|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:Robert A. Saccone Vice President |
| | -Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com ppl Ti v TM April 14,2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop, O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA -006052 The March 2006 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.Very truly yours, Rober. Saccone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Alan Blarney NRC Project Manager, Mr. R V. Guzman-- -:qF:, |
| | OPERATING DATA REPORT DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/12/2006 J. J. Hennings (570) 542-3747 1.2.3.4.OPERATING STATUS Unit Name: Susguehanna Steam Electric Station (Ul)Reporting Period: March 2006 Design Electrical Rating (Net MWe): 1177 Maximum Dependable Capacity (Net MWe): 1135 5.6.7.8.9.Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)This Month 744 79.12 72.03 0 71,631 Yr.-to-Date 2160.0 1495.1 1488.03 0 1,689,903 Cumulative 199,993.0 168,872.6 165,445.1 0 171,772,961 NOTES: Page 1 of I UNIT SHUTDOWNS DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/12/2006 J. J. Hennings (570) 542-3747 REPORT MONTH March 2006 No.Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 1 3/4/06 S 671.97 C 5 Reactor shutdown on March 4,2006 for refueling (continuing) (Soft Shut- outage 14.down)[Summary: 1.F. Forced S. Scheduled 2.Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)3.Method: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page I of I SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None.Date: 04/12/06 Telephone: |
| | (570) 542-3747 OPERATING DATA REPORT DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/12/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS 5. Unit Name: Susquehanna Steam Electric Station (U2)6. Reporting Period: March 2006 7. Design Electrical Rating (Net MWe): 1182 8. Maximum Dependable Capacity (Net MWe): 1140 5. Hours in Reporting Period 6. Number of Hours Reactor Was Critical 7. Hours Generator On-Line 8. Unit Reserve Shutdown Hours 9. Net Electrical Energy Generated (MWH)NOTES: This Month 744 744 744 0 865,432 Yr.-to-Date 2160 2160 2160 0 2,511,432 Cumulative 185,233 162,831.7 160,753.5 0 170,212,306 Page I of I UNIT SHUTDOWNS 4 DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/12/2006 J. J. Hennings (570) 542-3747 REPORT MONTH March 2006 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting to Prevent Recurrence Down Reactor N 3 s No reactor shutdowns this month.Summary: The one power change greater than 20% this month was a reduction of 27% for a planned Control Rod adjustment and scram time testing starting on 3/10/06.1.2.3.F. Forced S. Scheduled Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)Method: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page 1 of I SUSOUEHANNA STEAM ELECTRIC STATION Docket Number: 50-388 Date: 04/12/2006 Completed by: J. J. Hennings Telephone: |
| | (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.}} |
Latest revision as of 15:16, 11 November 2018
|
---|
Category:Letter
MONTHYEARPLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8123, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 2024-09-06
[Table view] Category:License-Monthly Operating Report
MONTHYEARPLA-0061, September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 22006-10-13013 October 2006 September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 2 ML0626904702006-09-14014 September 2006 August 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 ML0623501472006-08-15015 August 2006 Monthly Operating Reports PLA-0060, June 2006 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 22006-07-14014 July 2006 June 2006 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 2 ML0618703972006-06-15015 June 2006 May 2006 Monthly Operating Report for Susquehanna Units 1 and 2 ML0614405052006-05-15015 May 2006 April 2006 Monthly Operating Report for Susquehanna Units 1 & 2 ML0611601332006-04-14014 April 2006 March 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 & 2 ML0608704012006-03-10010 March 2006 February 2006 Monthly Operating Report for Susquehanna Units 1 and 2 ML0605304122006-02-13013 February 2006 Susquehanna Units 1 and 2 Monthly Operating Reports for January 2006 ML0602602862006-01-13013 January 2006 December 2005 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0059, November 2005 Operating Report for Susquehanna, Units 1 and 22005-12-12012 December 2005 November 2005 Operating Report for Susquehanna, Units 1 and 2 PLA-0596, August 2005 Monthly Operating Report for Susquehanna Units 1 and 22005-09-14014 September 2005 August 2005 Monthly Operating Report for Susquehanna Units 1 and 2 PLA-0000, June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 22005-07-13013 July 2005 June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 2 PLA-0589, April 2005 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 22005-05-10010 May 2005 April 2005 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 2 PLA-0058, March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 22005-04-13013 April 2005 March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 ML0436304132004-12-13013 December 2004 November 2004 Monthly Operating Report, Susquehanna Steam Electric Station PLA-0057, July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station2004-08-13013 August 2004 July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station PLA-0056, October 2003 Monthly Operating Report for Susquehanna, Units 1 & 22003-11-13013 November 2003 October 2003 Monthly Operating Report for Susquehanna, Units 1 & 2 PLA-0055, December 2002 Monthly Operating Report for Susquehanna2003-01-13013 January 2003 December 2002 Monthly Operating Report for Susquehanna PLA-5574, November 2002 Monthly Operating Report for Susquehanna Steam Electric Station2002-12-13013 December 2002 November 2002 Monthly Operating Report for Susquehanna Steam Electric Station ML0227503732002-09-13013 September 2002 August 2002 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0005, July 2002 Monthly Operating Report for Susquehanna Units 1 & 22002-08-14014 August 2002 July 2002 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0054, June 2002 Monthly Operating Report for Susquehanna Steam Electric Station2002-07-12012 July 2002 June 2002 Monthly Operating Report for Susquehanna Steam Electric Station PLA-0545, February 2002 Monthly Operating Report for Susquehanna Units 1 & 22002-03-13013 March 2002 February 2002 Monthly Operating Report for Susquehanna Units 1 & 2 2006-09-14
[Table view] |
Text
Robert A. Saccone Vice President
-Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com ppl Ti v TM April 14,2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop, O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA -006052 The March 2006 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.Very truly yours, Rober. Saccone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Alan Blarney NRC Project Manager, Mr. R V. Guzman-- -:qF:,
OPERATING DATA REPORT DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/12/2006 J. J. Hennings (570) 542-3747 1.2.3.4.OPERATING STATUS Unit Name: Susguehanna Steam Electric Station (Ul)Reporting Period: March 2006 Design Electrical Rating (Net MWe): 1177 Maximum Dependable Capacity (Net MWe): 1135 5.6.7.8.9.Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)This Month 744 79.12 72.03 0 71,631 Yr.-to-Date 2160.0 1495.1 1488.03 0 1,689,903 Cumulative 199,993.0 168,872.6 165,445.1 0 171,772,961 NOTES: Page 1 of I UNIT SHUTDOWNS DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/12/2006 J. J. Hennings (570) 542-3747 REPORT MONTH March 2006 No.Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 1 3/4/06 S 671.97 C 5 Reactor shutdown on March 4,2006 for refueling (continuing) (Soft Shut- outage 14.down)[Summary: 1.F. Forced S. Scheduled 2.Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)3.Method: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page I of I SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None.Date: 04/12/06 Telephone:
(570) 542-3747 OPERATING DATA REPORT DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/12/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS 5. Unit Name: Susquehanna Steam Electric Station (U2)6. Reporting Period: March 2006 7. Design Electrical Rating (Net MWe): 1182 8. Maximum Dependable Capacity (Net MWe): 1140 5. Hours in Reporting Period 6. Number of Hours Reactor Was Critical 7. Hours Generator On-Line 8. Unit Reserve Shutdown Hours 9. Net Electrical Energy Generated (MWH)NOTES: This Month 744 744 744 0 865,432 Yr.-to-Date 2160 2160 2160 0 2,511,432 Cumulative 185,233 162,831.7 160,753.5 0 170,212,306 Page I of I UNIT SHUTDOWNS 4 DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/12/2006 J. J. Hennings (570) 542-3747 REPORT MONTH March 2006 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting to Prevent Recurrence Down Reactor N 3 s No reactor shutdowns this month.Summary: The one power change greater than 20% this month was a reduction of 27% for a planned Control Rod adjustment and scram time testing starting on 3/10/06.1.2.3.F. Forced S. Scheduled Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)Method: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page 1 of I SUSOUEHANNA STEAM ELECTRIC STATION Docket Number: 50-388 Date: 04/12/2006 Completed by: J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.