxial Cable Connector to accelerometer.Loose-part Detection Sys Channel Will Be Reworked
ML17312A6875 April 1996Rev 1 to Special Rept 2-SR-96-001,on 960404,alert Declared Due to Fire in Voltage Regulator for CR & Remote Shutdown Panel Essential Lighting,Clarifying Status of Power to UPS 2EQDNN02.Further Investigations Into Event Being Performed
ML17312A6614 April 1996Special Rept 2-SR-96-001:on 960404,fault Occurred in Voltage Regulator for CR & Remote Shutdown Panel Essential Lighting, Resulting in Fire in 100 Ft Elevation of Cb B Battery Equipment Room & Requiring Declaration of Alert,Per EPIP-04
ML17312A5771 March 1996Special Rept 1-SR-96-01 on:960225,unit 1 Turbine Tripped Followed by Reactor Power Cutback.Caused by Lightning Strike.Unit 1 Will Not Be Connected to Grid Until Repairs Can Be Made to C Neutral Bushing of Transformer
ML17311A89725 May 1995Special Rept:On 950416,loose-part Detection Sys Channel 1 Declared Inoperable.Caused by Malfunction of Coaxial Cable Connector to Transducer.Channel Will Be Reworked & Returned to Svc During First Available Outage of Sufficient Duration
ML17310B3629 June 1994Special Rept 1-SR-94-001:on 940511,plant Ventilation Sys High Range Effluent Monitors in Units 1 & 2 Inoperable for Periods Greater than 72 H.Caused by High Voltage Failure Alarm.Design Change Package InstalledOffsite Dose Calculation Manual
ML17310B30720 May 1994Special Rept 2-SR-94-002:on 940518,NOUE Declared Due to Fire Which Burned in Excess of 10 Minutes within Protected Area. Fire Extinguished W/Portable Fire Extinguisher.Investigation Initiated to Determine Cause of Fire & Develop C/As
ML17310A99513 January 1994Suppl 2 to Special Rept 3-SR-92-006:on 921217,PASS Declared Inoperable for Greater than Seven Days Following Failure to Meet Pressurized Sample Portion of Acceptance Criteria for Monthly Functional Sr.Pass Declared Operable on 921226
ML17310A99413 January 1994Suppl 2 to Special Rept 2-SR-92-004:on 921222,PASS Declared Inoperable for Greater than Seven Days Due to Failure of Containment Air Flow Indicator & Indication of Water Leakage at PASS RCS Sample Septum.Pass Declared Operable on 930105
ML17310A8953 January 1994Special rept:1-SR-93-008:on 940103,fuel Bldg Ventilation Sys High Range Radiation Monitor Inoperable for Period Greater than 72 Hours.Caused by Difficulties in Installing Mod 1-FJ-SQ-060Offsite Dose Calculation Manual
Post Accident Monitoring
ML17310A87025 December 1993Special Rept 1-SR-93-006:on 931224,30 Day Period for Returning loose-part Detection Sys (Lpds) to Operable Status Exceeded.Inoperable Lpds Channel Scheduled to Be Reworked & Returned to Svc During Next Outage of Sufficient Duration
ML17310A86715 December 1993Special Rept 1-SR-93-007:on 931215,30 Day Period for Returning Accelerometer to Operable Condition Exceeded. Accelerometer Will Be Replaced During Next Outage of Sufficient DurationEarthquake
ML17310A75830 October 1993Special Rept 1-SR-93-004:on 931008,high Range RM RU-146 Made Inoperable for Period of Greater than 72 H as Result of Scheduled Electrical Bus Outage.Maint on Associated Bus Completed on 931015 & RU-146 Returned to ServiceOffsite Dose Calculation Manual
Post Accident Monitoring
ML17310A7009 October 1993Special Rept 2-SR-93-003:on 931002,thirty Day Period for Returning loose-part Detection Sys Channel 8 to Operable Status Exceeded.Subj Channel Scheduled to Be Reworked & Returned to Svc During Next Outage
ML17310A63013 September 1993Special Rept 3-SR-93-003:on 930806,loose-part Detection Sys (Lpds) Declared Inoperable & Exceeded 30 Day Period for Being Returned to Svc on 930905.LPDS Channel 5 Scheduled to Be Reworked & Returned to Svc During Next Outage
ML17310A54011 August 1993Special Rept 1-SR-93-003:on 930806,NOUE Declared When Unit 1 CR Received Verification That Meteorological Instrumentation Unavailable Due to Loss of Power to Meteorological Tower. Caused by Severe Weather.Instrumentation RepairedHigh winds
ML17310A4962 August 1993Special Rept 2-SR-93-002:on 930722,Unit 2 in Mode 5,Cold Shutdown During Refueling Outage When ISI of Both SGs Completed.Insp Resulted in Plugging of 74 Tubes in SG 1 & 175 Tubes in SG 2
ML17310A44012 July 1993Special Rept 1-SR-93-002:on 930526,period for Returning Min Number of Explosive Gas Monitoring Channels to Operable Condition Exceeded.After All Four Cells Rebuilt,Calibr Completed on 930602 & Subj Analyzer Returned to Svc
ML17306B42324 April 1993Suppl 1 to Special Repts 2-SR-92-004 & 3-SR-92-006:on 921222 Unit 2 PASS Declared Inoperable Due to Failure of Containment Air Flow Indicator.On 921217,Unit 3 PASS Declared Inoperable.Equipment Replaced & Sample Obtained
ML17306B33715 March 1993Special Rept 2-SR-93-001:on 930314,control Room Personnel Manually Tripped Reactor Due to Rapid Decrease in Pressurizer Heaters.Personnel Commenced Controlled Plant Cooldown.Unit Remains Shut Down for Further Investigation
ML17306B29022 February 1993Special Rept 1-SR-92-005,suppl 1,provided Per Emergency Plan Implementing Procedure EPIP-03, Notification of Unusual Event Implementing Actions, Occurring on 920822 Re Loss of Power at Meteorological Tower
ML17306B2789 February 1993Special Rept 3-SR-93-001:on 930204,reactor Trip Occurred & Main Feedwater Pump a Experienced Rapidly Decreasing Pump Speed.Valid Actuation of SI Actuation Sys & Containment Isolation Actuation Sys Also Occurred.Evaluation Underway
ML17306B27227 January 1993Special Rept 3-SR-004-03:on 920817,PASS Inoperable for More than 7 Days.On 920902,discovered That PASS Unable to Draw Vacuum on Gaseous Sample Bomb.Vent Line Reworked & Procedure Revised
ML17306B25524 January 1993Special Rept 2-SR-92-004:on 921222,PASS Declared Inoperable for Period Greater than 7 Days Due to Failure of Containment Air Flow Indicator & Indication of Water Leakage at PASS Rcs.Pass Returned to Operable Status on 930105
ML17306B25624 January 1993Special Rept 1-SR-92-007:on 921227,CB Atmosphere RM Inoperable for Period Greater than 72 H Due to High Flow Conditions.Temporary Mod Installed on Subj RM to Remove Monitor from Dedicated Rms Grounding SysTemporary Modification
ML17306B25422 January 1993Special Rept 3-SR-92-006:on 921217,PASS Declared Inoperable Following Failure to Meet Pressurized Sample Portion of Acceptance Criteria for Monthly Functional Sr.Pass Returned to Operable Status Following Satisfactory Repairs & Testing
ML17306B19121 December 1992Special Rept 3-SR-92-004-01:on 920201 PASS Declared Inoperable for Period Greater than Seven Days.Caused by Tubing Being Rerouted.Pass Reworked & Operability Restored on 920905
ML17306B18414 December 1992Special Rept:On 920810,PASS Declared Inoperable Due to Tubing Being Rerouted.Chemistry Sys Status Procedure 74DP-9ZZ04 Revised to Direct Chemistry Personnel to Ensure That Functional Test Is performed.W/921214 Ltr
ML17306B12917 November 1992Special Rept 2-SR-92-003:on 921113,reactor Trip Occurred While Motor Generator Set a Out of Svc for Scheduled Maint & Set B Inadvertently Deenergized,Resulting in Loss of Power. State & Local Agencies Notified & Sys Reset
ML17306B09330 October 1992Suppl 1 to Special Rept 3-SR-92-004:on 920817,seven-day Period for Returning PASS to Service exceeded.30DP-9WP04 Revised to Retest for PASS & Gaseous Radwaste to Be Completed by 921120
ML17306A99518 September 1992Special Rept 3-SR-92-004:seven-day Period for Returning PASS to Svc Exceeded on 920817.On 920902,discovered That PASS Unable to Draw Vacuum on Gaseous Sample Bomb.Possibly Caused by Maint on 920810.PASS Reworked & Operability Restored
ML17306A96516 September 1992Special Rept 3-SR-92-003:on 920903,discovered That PASS Unable to Draw Vacuum on Gaseous Sample Bomb & Declared Inoperable for More than 7 Days.Cause Under Investigation. Sys Returned to Operable Status on 920905
ML17306A94028 August 1992Special Rept 1-SR-92-005:on 920822,discovered That Info Could Not Be Dispatched from Meterological Tower During Routine Surveillance of Daily Midnight Logs.Tower Declared Operable on 920823 Following Power Restoration
ML17306A81027 June 1992Special Rept 1-SR-92-004:on 920620,loose Part Detection Sys Inoperable for More than 30 Days.Caused by Hardware Problems Associated W/Installation of Loose Part Detection Sys Mods.New Computer Processor Board Installed
ML17306A79718 June 1992Special Rept 3-SR-92-003:on 920520,RMs RU-145 & 146 Declared Inoperable & Removed from Svc.Caused by Personnel Errors in Documenting Clearance for Retest of RU-146.Shift Supervisor Disciplined & Technician Verified That Pumps Were Energized
ML17306A79618 June 1992Special Rept 1-SR-92-003:on 920514,unit 1 Entered Mode 3 & PASS Declare Inoperable & Failed Surveillance Test.Caused by Leaking Relief Valve & Malfunctioning Pressure Transducer. Relief Valve & Pressure Transducer Replaced
ML17306A7106 May 1992Special Rept:On 920504,Control Room Received Alarms on All Seven Control Boards.Plan Computer Returned to Svc & Was Declared operable.W/920506 Ltr
ML17306A68118 April 1992Special Rept SR-92-002:on 920411,insp of SGs Resulted in Plugging of 23 Tubes in SG 1 & 18 Tubes in SG 2.Complete Results of SG Tube ISI Will Be Submitted by 930411
ML17306A4527 February 1992Special Rept:On 920101,PASS Declared Inoperable When Chemistry Personnel Could Not Obtain a Containment Air Sample.Caused by Malfunctioning Flow Sensor.Pass Expected to Be Returned to an Operable status.W/920207 Ltr
ML17306A3907 January 1992Special Rept 1-SR-92-001:on 920102,determined That Leak Existed in Pressurizer Steam Space Instrument Nozzle Mfg from Inconnel 600.Caused by Nonvisible Intergranular Crack.Addl Investigation UnderwayPressure Boundary Leakage
Pressure boundary leak
ML17306A2985 December 1991Special Rept 2-SR-91-002:on 911107,fuel Bldg Ventilation Sys high-range Radioactive Gaseous Effluent Monitor Inoperable for More than 72 H.Caused by Power Supply Deenergized for Scheduled Maint.Monitor Returned to Svc on 911114
ML17306A27920 November 1991Special Rept 3-SR-91-007:on 911115,mobile Crane Came in Contact W/Energized 13.8 Kv Power Line Resulting in Arcing of Crane Outrigger Pads to Ground & Burning of Asphalt Area in Contact W/Pads.Investigation Re Event Being Performed
ML17306A22210 October 1991Special Rept 1-SR-91-001-01:on 910111,fuel Bldg Ventilation Sys High Range Radioactive Gaseous Effluent Monitor Declared Inoperable for Period Greater than 72 H in Order to Perform Scheduled 18-month Surveillance Testing & Maint
ML17306A22110 October 1991Special Rept 2-SR-89-007-03:on 891002,fuel Bldg Ventilation Sys High Range Gaseous Effluent Monitor Declared Inoperable for More than 72 H.Caused by Low Flow Limit Switch Being Out of Adjustment.Microprocessor Operated Manual Mode
ML17306A22010 October 1991Special Rept 2-SR-90-005-01:on 900716,plant Vent Sys High Range Effluent Monitor Inoperable for More than 72 H.Caused by Requirement to Perform Scheduled 18-month Surveillance Testing.Monitor Returned to Svc on 900729
ML17306A21810 October 1991Special Rept 2-SR-90-004-01:on 910613,fuel Bldg Ventilation Sys high-range Radioactive Gaseous Effluent Monitor Inoperable for More than 72 H.Caused by Need to Perform 18 Month Surveillance Testing.Monitor Returned to SvcTemporary Modification
ML17305B74418 September 1991Special Rept 1-SR-91-002,on 910914:steam Generator Econimizer Valve SGN-FV-1112 Fully Opened Causing Level in Steam Generator 1 to Rapidly Increase.Caused by Malfunction of Lower Gripper High Voltage on Slipped Part Length CEADownpower