Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3
ML17300B327
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/31/1999
From: Fulton J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17300B329 List:
References
NUDOCS 9909170255
Download: ML17300B327 (6)


Text

NRC MONTHLYOPERATING DATAREPORT DOCKET hlO i UNITNAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-528 PVNGS-1 9/14/99 J. D. Fulton 602 250-3549 Reporting Period:

August 1999 1.

Design Electrical Rating (Net MWe):

1265 2.

MaximumDependable Capacity(NetMWe):

1243 Unit 1 Generating Statistics 3.

Hours Reactor was Critical This Month 744.0 Yr. to Date 5,779.8 Cumulative 87,649.0 4.

Hours Generator was On-Line 5.

Unit Reserve Shutdown Hours 6.

Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS Outage Duration No.

Date Type Hours Reason~

744.0 0.0 928,774 Method of Shutting Down ReactoR 5,772.1 0.0 86,402.7 0.0 Cause and Corrective Action to Prevent Occurrence 7,202,075 102,980,356 No reactor shutdowns occurred during the month of August 1999.

1F-Forced S-Scheduled

SUMMARY

~Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

'F90'Pi70255 9909'14 PDR ADQCK 05000528 R

PDR

0

~

NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:,

UNITNAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-529 PVNGS-2 9/14/99 J. D. Fuiton 602 250-3549 Reporting Period:

August 1999 1.

Design Electrical Rating (Net MWe):

1265 2.

MaximumDependable Capacity(NetMWe):

1243 Unit 2 Generating Statistics 3.

Hours Reactor was Critical 4.

Hours Generator was On-Line 5.

Unit Reserve Shutdown Hours 6.

Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS This Month 744.0 744.0 0.0 930,522 Yr. to Date 4,965.6 4,929.7 0.0 6,118,820 Cumulative 87,151.3 85,922.5 0.0 103,633,205 Outage Duration No.

Date Type" Hours Reason2 Method of Shutting Down ReactoR Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of August 1999.

1F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

I I

4

NRC MONTHLYOPERATING DATAREPORT DOCKET i)0.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-530 PVNGS-3 9/14/99 J. D. Fulton 602 250-3549 Reporting Period:

August 1999 1.

Design Electrical Rating (Net MWe):

1269 2.

MaximumDependable Capacity(NetMWe):

1247 Unit 3 Generating Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS This Month 744.0 744.0 0.0 928,163 Yr. to Date 5,832.0 5,832.0 0.0 7,280,587

'umulative 83,027.6 82,167.7 0.0 99,634,464 Outage Method of Duration Shutting Down No.

Date Type" Hours Reason~

ReactorS No reactor shutdowns occurred during the month of August 1999.

Cause and Corrective Action to Prevent Occurrence "F-Forced S-Scheduled

SUMMARY

~Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) sMethod:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)