W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program | 26 July 2023 | Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program | Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program |
ML23032A506 | 1 February 2023 | Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 | Safe Shutdown Boric Acid Shutdown Margin Surveillance Frequency Control Program Operability Assessment |
W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual | 14 October 2021 | Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual | Surveillance Frequency Control Program Fire Protection Program |
ML21279A231 | 6 October 2021 | Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement | Shutdown Margin Packing leak Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 | 18 May 2021 | Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 | Safe Shutdown Missed surveillance Surveillance Frequency Control Program |
W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual | 5 April 2021 | License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual | Internal Flooding Probabilistic Risk Assessment Emergency Lighting Surveillance Frequency Control Program |
W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System | 27 August 2019 | Application for Technical Specification Change to Control Room Air Conditioning System | Surveillance Frequency Control Program |
W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. | 28 February 2018 | Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. | Shutdown Margin Surveillance Frequency Control Program Offsite Circuit |
W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 | 6 December 2017 | Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 | |
W3F1-2017-0080, Submittal of Technical Requirements Manual Update | 6 December 2017 | Submittal of Technical Requirements Manual Update | |
ML17341A651 | 6 December 2017 | Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 | Surveillance Frequency Control Program |
ML15170A126 | 17 June 2015 | Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 | Boric Acid Surveillance Frequency Control Program Offsite Circuit |
ML15170A125 | 17 June 2015 | Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Anticipated operational occurrence Hydrostatic Surveillance Frequency Control Program Pressure Boundary Leakage Grace period Power change Unidentified leakage |
W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part | 17 June 2015 | Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 | Shutdown Margin Pressure Boundary Leakage |
ML15170A123 | 17 June 2015 | Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 | Boric Acid Shutdown Margin Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
ML15170A122 | 17 June 2015 | Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 | Probabilistic Risk Assessment |
W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 | 5 November 2014 | Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 | Shutdown Margin Non-Destructive Examination |
W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years | 28 August 2014 | License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years | Probabilistic Risk Assessment Coatings Large early release frequency Moisture barrier |
W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 | 9 July 2013 | Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 | Safe Shutdown Shutdown Margin Ultimate heat sink Tornado Missile Pressure Boundary Leakage Coast down |
W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 | 9 November 2011 | Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 | Shutdown Margin Ultimate heat sink Grace period Power change |
W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. | 13 October 2011 | License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. | Ultimate heat sink |
W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 | 24 January 2011 | Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 | Fuel cladding |
W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program | 19 January 2011 | Withdrawal of Technical Specification Change Regarding Steam Generator Program | |
W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 | 25 May 2010 | Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 | Safe Shutdown Boric Acid Shutdown Margin Fuel cladding |
W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations | 22 February 2010 | . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations | Shutdown Margin Grab sample |
W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 | 9 July 2009 | Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 | Safe Shutdown Boric Acid Ultimate heat sink |
W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 | 8 January 2009 | Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 | |
W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 | 11 November 2008 | Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 | Safe Shutdown Shutdown Margin |
W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration | 17 September 2008 | Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration | Boric Acid |
W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 | 20 February 2008 | Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 | |
W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves. | 2 January 2008 | License Amendment Request NPF-38-275, Containment Isolation Valves. | |
W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 | 13 June 2007 | Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 | Non-Destructive Examination Grab sample Stroke time Annual Radioactive Effluent Release Report |
W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 | 18 July 2006 | Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 | |
W3F1-2004-0090, Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/04 | 7 October 2004 | Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/04 | Grab sample Hydrostatic Pressure Boundary Leakage |
W3F1-2004-0016, Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 2004 | 26 February 2004 | Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 2004 | |
W3F1-2003-0055, TS Bases Update to NRC for Period April 8, 2003 Through July 23, 2003 | 24 July 2003 | TS Bases Update to NRC for Period April 8, 2003 Through July 23, 2003 | Boric Acid Shutdown Margin Missed surveillance Grace period |
W3F1-2003-0002, Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 2003 | 15 January 2003 | Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 2003 | Hydrostatic |
W3F1-2002-0090, Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 2002 | 14 October 2002 | Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 2002 | Anticipated operational occurrence Hydrostatic Fuel cladding |
W3F1-2002-0012, Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.2 | 31 January 2002 | Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.2 | Anticipated operational occurrence Fuel cladding |
W3F1-2002-0005, Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 2002 | 16 January 2002 | Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 2002 | Ultimate heat sink Grace period Power change |
ML18053A697 | 8 May 1991 | License Amendment Request Technical Specification Change Request NPF-38-114 | Offsite Circuit |