| number = ML17361A042
| number = ML18198A217
| issue date = 12/26/2017
| issue date = 07/16/2018
| title = River Bend Station - Notification of NRC Initial Operator Licensing Examination 05000458/2018301
| title = River Bend Station - NRC Initial Operator Licensing Examination Approval 05000458/2018301
| author name = Gaddy V G
| author name = Gaddy V G
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
Line 9: Line 9:
| docket = 05000458
| docket = 05000458
| license number = NPF-047
| license number = NPF-047
| contact person =  
| contact person = Gaddy V G
| document report number = 50-458/OL-18-01
| document report number = ER 2018301
| document type = Letter, License-Operator, Part 55 Examination Related Material
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 3
| page count = 4
}}
}}


Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::December 26, 2017]]
Mr. William F. Maguire, Vice President Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775
SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000458/2018 30 1
==Dear Mr. Maguire:==
In a telephone conversation on October 11, 201 7, between Messrs. G. Krause , Facility Representative, and B. Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at River Bend Station during the week of July 23, 201 8. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 1 1 , and NUREG-1123, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test examination outlines by February 23, 201 8. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES
-201 will be due by May 9, 201 8. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready
-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on
-site validation of the examinations is required during the week of June 18, 201 8. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES
-402 , and to make the simulation facility available on the dates noted above. In accordance with ES
-302, your staff shall retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG
-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150
-0024), and waiver requests (if any) (OMB approval number 3150
-0090) by June 23, 201 8. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted by July 9, 201 8. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501, et seq.). These information collections were approved by OMB, under approval number 3150
-0018, which expires on June 30, 2019. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T
-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150
-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading
-rm/adams.html. Thank you for your cooperation in this matter. Mr. Krause has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-200-1 17 2 or myself at 817-200-1159.
Sincerely,/Jeremy R. Groom Acting for/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50
-458 License No. NPF
-47 cc: Electronic Distribution
ML17361A042 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: BLarso n Yes No Publicly Available Sensitive NRC-002 OFFICE SOE:OB C:OB NAME BLarson VGaddy SIGNATURE /RA/ /RA/ JRG for DATE 12/22/2017 12/26/2017
}}
}}

Revision as of 05:34, 12 September 2018

River Bend Station - NRC Initial Operator Licensing Examination Approval 05000458/2018301
ML18198A217
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/16/2018
From: Vincent Gaddy
Operations Branch IV
To: Maguire W F
Entergy Operations
Gaddy V G
References
ER 2018301
Download: ML18198A217 (4)