ML17313A738

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With
ML17313A738
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/31/1998
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00527-GRO-J, 35-527-GRO-J, NUDOCS 9901200334
Download: ML17313A738 (9)


Text

~

'W ~

CATEGORY 1 REGULATORY INFORMATION D1STRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:990 FACIL:STN-50-528 STN-50-529 STN-50-530 AUTH.NAME FULTON,J'.D.

,gWRBECK,G.R.

RECIP.NAME 1200334 DOC.DATE:

4, Palo Verde Nuclear Station, Palo Verde Nuclear Station, Palo Verde Nuclear Station, AUTHOR AFFILIATION Arizona Public Service Co.

Arizona Public Service Co.

RECIPIENT AFFILIATION Unit 1, Arizona Publi 05000528 Unit 2, Arizona Publi 05000529 Unit 3, Arizona Publi 05000530 (formerly Arizona Nuclear Power (formerly Arizona Nuclear Power

SUBJECT:

Monthly operating repts for Dec 19 Verde Nuclear Generating Station, Units 1,2

.With 990113 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL t

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: STANDARDIZED PLANT Standardized plant.

Standardized plant.

0500052&

05000529 0500053(0'ECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: A FILE CENT COPIES LTTR ENCL 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME FIELDS,M AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1

1 1

1 1

1 EXTERNAL: LITCO BRYCE,Q' NRC PDR 1

1 1

1 NOAC 1

1 E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

~

~

Commttmoot. Inomfotloo. Emmy.

Palo Verde Nuclear Generating Station Gregg R. Overbeck Vice President Nuclear Production TEL 602I393-5148 FAX 602/3936077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ85072-2034 035-00527-GRO/JDF January 13, 1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for DECEMBER 1998 Enclosed are the Monthly Operating Reports for December

1998, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

Ifyou have any questions, please contact Judy Fulton at (602) 250-,3549.

Sincerely, GRO/JDF/cj

Enclosures:

DECEMBER 1998 Monthly Operating Reports cc:

E. W. Merschoff P. H. Harrell INPO Records Center UtilityData Institute (all w/enclosures) 990i200334 98i23i PDR AoaCI4, Oa000m8

','(

R

~PDR

4

NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:

UNITNAME:

DATE COMPLETED BY:

TELEPHONE:

55526

&KM MiBL99 JJ2JMan Reporting Period:

December 1998 1.

Design Electrical Rating (Net MWe):

1265 2.

Maximum Dependable Capacity (Net MWe):

1243 Unit 1 Generating Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS This Month 744.0 744.0 0.0 925,733 Yr. to Date 7,872.9 7,819.5 0.0 9,575,013 Cumulative 81,869.2 80,630.6 0.0 95,778,281 Outage Method of Duration Shutting Down No.

Date Type1 Hours Reason2 Reactors No reactor shutdowns occurred during the month of December 1998.

Cause and Corrective Action to Prevent Occurrence 1F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) sMethod:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

'U

~e

~

~

dl NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:

UNIT NAME:

DATE:.

COMPLETED BY:

TELEPHONE:

2829 EEkRRR

~52 dJ2~taa Reporting Period:

December 1998 1.

Design Electrical Rating (Net MWe):

1265 2.

MaximumDependable Capacity(Net MWe):

1243 Unit 2 Generating Statistics

". This Month 'r. to Date Cumulative 3.

Hours Reactor was Critical 4.

Hours Generator was On-Line 5.

Unit Reserve Shutdown Hours 744.0 744.0 0.0 8,760.0 8,760.0 0.0 82,185.7 80,992.8 0.0 6.

Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS 946,126 11,084,826 97,514,385 No.

Outage Method of Duration Shutting Down Date Type~

Hours Reason~

Reactors Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 1998.

"F-Forced S-Scheduled

SUMMARY

~Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SMethod:

1-Manual 2-Manual Trip/ Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain) r

~ '

P h

NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:

SLED UNITNAME:

Hl~

DATE'13l92 COMPLETED BY:

TELEPHONE:

Reporting Period:

December 1998 1.

Design Electrical Rating (Net MWe):

1269 2.

Maximum Dependable Capacity (Net MWe):

1247 Unit 3 Generating Statistics Hours Reactor was Critical Hours Generator was On-Line This Month 744.0 744.0 Yr. to Date 7,869.9 7,836.1 Cumulative 77,195.6 76,335.7 Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS 0.0 938,168 0.0 0.0 9,600,906 92,353,877 No.

Outage Method of Duration Shutting Down Date Types'ours Reason~

Reactors Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 1998.

F-Forced S-Scheduled

SUMMARY

~Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) sMethod:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain) rM

~

ak

'1,

~

'I

~

~

1A,

~t