{{#Wiki_filter:LICENSEE: Energy Northwest FACILITY: Columbia Generating Station SUBJECT: SUMMARY OF FEBRUARY 24, 2015, MEETING WITH ENERGY NORTHWEST REGARDING A PLANNED RELIEF REQUEST FOR THE REACTOR WATER CLEANUP SYSTEM (TAG NO. MF5679) On February 24, 2015, a Category 1 public meeting was held with the U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest (the licensee). The purpose of the public meeting was for Energy Northwest to present a planned relief request submittal for the Reactor Water Cleanup (RWCU) System at Columbia Generating Station. The meeting notice and agenda is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 15054A022. A list of attendees is provided as Enclosure 1. Energy Northwest presented its planned relief request (slides and figures,_presented are available at ADAMS Accession No. ML 15054A473), which would request relief for certain components in the non-safety related portions of the RWCU system, which do not conform to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) design requirements, on the basis that they perform with an acceptable level of quality and safety. The licensee presented an overview of the system, the history of the ASME classification of the system, recent enforcement actions regarding the reclassification of the system by Energy Northwest, and the planned request for relief for a total of 41 RWCU system components, which do not currently meet ASME Code, Section Ill, Class 3 design requirements. The NRC staff expressed concern over the proposed path forward from the licensee, specifically whether pursuing a relief request is the correct course of action for this situation. The NRC staff noted that in July 2013, the licensee had received a Severity Level IV no.n-cited violation of Title 10 of the Code of Federal Regulations ( 10 CFR) Section 50. 59, "Changes, tests, and experiments," because the licensee failed to obtain a license amendment, pursuant to 10 CFR 50.90, prior to reclassifying the system in 1995 from ASME Code, Section Ill, Class 3, to Quality Group D (American National Standards Institute (ANSI) Standard ANSI B31.1 ). The NRC staff noted that it would need more information and additional time to consider the appropriate course of action for the licensee to pursue. The NRC staff also noted that the Office of Nuclear Reactor Regulation does not normally approve requests for relief from ASME Code, Section Ill, as this section contains the rules for the design and construction of nuclear power plant facility components, and Columbia Generating Station is an operating plant, which has already been constructed, and is not building a new system.
{{#Wiki_filter:LICENSEE: Energy Northwest FACILITY: Columbia Generating Station  
-2 -Energy Northwest stated that it understood the NRC staff's questions and concerns and needed to discuss internally to decide how best to proceed with a licensing action to correct the July 2013 non-cited violation regarding the RWCU system. Please direct any inquiries to me at 301-415-1081 or Andrea.George@nrc.gov. Docket No. 50-397 Enclosure: List of Attendees cc w/encl: Distribution via Listserv Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES FEBRUARY 24. 2015. MEETING WITH ENERGY NORTHWEST PLANNED RELIEF REQUEST FOR COLUMBIA GENERATING STATION REGARDING RECLASSIFICATION OF REACTOR WATER CLEANUP SYSTEM NRC.Staff Andrea George, Project Manager, D_ivision of Operating Reactor Licensing (DORL), NRR Eric Oesterle, Acting Branch Chief, DORL, NRR Robert Hsu, NRR Keith Hoffman, NRR Devender Reddy, NRR Evan Davidson, NRR Greg Casto, NRR Tim Lupold, NRR Energy Northwest Staff Lisa Williams, Licensing Dave Kettering, Design Engineering John LaSalle, Code Programs Engineering Doug Scott, Design Engineering Rick Garcia, Licensing Steve Kartchner*, Systems Engineering James Derwin*, Systems Engineering Ruth Thomas* *Joined via conference bridge Enclosure
 
-2 -Energy Northwest stated that it understood the NRC staff's questions and concerns and needed to discuss internally to decide how best to proceed with a licensing action to correct the
==SUBJECT:==
* July 2013 non-cited violation regarding the RWCU system. Please direct any inquiries to me at 301-415-1081 or Andrea.George@nrc.gov. Docket No. 50-397 Enclosure: List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEmcb Resource RidsNrrDeEpnb Resource RidsNrrDorllpl4-1 Resource RidsNrrDssSbpb Resource RidsNrrDssSrxb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsRgn4MailCenter Resource MWaters, EDO RIV DReddy, NRR/DSS/SRXB EDavidson, NRR/DSS/SBPB KHoffman, NRR/DE/EPNB KHsu, NRR/DE/EMCB JGroom, RIV DBradley, RIV IRA Carl F. Lyon for/ Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ADAMS A ccess1on N M N f ML 15054A022 Mt S os.: tq 01ce , tq ummary ML 15069A516 L' ' 1censee Sl'd ML 15044A473 1 es OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /LA NRR/DORL/LPL4-1/BC NRR/DORL/LPL4-1 /PM NAME AGeorge JBurkhardt MMarkley AGeorge( CFLyon for) DATE 3/11/15 3/11/15 3/17/15 3/17/15 OFFICIAL RECORD COPY   
SUMMARY OF FEBRUARY 24, 2015, MEETING WITH ENERGY NORTHWEST REGARDING A PLANNED RELIEF REQUEST FOR THE REACTOR WATER CLEANUP SYSTEM (TAG NO. MF5679) On February 24, 2015, a Category 1 public meeting was held with the U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest (the licensee). The purpose of the public meeting was for Energy Northwest to present a planned relief request submittal for the Reactor Water Cleanup (RWCU) System at Columbia Generating Station. The meeting notice and agenda is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 15054A022. A list of attendees is provided as Enclosure 1. Energy Northwest presented its planned relief request (slides and figures,_presented are available at ADAMS Accession No. ML 15054A473), which would request relief for certain components in the non-safety related portions of the RWCU system, which do not conform to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) design requirements, on the basis that they perform with an acceptable level of quality and safety. The licensee presented an overview of the system, the history of the ASME classification of the system, recent enforcement actions regarding the reclassification of the system by Energy Northwest, and the planned request for relief for a total of 41 RWCU system components, which do not currently meet ASME Code, Section Ill, Class 3 design requirements. The NRC staff expressed concern over the proposed path forward from the licensee, specifically whether pursuing a relief request is the correct course of action for this situation. The NRC staff noted that in July 2013, the licensee had received a Severity Level IV no.n-cited violation of Title 10 of the Code of Federal Regulations ( 10 CFR) Section 50. 59, "Changes, tests, and experiments," because the licensee failed to obtain a license amendment, pursuant to 10 CFR 50.90, prior to reclassifying the system in 1995 from ASME Code, Section Ill, Class 3, to Quality Group D (American National Standards Institute (ANSI) Standard ANSI B31.1 ). The NRC staff noted that it would need more information and additional time to consider the appropriate course of action for the licensee to pursue. The NRC staff also noted that the Office of Nuclear Reactor Regulation does not normally approve requests for relief from ASME Code, Section Ill, as this section contains the rules for the design and construction of nuclear power plant facility components, and Columbia Generating Station is an operating plant, which has already been constructed, and is not building a new system.
Energy Northwest stated that it understood the NRC staff's questions and concerns and needed to discuss internally to decide how best to proceed with a licensing action to correct the July 2013 non-cited violation regarding the RWCU system. Please direct any inquiries to me at 301-415-1081 or Andrea.George@nrc.gov. Docket No. 50-397  
 
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES FEBRUARY 24. 2015. MEETING WITH ENERGY NORTHWEST PLANNED RELIEF REQUEST FOR COLUMBIA GENERATING STATION REGARDING RECLASSIFICATION OF REACTOR WATER CLEANUP SYSTEM NRC.Staff Andrea George, Project Manager, D_ivision of Operating Reactor Licensing (DORL), NRR Eric Oesterle, Acting Branch Chief, DORL, NRR Robert Hsu, NRR Keith Hoffman, NRR Devender Reddy, NRR Evan Davidson, NRR Greg Casto, NRR Tim Lupold, NRR Energy Northwest Staff Lisa Williams, Licensing Dave Kettering, Design Engineering John LaSalle, Code Programs Engineering Doug Scott, Design Engineering Rick Garcia, Licensing Steve Kartchner*, Systems Engineering James Derwin*, Systems Engineering Ruth Thomas* *Joined via conference bridge Enclosure Energy Northwest stated that it understood the NRC staff's questions and concerns and needed to discuss internally to decide how best to proceed with a licensing action to correct the
* July 2013 non-cited violation regarding the RWCU system. Please direct any inquiries to me at 301-415-1081 or Andrea.George@nrc.gov. Docket No. 50-397  
 
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEmcb Resource RidsNrrDeEpnb Resource RidsNrrDorllpl4-1 Resource RidsNrrDssSbpb Resource RidsNrrDssSrxb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsRgn4MailCenter Resource MWaters, EDO RIV DReddy, NRR/DSS/SRXB EDavidson, NRR/DSS/SBPB KHoffman, NRR/DE/EPNB KHsu, NRR/DE/EMCB JGroom, RIV DBradley, RIV IRA Carl F. Lyon for/ Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ADAMS A ccess1on N M N f ML 15054A022 Mt S os.: tq 01ce , tq ummary ML 15069A516 L' ' 1censee Sl'd ML 15044A473 1 es OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /LA NRR/DORL/LPL4-1/BC NRR/DORL/LPL4-1 /PM NAME AGeorge JBurkhardt MMarkley AGeorge( CFLyon for) DATE 3/11/15 3/11/15 3/17/15 3/17/15 OFFICIAL RECORD COPY   
}}
}}

Revision as of 06:58, 5 April 2018

2/24/2014 Summary of Presubmittal Meeting with Energy Northwest to Discuss Relief Request for Radwaste Cleanup Piping for Columbia Generating Station (TAC No. MF5679)
ML15069A516
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/17/2015
From: George A E
Plant Licensing Branch IV
To: Reddemann M E
Energy Northwest
George A E
References
TAC MF5679
Download: ML15069A516 (4)


Text

LICENSEE: Energy Northwest FACILITY: Columbia Generating Station

SUBJECT:

SUMMARY OF FEBRUARY 24, 2015, MEETING WITH ENERGY NORTHWEST REGARDING A PLANNED RELIEF REQUEST FOR THE REACTOR WATER CLEANUP SYSTEM (TAG NO. MF5679) On February 24, 2015, a Category 1 public meeting was held with the U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest (the licensee). The purpose of the public meeting was for Energy Northwest to present a planned relief request submittal for the Reactor Water Cleanup (RWCU) System at Columbia Generating Station. The meeting notice and agenda is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 15054A022. A list of attendees is provided as Enclosure 1. Energy Northwest presented its planned relief request (slides and figures,_presented are available at ADAMS Accession No. ML 15054A473), which would request relief for certain components in the non-safety related portions of the RWCU system, which do not conform to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) design requirements, on the basis that they perform with an acceptable level of quality and safety. The licensee presented an overview of the system, the history of the ASME classification of the system, recent enforcement actions regarding the reclassification of the system by Energy Northwest, and the planned request for relief for a total of 41 RWCU system components, which do not currently meet ASME Code, Section Ill, Class 3 design requirements. The NRC staff expressed concern over the proposed path forward from the licensee, specifically whether pursuing a relief request is the correct course of action for this situation. The NRC staff noted that in July 2013, the licensee had received a Severity Level IV no.n-cited violation of Title 10 of the Code of Federal Regulations ( 10 CFR) Section 50. 59, "Changes, tests, and experiments," because the licensee failed to obtain a license amendment, pursuant to 10 CFR 50.90, prior to reclassifying the system in 1995 from ASME Code, Section Ill, Class 3, to Quality Group D (American National Standards Institute (ANSI) Standard ANSI B31.1 ). The NRC staff noted that it would need more information and additional time to consider the appropriate course of action for the licensee to pursue. The NRC staff also noted that the Office of Nuclear Reactor Regulation does not normally approve requests for relief from ASME Code, Section Ill, as this section contains the rules for the design and construction of nuclear power plant facility components, and Columbia Generating Station is an operating plant, which has already been constructed, and is not building a new system.

Energy Northwest stated that it understood the NRC staff's questions and concerns and needed to discuss internally to decide how best to proceed with a licensing action to correct the July 2013 non-cited violation regarding the RWCU system. Please direct any inquiries to me at 301-415-1081 or Andrea.George@nrc.gov. Docket No. 50-397

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES FEBRUARY 24. 2015. MEETING WITH ENERGY NORTHWEST PLANNED RELIEF REQUEST FOR COLUMBIA GENERATING STATION REGARDING RECLASSIFICATION OF REACTOR WATER CLEANUP SYSTEM NRC.Staff Andrea George, Project Manager, D_ivision of Operating Reactor Licensing (DORL), NRR Eric Oesterle, Acting Branch Chief, DORL, NRR Robert Hsu, NRR Keith Hoffman, NRR Devender Reddy, NRR Evan Davidson, NRR Greg Casto, NRR Tim Lupold, NRR Energy Northwest Staff Lisa Williams, Licensing Dave Kettering, Design Engineering John LaSalle, Code Programs Engineering Doug Scott, Design Engineering Rick Garcia, Licensing Steve Kartchner*, Systems Engineering James Derwin*, Systems Engineering Ruth Thomas* *Joined via conference bridge Enclosure Energy Northwest stated that it understood the NRC staff's questions and concerns and needed to discuss internally to decide how best to proceed with a licensing action to correct the

  • July 2013 non-cited violation regarding the RWCU system. Please direct any inquiries to me at 301-415-1081 or Andrea.George@nrc.gov. Docket No. 50-397

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEmcb Resource RidsNrrDeEpnb Resource RidsNrrDorllpl4-1 Resource RidsNrrDssSbpb Resource RidsNrrDssSrxb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsRgn4MailCenter Resource MWaters, EDO RIV DReddy, NRR/DSS/SRXB EDavidson, NRR/DSS/SBPB KHoffman, NRR/DE/EPNB KHsu, NRR/DE/EMCB JGroom, RIV DBradley, RIV IRA Carl F. Lyon for/ Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ADAMS A ccess1on N M N f ML 15054A022 Mt S os.: tq 01ce , tq ummary ML 15069A516 L' ' 1censee Sl'd ML 15044A473 1 es OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /LA NRR/DORL/LPL4-1/BC NRR/DORL/LPL4-1 /PM NAME AGeorge JBurkhardt MMarkley AGeorge( CFLyon for) DATE 3/11/15 3/11/15 3/17/15 3/17/15 OFFICIAL RECORD COPY