ML17300B315

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With
ML17300B315
Person / Time
Site: Palo Verde  
Issue date: 06/30/1999
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00547-GRO-J, 35-547-GRO-J, NUDOCS 9907220057
Download: ML17300B315 (9)


Text

CATEGORY 1 REGULA RY INFORMATION DISTRIBUTION. SYSTEM (RIDS)

ACCESSJ.QN NBR:9907220057 DOC.DATE:

FACIL:STN.-50-528 Palo Verde Nuclear Station, STN-50-529 Palo Verde Nuclear Station, STN-50-530 Palo Verde Nuclear Station, AUTH.NAME AUTHOR AFFILIATION FULTON,J.D.

Arizona Public Service Co.

OVERBECK,G.R.

Arizona Public Service Co.

RECIP.NAME RECIPIENT AFFILIATION Unit 1, Arizona Publi Unit 2, Arizona Publi Unit 3, Arizona Publi DOCKET ¹ 05000528 05000529 05000530 (formerly Arizona Nuclear Power (formerly Arizona Nuclear Power

SUBJECT:

Monthl operating repts for June 1999 for PVNGS,Units 1,2

.With 9 07 4

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: STANDARDIZED PLANT Standardized plant.

Standardized plant.

E 05000528 g

05000529 05000530 p

RECIPIENT ID CODE/NAME FIELDS,M COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME COPIES LTTR ENCL INTERNAL: ACRS OC/DBA/PAD RGN4 1

1 1

1 1

1 ILE CENTE 0

OERAB 1

1 1

1 EXTERNAL LMITCO MARSHALL NRC PDR 1

1 1

1 NOAC 1

1 D

'E I>)Ill(j~'gllJ'-(pl[,,'I;,g NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

~ Commitment. Innnrnllon. &ergy.

Palo Verde Nuclear Generating Station Gregg R. Overbeck Vice President Nuclear Production TEL 602I3Kk5148 FAX 602I3934077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 035-00547-GRO/JDF July 14, 1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for JUNE 1999 Enclosed are the Monthly.Operating Reports for June 1999, prepared and submitted pursuant to SpeciTication 6.9.1.6 of Appendix A (Technical SpeciTications) to the PVNGS Units.1, 2, and 3 Operating Licenses.,

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

Ifyou have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, GRO/JDF/cj

Enclosures:

JUNE 1999 Monthly Operating Reports cc:

E. W. Merschoff

. (all w/enclosures)

,. P." H. Harrell INPO Records Center, UtilityData Institute l

'Il907220057.990630 PDR ADQCK".05000528 R

PDR

ro rr

~

II Ir

~ II I

II I,

t t

NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-528 PVNGS-1 7/13/99 J. D. Fulton 602 250-3549 Reporting Period:

June 1999 1.

Design Electrical Rating (Net MWe):

1265 2.

MaximumDependableCapacity(Net MWe):

1243 Unit 1 Generating Statistics 3.

Hours Reactor was Critical 4.

Hours Generator was On-Line 5.

Unit Reserve Shutdown Hours This Month 720.0 720.0 0.0 Yr. to Date 4,291.8 4,284.1 0.0 Cumulative 86,161.0 84,914.7 0.0 6.

Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS Outage Duration No.

Date Type Hours Reason2 902,721 Method of Shutting Down ReactoR 5,348,964 101,127,245 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of June 1999.

F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) sMethod:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

tl Il II tl

, ~

II

\\

'1 I'

, ~

lt, II l~

NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-529 PVNGS-2 7/13/99 J. D. Fulton 602 250-3549 Reporting Period:

June 1999 1.

Design Electrical Rating (Net MWe):

1265 2.

Maximum Dependable Capacity (Net MWe):

1243 Unit 2 Generating Statistics Hours-Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS This Month.

695.1 684.5 0.0 843,110 Yr. to Date 3,477.6 3,441.7 0.0 4,258,125 Cumulative 85,663.3 84,434.5 0.0 101,772,510 No.

Outage Method of Duration Shutting Down Date Types'ours Reason2 ReactoR Cause and Corrective Action to Prevent Occurrence 99-02 6/18 F

355 A

Unit tripped on CEAC f/2 failure.

"F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

~

~

I y

l'I IL

  • II g 'I II v

I

NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:

UNITNAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-530 PVNGS-3 7/13/99 J. D. Fulton 602 250-3549 Reporting Period:

June 1999 Design Electrical Rating (Net MWe):

1269 2.

Maximum Dependable Capacity (Net MWe):

1247 Unit 3 Generating Statistics 3.

Hours Reactor was Critical 4.

Hours Generator was On-Line 5.

Unit Reserve Shutdown Hours, 6.

Net Electrical Energy Generated (MWh)

UNITSHUTDOWNS This Month 720.0 720.0 0.0 894,524 Yr. to Date 4,344.0 4,344.0 0.0 5,427,'I 03 Cumulative 81,539.6 80,679.7 0.0 97,780,980 Outage Duration No.

Date Type1 Hours Reason2 Method of Shutting Down ReactoR Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of June 1999.

F-Forced S-Scheduled

SUMMARY

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

C

~

4

~

~

~