ML17313A656
| ML17313A656 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/30/1998 |
| From: | Fulton J, Overbeck G ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 035-00519-GRO-J, 35-519-GRO-J, NUDOCS 9810150208 | |
| Download: ML17313A656 (8) | |
Text
CATEGORY 1-REGULATORY INFORMATION DISTRIBUTI SYSTEM (RIDS)
ACCESSION NBR:9810150208 DOC.DATE:
FACIL:STN-50-528 Palo Verde Nuclear Station, STN-50-529, Palo Verde Nuclear Station, STN-50-530 Palo Verde Nuclear Station, AUTH.NAME AUTHOR AFFILIATION FULTON,J. D.
Arizona Public Service Co.
OVERBECK,G.R.
Arizona Public Service Co.
RECIP.NAME RECIPIENT AFFILIATION Unit 1, Arizona Publi Unit 2, Arizona Publi Unit 3, Arizona Publi DOCKET 05000528 05000529 05000530 (formerly Arizona Nuclear Power (formerly Arizona Nuclear Power
SUBJECT:
Monthl o
'ng rept for Sept 1998 for PVNGS Units 1,2
.With 981007 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES: STANDARDIZED PLANT Standardized plant.
Standardized plant.
05000528 05000529 p 05000530 R
RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS LE CE R
EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME FIELDS,M AEOD/SPD/RRAB OC/DBA/PAD NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
"E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
~
~
Palo Verde Nuclear Generating Station Gregg R. Overbeck Vice President Nuclear Production TEL 602I39M148 FAX 602/3936077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ85072-2034 035-00519-GRO/JDF October 7, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for SEPTEMBER 1998 Enclosed are the Monthly Operating Reports for September
- 1998, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
Ifyou have any questions, please contact Judy Fulton at (602) 250-3549.
Sincerely, GRO/JDF/cj
Enclosures:
SEPTEMBER 1998 Monthly Operating Reports cc:
E. W. Merschoff K. E. Perkins INPO Records Center UtilityData Institute (all w/enclosures)
.<<98i0150208 9t80930
I1 tl
NRC MONTMLYOPERATING DATAREPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
SLAG r
I l
EHKi i92LBQ JJ2.~aa Reporting Period:
September 1998 1.
Design Electrical Rating (Net MWe):
1265 2.
MaximumDependable Capacity(NetMWe):
1243 Unit 1 Generating Statistics 3.
Hours Reactor was Critical 4., Hours Generator was On-Line 5.
Unit Reserve Shutdown Hours 6.
'Net Electrical Energy Generated (MWh)
UNITSHUTDOWNS This Month 720.0 720.0 0.0 884,788 Yr. to Date 5,664.9 5,611.5 0.0 6,834,313 Cumulative 79,661.2 78,422.6 0.0 93,037,581 Outage Duration No.
Date Type" Hours Reason2 Method of Shutting Down Reactor Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of September 1998.
"F-Forced S-Scheduled
SUMMARY
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
vo f'
NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:
UNITNAME:
DATE:
COMPLETED BY TELEPHONE:
5M
~
El5!K2 iQLT/K
~ultan Reporting Period:
September 1998 1.
Design Electrical Rating (Net MWe):
1265 2.
Maximum Dependable Capacity (Net MWe):
1243 3.
Unit 2 Generating Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)
This Month 720.0 720.0 0.0 904,553 Yr. to Date 6,552.0 6,552.0 0.0 8,281,548 Cumulative 79,977.7 78,784.8 0.0 94,711,107 UNITSHUTDOWNS No.
Outage Duration Date Type Hours Reason2 Method of Shutting Down ReactoR Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of September 1998.
"F-Forced S-Scheduled
SUMMARY
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training I License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip I Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:
UNITNAME:
DATE:
COMPLETED BY:
TELEPHONE:
Z-~X MK&
%2LBG JJ2.~ra Reporting Period:
September 1998 1.
Design Electrical Rating (Net MWe):
1269 2.
Maximum Dependable Capacity (Net MWe):
1247 Unit 3 Generating Statistics 3.
Hours Reactor was Critical 4.
Hours Generator was On-Line 5.
Unit Reserve Shutdown Hours 6.
Net Electrical Energy Generated (MWh)
UNITSHUTDOWNS This Month 432.0 432.0 0.0 469,385 Yr. to Date 6,264.0 6,264.0 0.0 7,713,367 Cumulative 75,589.7 74,763.6 0.0 90,466,338 Outage Duration No.
Date Types'ours Reason2 98-01 9/19/98 S
288.0 C
Method of Shutting Down ReactoR Cause and Corrective Action to Prevent Occurrence Unit was manually tripped to begin 7~
Refueling Outage.
F-Forced S-Scheduled
SUMMARY
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
~
~
J4
'J 1f f
I