{{#Wiki_filter:* *===,Ent W3F1-2017-0079 December 6, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Operations, Inc . 17265 River Road Killona, LA 70057-3093 Tel 504-739-6685 Fax 504-739-6698 jjarrel@entergy
{{#Wiki_filter:* *===, Ent W3F1-2017-0079 December 6, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Operations, Inc . 17265 River Road Killona, LA 70057-3093 Tel 504-739-6685 Fax 504-739-6698 jjarrel@entergy
.com John P. Jarrell Regulatory Assurance Manager Waterford 3 10 CFR 50.71(e)  
.com John P. Jarrell Regulatory Assurance Manager Waterford 3 10 CFR 50.71(e)  


==Subject:==
==Subject:==
 
Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 through November 30, 2017 Waterford Steam Electric Station, Unit 3 (Waterford  
Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 through November 30, 2017 Waterford Steam Electric  
: Station, Unit 3 (Waterford  
: 3) Docket No. 50-382 License No. NPF-38  
: 3) Docket No. 50-382 License No. NPF-38  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Pursuant to Waterford Steam Electric Station Unit 3 (Waterford  
Pursuant to Waterford Steam Electric Station Unit 3 (Waterford  
: 3) Technical Specification (TS) 6.16, Entergy Operations, Inc. (EOI) hereby submits an update of all changes made to the Waterford 3 Technical Specification Index and Bases since the last submittal per letter W3F1-2016-0041 (ADAMS Accession No. ML 14309A687),
: 3) Technical Specification (TS) 6.16, Entergy Operations, Inc. (EOI) hereby submits an update of all changes made to the Waterford 3 Technical Specification Index and Bases since the last submittal per letter W3F1-2016-0041 (ADAMS Accession No. ML 14309A687), dated June 2, 2016. This update satisfies the submittal frequency required by TS 6.16, which indicates that the submittal will be made at a frequency consistent with 1 O CFR 50. 71 (e) and exemptions thereto. There are no commitments associated with this submittal.
dated June 2, 2016. This update satisfies the submittal frequency required by TS 6.16, which indicates that the submittal will be made at a frequency consistent with 1 O CFR 50. 71 (e) and exemptions thereto.
Should you have any questions or comments concerning this submittal, please contact the Regulatory Assurance Manager, John Jarrell, at (504) 739-6685. ( Attachments:  
There are no commitments associated with this submittal.
: 1. Waterford 3 Technical Specification Index and Bases Change List 2. Waterford 3 Technical Specification Index and Bases Revised Pages W3F1-2017-0079 Page 2 cc: Mr. Kriss Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd. Arlington, TX 76011-4125 NRG Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 RidsRgn4MailCenter@nrc.gov Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov April.Pulvirenti@nrc.gov Attachment 1 to W3F1-2017-0079 Waterford 3 Technical Specification Index and Bases Change List Attachment 1 to W3F1-2017-0079 86 10/20/2016 B 3/4 1-1 B 3/4 1-1a B 3/4 1-3 B 3/4 1-4 B 3/4 1-5 B 3/4 1-5a B 3/4 1-6 B 3/4 2-1a B 3/4 2-2 B 3/4 2-3 B 3/4 2-4 B 3/4 2-5 B 3/4 3-1c B 3/4 3-1d B 3/4 3-1e B 3/4 3-2 B 3/4 3-3 B 3/4 3-3a B 3/4 3-3b B 3/4 3-4 B 3/4 4-1a B 3/4 4-2 B 3/4 4-4c B 3/4 4-4e B 3/4 4-5 B 3/4 4-7a B 3/4 4-10 B 3/4 4-11 B 3/4 5-1a B 3/4 5-1d B 3/4 5-2 B 3/4 5-3 B 3/4 6-1 B 3/4 6-2 B 3/4 6-3 B 3/4 6-4 B 3/4 6-5 B 3/4 6-5a B 3/4 6-6 B 3/4 6-7 B 3/4 7-2e Change No. 86 to TS Bases sections 3/4 1-1 thru 3/4 11-3 was implemented by Licensing Basis Document Change Request (LBDCR) 16-046 to reflect Surveillance Frequency Control Program Attachment 1 to W3F1-2017-0079 T.S. Implementation Bases Date Change No. 86 (Con't) 10/20/2016 87 11/9/2016 Affected TS Topic of Change Bases or Index Pages B 3/4 7-3 Change No. 86 to TS Bases sections B 3/4 7-3c 3/4 1-1 thru 3/4 11-3 was implemented B 3/4 7-3e by Licensing Basis Document Change B 3/4 7-3i Request (LBDCR) 16-046 to reflect B 3/4 7-3j Surveillance Frequency Control B 3/4 7-3j(1) Program. B 3/4 7-4(1) B 3/4 7-4a(5) B 3/4 7-4b B 3/4 7-4d B 3/4 7-8 B 3/4 8-1a1 B 3/4 8-1c B 3/4 8-2 B 3/4 8-2a B 3/4 8-3 B 3/4 9-1 B 3/4 9-1a B 3/4 9-3 B 3/4 9-4 B 3/4 9-5 B 3/4 10-1 B 3/4 11-3 B 3/4 8-1a1 Change No. 87 to TS Bases sections 3/4 8-1a1 was implemented by Licensing Basis Document Change Request (LBDCR) 16-018 reworded to remove the stated minimum gallons for the administrative limit. It will also be reworded to allow the administrative limit to address other conditions/effects impacting usable fuel inventory.
Should you have any questions or comments concerning this submittal, please contact the Regulatory Assurance  
Attachment 1 to W3F1-2017-0079 T.S. Implementation Bases Date Change No. 88 7/10/2017 89 10/24/2017 Affected TS Bases or Index Pages B 3/4 7-4 XVI B 3/4 6-6b B 3/4 7-2e B 3/4 7-3c B 3/4 7-3e B 3/4 7-3f B 3/4 7-3g B 3/4 7-3j Topic of Change Change No. 88 to TS Bases B 3/4 7-4 change the Technical Specification (TS) 3.7.4 action 'c' basis to add amplifying information to clarify that both trains of Dry Cooling Tower (DCT) fans (those under the missile shield) are required to be operable when in a tornado watch. The design basis (reference Cale. MN (Q)-9-17, "Tornado Multiple Missile Protection of Cooling Towe rs") assumes the tornado causes a loss of offsite power and one EDG failure and therefore a failure of one train of the DCT is assumed. Change No. 89 to TS Bases sections was implemented by License Bases Document Change Request (LBDCR) 17-032 removal of 6.5.8 (lnservice Testing Program)}}
: Manager, John Jarrell, at (504) 739-6685.  
( Attachments:  
: 1. Waterford 3 Technical Specification Index and Bases Change List 2. Waterford 3 Technical Specification Index and Bases Revised Pages W3F1-2017-0079 Page 2 cc: Mr. Kriss Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd. Arlington, TX 76011-4125 NRG Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 RidsRgn4MailCenter@nrc.gov Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov April.Pulvirenti@nrc.gov Attachment 1 to W3F1-2017-0079 Waterford 3 Technical Specification Index and Bases Change List Attachment 1 to W3F1-2017-0079 86 10/20/2016 B 3/4 1-1 B 3/4 1-1a B 3/4 1-3 B 3/4 1-4 B 3/4 1-5 B 3/4 1-5a B 3/4 1-6 B 3/4 2-1a B 3/4 2-2 B 3/4 2-3 B 3/4 2-4 B 3/4 2-5 B 3/4 3-1c B 3/4 3-1d B 3/4 3-1e B 3/4 3-2 B 3/4 3-3 B 3/4 3-3a B 3/4 3-3b B 3/4 3-4 B 3/4 4-1a B 3/4 4-2 B 3/4 4-4c B 3/4 4-4e B 3/4 4-5 B 3/4 4-7a B 3/4 4-10 B 3/4 4-11 B 3/4 5-1a B 3/4 5-1d B 3/4 5-2 B 3/4 5-3 B 3/4 6-1 B 3/4 6-2 B 3/4 6-3 B 3/4 6-4 B 3/4 6-5 B 3/4 6-5a B 3/4 6-6 B 3/4 6-7 B 3/4 7-2e Change No. 86 to TS Bases sections 3/4 1-1 thru 3/4 11-3 was implemented by Licensing Basis Document Change Request (LBDCR) 16-046 to reflect Surveillance Frequency Control Program Attachment 1 to W3F1-2017-0079 T.S. Implementation Bases Date Change No. 86 (Con't) 10/20/2016 87 11/9/2016 Affected TS Topic of Change Bases or Index Pages B 3/4 7-3 Change No. 86 to TS Bases sections B 3/4 7-3c 3/4 1-1 thru 3/4 11-3 was implemented B 3/4 7-3e by Licensing Basis Document Change B 3/4 7-3i Request (LBDCR) 16-046 to reflect B 3/4 7-3j Surveillance Frequency Control B 3/4 7-3j(1) Program.
B 3/4 7-4(1) B 3/4 7-4a(5) B 3/4 7-4b B 3/4 7-4d B 3/4 7-8 B 3/4 8-1a1 B 3/4 8-1c B 3/4 8-2 B 3/4 8-2a B 3/4 8-3 B 3/4 9-1 B 3/4 9-1a B 3/4 9-3 B 3/4 9-4 B 3/4 9-5 B 3/4 10-1 B 3/4 11-3 B 3/4 8-1a1 Change No. 87 to TS Bases sections 3/4 8-1a1 was implemented by Licensing Basis Document Change Request (LBDCR) 16-018 reworded to remove the stated minimum gallons for the administrative limit. It will also be reworded to allow the administrative limit to address other conditions/effects impacting usable fuel inventory.
Attachment 1 to W3F1-2017-0079 T.S. Implementation Bases Date Change No. 88 7/10/2017 89 10/24/2017 Affected TS Bases or Index Pages B 3/4 7-4 XVI B 3/4 6-6b B 3/4 7-2e B 3/4 7-3c B 3/4 7-3e B 3/4 7-3f B 3/4 7-3g B 3/4 7-3j Topic of Change Change No. 88 to TS Bases B 3/4 7-4 change the Technical Specification (TS) 3.7.4 action 'c' basis to add amplifying information to clarify that both trains of Dry Cooling Tower (DCT) fans (those under the missile shield) are required to be operable when in a tornado watch. The design basis (reference Cale. MN (Q)-9-17, "Tornado Multiple Missile Protection of Cooling Towe rs") assumes the tornado causes a loss of offsite power and one EDG failure and therefore a failure of one train of the DCT is assumed.
Change No. 89 to TS Bases sections was implemented by License Bases Document Change Request (LBDCR) 17-032 removal of 6.5.8 (lnservice Testing Program)}}

Revision as of 05:56, 6 July 2018

Waterford 3 - Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017
ML17341A651
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/06/2017
From: Jarrell J P
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2017-0079
Download: ML17341A651 (6)


Text

  • *===, Ent W3F1-2017-0079 December 6, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Operations, Inc . 17265 River Road Killona, LA 70057-3093 Tel 504-739-6685 Fax 504-739-6698 jjarrel@entergy

.com John P. Jarrell Regulatory Assurance Manager Waterford 3 10 CFR 50.71(e)

Subject:

Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 through November 30, 2017 Waterford Steam Electric Station, Unit 3 (Waterford

3) Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

Pursuant to Waterford Steam Electric Station Unit 3 (Waterford

3) Technical Specification (TS) 6.16, Entergy Operations, Inc. (EOI) hereby submits an update of all changes made to the Waterford 3 Technical Specification Index and Bases since the last submittal per letter W3F1-2016-0041 (ADAMS Accession No. ML 14309A687), dated June 2, 2016. This update satisfies the submittal frequency required by TS 6.16, which indicates that the submittal will be made at a frequency consistent with 1 O CFR 50. 71 (e) and exemptions thereto. There are no commitments associated with this submittal.

Should you have any questions or comments concerning this submittal, please contact the Regulatory Assurance Manager, John Jarrell, at (504) 739-6685. ( Attachments:

1. Waterford 3 Technical Specification Index and Bases Change List 2. Waterford 3 Technical Specification Index and Bases Revised Pages W3F1-2017-0079 Page 2 cc: Mr. Kriss Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd. Arlington, TX 76011-4125 NRG Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 RidsRgn4MailCenter@nrc.gov Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov April.Pulvirenti@nrc.gov Attachment 1 to W3F1-2017-0079 Waterford 3 Technical Specification Index and Bases Change List Attachment 1 to W3F1-2017-0079 86 10/20/2016 B 3/4 1-1 B 3/4 1-1a B 3/4 1-3 B 3/4 1-4 B 3/4 1-5 B 3/4 1-5a B 3/4 1-6 B 3/4 2-1a B 3/4 2-2 B 3/4 2-3 B 3/4 2-4 B 3/4 2-5 B 3/4 3-1c B 3/4 3-1d B 3/4 3-1e B 3/4 3-2 B 3/4 3-3 B 3/4 3-3a B 3/4 3-3b B 3/4 3-4 B 3/4 4-1a B 3/4 4-2 B 3/4 4-4c B 3/4 4-4e B 3/4 4-5 B 3/4 4-7a B 3/4 4-10 B 3/4 4-11 B 3/4 5-1a B 3/4 5-1d B 3/4 5-2 B 3/4 5-3 B 3/4 6-1 B 3/4 6-2 B 3/4 6-3 B 3/4 6-4 B 3/4 6-5 B 3/4 6-5a B 3/4 6-6 B 3/4 6-7 B 3/4 7-2e Change No. 86 to TS Bases sections 3/4 1-1 thru 3/4 11-3 was implemented by Licensing Basis Document Change Request (LBDCR)16-046 to reflect Surveillance Frequency Control Program Attachment 1 to W3F1-2017-0079 T.S. Implementation Bases Date Change No. 86 (Con't) 10/20/2016 87 11/9/2016 Affected TS Topic of Change Bases or Index Pages B 3/4 7-3 Change No. 86 to TS Bases sections B 3/4 7-3c 3/4 1-1 thru 3/4 11-3 was implemented B 3/4 7-3e by Licensing Basis Document Change B 3/4 7-3i Request (LBDCR)16-046 to reflect B 3/4 7-3j Surveillance Frequency Control B 3/4 7-3j(1) Program. B 3/4 7-4(1) B 3/4 7-4a(5) B 3/4 7-4b B 3/4 7-4d B 3/4 7-8 B 3/4 8-1a1 B 3/4 8-1c B 3/4 8-2 B 3/4 8-2a B 3/4 8-3 B 3/4 9-1 B 3/4 9-1a B 3/4 9-3 B 3/4 9-4 B 3/4 9-5 B 3/4 10-1 B 3/4 11-3 B 3/4 8-1a1 Change No. 87 to TS Bases sections 3/4 8-1a1 was implemented by Licensing Basis Document Change Request (LBDCR)16-018 reworded to remove the stated minimum gallons for the administrative limit. It will also be reworded to allow the administrative limit to address other conditions/effects impacting usable fuel inventory.

Attachment 1 to W3F1-2017-0079 T.S. Implementation Bases Date Change No. 88 7/10/2017 89 10/24/2017 Affected TS Bases or Index Pages B 3/4 7-4 XVI B 3/4 6-6b B 3/4 7-2e B 3/4 7-3c B 3/4 7-3e B 3/4 7-3f B 3/4 7-3g B 3/4 7-3j Topic of Change Change No. 88 to TS Bases B 3/4 7-4 change the Technical Specification (TS) 3.7.4 action 'c' basis to add amplifying information to clarify that both trains of Dry Cooling Tower (DCT) fans (those under the missile shield) are required to be operable when in a tornado watch. The design basis (reference Cale. MN (Q)-9-17, "Tornado Multiple Missile Protection of Cooling Towe rs") assumes the tornado causes a loss of offsite power and one EDG failure and therefore a failure of one train of the DCT is assumed. Change No. 89 to TS Bases sections was implemented by License Bases Document Change Request (LBDCR)17-032 removal of 6.5.8 (lnservice Testing Program)