ML18081A863: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 07/19/1977
| issue date = 07/19/1977
| title = Forwards LER 77-046/03L-0
| title = Forwards LER 77-046/03L-0
| author name = LIBRIZZI F P
| author name = Librizzi F
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name = GRIER B H
| addressee name = Grier B
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000272
| docket = 05000272

Revision as of 16:35, 17 June 2019

Forwards LER 77-046/03L-0
ML18081A863
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/19/1977
From: Librizzi F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18081A856 List:
References
NUDOCS 8001080532
Download: ML18081A863 (3)


Text

"*. nsWGJG m---Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 2011622-7000 M.r. James P. O'Reilly Director of USNRC Off ice of Inspections and Enforcements Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. 0 1 Reilly:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 77-46/03L July 19, 1977 Pursuant to the reouj.reinents of Salem Generatinq Station Unit No. 1 Technical.

Spicifi6ations, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 77-46/03L.

This report is required within thirty (30) days of the occurrence.

CC: Director, Office of Inspection and Enforcement (30 copies) Director, Office of Information and Program Control (3 copies) Sincerely yours, Original Signed I'. P. Libriz?.i F. P. Librizzi General Manager -Electric Production 8001 08() 532 96*2001 :!DOM 10-*,

\ Report Number: Report Date: Occurrence Date: 77-46/03L 7/12/77 6/28/77 Facility:

Salem Generating Station Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Loss of No. 2 Station Power Transformer (Interconnect between offsite transmission network and onsite Class lE) CONDITIONS PRIOR TO OCCURRENCE:

Operational Mode 2, Reactor Power: 10-8 amps DESCRIPTION OF OCCURRENCE:

At 1140 hours0.0132 days <br />0.317 hours <br />0.00188 weeks <br />4.3377e-4 months <br />, during testing of the 1-5, 500kV GCB, the 1-5 breaker* was closed in the test position.

The 1-8, 500kV GCB opcnej as well as the 3-4 and 4-5, 13kV breakers.

This action isolated the 500kV Bus Section No. 1 and the 13kV Bus Section No. 4. The F ane G gr0up busses were de-energized and 13 and 14 Reactor Coolant Pumps fed from the G group busses were lost. Technical Specification 3.R.J.l.a was mented and surveillance 4.8.1.1.1.a and 4.8.1.1.2.a.2 was

  • ' At 1320, the 500kV, 1-8 GCB and the 3-4 and 4-5, 13kV brer:J-:ers wsre closed to establish a normal electrical lineup. At 1324, Action ment 3.8.1.l was terminated.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The cause of this event was personnel error. During the testing of the Bus Section 1-5, 500kV breaker, the breaker and ground tion circuit was not tagged out of service. When the 1-5 breaker was closed in the test position, the protective relay ciicuit saw this as a "stuck breaker" and. is.elated the apparent fault. ANALYSIS OF OCCURRENCE:

Technical Action Statement 3.8.1.1.a allows 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore an inoperable offsite circuit to operable status. The No. 2 Station Power transformer was restored to operable status in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 44 minutes, therefore, the Technical Specifications were not violated.

This event did not cause any personal injury or equipment damage.

. , Report No. 77-46/03L e 7/12/77 ,. CORRECTIVE ACTION: The breaker failure and ground protection circuit was tagged out of service for the remainder of the breaker testing. The SOOkV, Bus Section 1-8 breaker and the 13kV, Bus Section 3-4 and 4-5 breakers were reclosed to restore the electrical distribution system to normal. Although the SOOkV breakers are non-safety related, a detailed cedure covering testing of switchyard components is being prepared and should be available by September 1, 1977. FAILURE DATA: Not Applicable.

Prepared by T. Spencer SORC Meeting No.

75-77