ML17313A530

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for July 1998 for Pvgns,Units 1,2 & 3
ML17313A530
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/31/1998
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00512-GRO-J, 35-512-GRO-J, NUDOCS 9808180079
Download: ML17313A530 (9)


Text

CATEGORY 1 REGULA'.aRY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:980 FACIL:STN-50-528 STPT-5$ - 529 STN-56'-'530 AUTH.NAME FULTON,J.D.

OVERBECK,G.R.

RECIP.NAME Palo Verde Nuclear Station, Palo Verde Nuclear Station, Palo Verde Nuclear Station, AUTHOR AFFILIATION Arizona Public Service Co.

Arizona Public Service Co.

RECIPIENT AFFILIATION NOTARIZED: NO Unit 1, Arizona Publi Unit 2, Arizona Publi Unit 3, Arizona Publi DOCKET 05000528 05000529 05000530 (formerly Arizona Nuclear Power (formerly Arizona Nuclear Power

SUBJECT:

Mo

.W 980812 ltr.

repts for July 1998 for PVGNS,Units 1,2 S

DISTRIBUTION CODE:

IE24D COPIES RECEXVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

E 05000528@

05000529 05000530p RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME FIELDS,M COPIES LTTR ENCL 1

1 INTERNAL: A RGN4 CENT 1

1 1

1 1

1 AEOD/SPD/RRAB OC/DBA/PAD 1

1 1

1 EXTERNAL: LITCO BRYCE,J H

NRC PDR 1

1 1

1 NOAC 1

1 D

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

IK C

r 1

4 1

'I

~

~

II 4

~

l

Cwnmitmnnt. /nlnnmtimLEeet/I Palo Verde Nuclear Generating Station Gregg R. Overbeck Vice President Nuclear Production TEL 602/393-5148 FAX 602/3934077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 035-00512-GRO/JDF August 12, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555 Dear Sirs;

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for JULY 1998 Enclosed are the Monthly Operating Reports for July 1998, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

Ifyou have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, GRO/JDF/cj

Enclosures:

JULY 1998 Monthly Operating Reports cc:

E. W. Merschoff K. E. Perkins INPO Records Center UtilityData Institute (all w/enclosures) 9808%80079 98073iiT PDR

. ADQCK 05000528 R

r PDRj

t t

NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:,,

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

CL526 MKK.

BLLUBG JJ2JMaa Reporting Period:

July 1998 1.

Design Electrical Rating (Net MWe):

1265 2.

Maximum Dependable Capacity (Net MWe):

1243

- 'Unit1.'Generating Statistics This Month

'Yr. to Date Cumulative 3.

Hours Reactor-was Critical 4.

Hours Generator was On-Line 5.

Unit Reserve Shutdown Hours 6.

Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS 744.0 744.0 0.0 912,789 4,200.9 4,147.5 0.0 5,042,777 78,197.2 76,958.6 0.0 91,246,045 Outage Method of Duration Shutting Down No.

Date Types'ours Reason>

ReactoR No reactor shutdowns occurred during the month of July 1998.

Cause and Corrective Action to Prevent Occurrence "F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

L P

i t

NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:,;

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

5%529 MKiH 5L11LRG

~ultan Reporting Period:

July 1998 1.

Design Electrical Rating (Net MWe):

1265 2.

MaximumDependable Capacity(NetMWe):

1243 Unit 2 Generating Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS This Month 744.0 744.0 0.0 932,118 Yr. to Date 5,088.0 5,088.0 0.0 6,446,269 Cumulative 78,513.7 77,320.8 0.0 92,875,828 Outage Method of Duration Shutting Down No.

Date Type" Hours Reason2 Reactors No reactor shutdowns occurred during the month of July 1998.

Cause and Corrective Action to Prevent Occurrence "F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain) 1% L s~O tj

I+

~

V 4

NRC MONTHLYOPERATING DATAREPORT 4

DOCKET NO.: w-UNIT NAME:

EEKzM DATE:

QLLUBG COMPLETED BY:

~ulfQQ Reporting Period:

July 1998 1.

Design Electrical Rating (Net MWe):

1269 2.

Maximum Dependable Capacity (Net MWe):

1247 Unit 3 Generating Statistics-Hours Reactor was Critical This Month 744.0 Yr. to Date 5,088.0 Cumulative 74,413.7 Hours Generator was On-Line, Unit Reserve, Shutdown'Hours Net Electrical Energy, Generated (MWh):

UNITSHUTDOWNS 744.0 0.0 912,720 5,088.0 0.0 73,587.6 0.0 6,332,942 89,085,913 Outage Method of Duration Shutting Down No.

Date Type" Hours Reason2 Reactors No reactor shutdowns occurred during the month of July 1998.

Cause and Corrective Action to Prevent Occurrence "F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training I License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) sMethod:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip I Scram 4-Continuation 5-Other-(Explain) v

-e v

l k

~, wp I '