: 3. LICEllSED TilERMAL POWER (MWT): 15.18.                                  .                                                            .
: 3. LICEllSED TilERMAL POWER (MWT): 15.18.                                  .                                                            .
: 4. IJAMEPLATE RAIING (GEOSS MWE):                          523.8          .                                                            .
: 4. IJAMEPLATE RAIING (GEOSS MWE):                          523.8          .                                                            .
.
: 5. DESIGN ELI.CTRICAL RATING (NET MWE): 497.                              .                                                            .
: 5. DESIGN ELI.CTRICAL RATING (NET MWE): 497.                              .                                                            .
: 6. MAXINUll DEPl.NDADLE CAPACITY (GROS 5 MWE): 519.                        .                                                            .
: 6. MAXINUll DEPl.NDADLE CAPACITY (GROS 5 MWE): 519.                        .                                                            .
Line 48: Line 47:
O                          25. IF SilUTD0hN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                                MARCII 21, 1980 W
O                          25. IF SilUTD0hN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                                MARCII 21, 1980 W
P DATA REPORTED AND FACTORS CALCULATED AS FEOULSTtD Ill 1.RC LETTEl< DATED SLPTEMCEh 2de 197i
P DATA REPORTED AND FACTORS CALCULATED AS FEOULSTtD Ill 1.RC LETTEl< DATED SLPTEMCEh 2de 197i
                                                                                                                                            .
* _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - - - _ _ _ _ _ _ _ _ _ _                      _  _    _ . - _ _ _ _ _ _ _ _ _ _ _ _


___ ___.
8 OPERATIl1G DATA REP 0hT DOCKET NO. 50-301 DATE March 6, 1980 COMPLETLD DY        C. h. FAY                    ,
                                                                                                                                                          '
8
                                                                                                                                                            .
* OPERATIl1G DATA REP 0hT DOCKET NO. 50-301 DATE March 6, 1980 COMPLETLD DY        C. h. FAY                    ,
                                                                                                                                      .
TELLPil0NE      414 277 2811 OPERATItJG STAlUS
TELLPil0NE      414 277 2811 OPERATItJG STAlUS
                                                                            . . . . . . . . . . . . . . . . . . . . . . . .
: 1. UtJIT NAME:      POINT DEACil NUCLEAR FLANT      UNIT 2      . NOTES                                                                      .
: 1. UtJIT NAME:      POINT DEACil NUCLEAR FLANT      UNIT 2      . NOTES                                                                      .
: 2. REPORTING PERIOD: FEDRUARY 1980                              .                                                                            .
: 2. REPORTING PERIOD: FEDRUARY 1980                              .                                                                            .
Line 69: Line 60:
t10T API'LICADLE
t10T API'LICADLE
: 9. POWER LEVLL To hillCil RESTRICTEDe IF ANY (14ET MWE): NOT API'LICADLE
: 9. POWER LEVLL To hillCil RESTRICTEDe IF ANY (14ET MWE): NOT API'LICADLE
: 10. REASONS FOR !<ESTRICTIONS, (IF Al4Y):        NOT API'LICADLE
: 10. REASONS FOR !<ESTRICTIONS, (IF Al4Y):        NOT API'LICADLE TilIS Mol1Til            YR TO DATE                CUMULATIVE
              '
TilIS Mol1Til            YR TO DATE                CUMULATIVE
: 11. Il0URS It1 REPORTIt4G PERIOD                                        696                  le440                  6be457
: 11. Il0URS It1 REPORTIt4G PERIOD                                        696                  le440                  6be457
: 12. NUMDER OF fl0URS REACTOR WAS CRITICAL                              650.4                1,394.4                60e291.3
: 12. NUMDER OF fl0URS REACTOR WAS CRITICAL                              650.4                1,394.4                60e291.3
Line 86: Line 75:
: 23. UtJIT FORCED OUTAGE RATE                                              66                      3.2                        1.5
: 23. UtJIT FORCED OUTAGE RATE                                              66                      3.2                        1.5
: 24. SilUTDohNS SCilEDULED OVER NEXT 6 MONTil5 (TYPEe DATEe AtJD DURATION OF EACll)i Refueling shutdown scheduled for April 11, 1980, to last approximately five weeks.
: 24. SilUTDohNS SCilEDULED OVER NEXT 6 MONTil5 (TYPEe DATEe AtJD DURATION OF EACll)i Refueling shutdown scheduled for April 11, 1980, to last approximately five weeks.
                                                                                          .
: 25. IF SliUTDOWN AT EtJD OF REPORT FERIODe ESTIMATED DATE OF STARTUP:                  MARCil 13, 1980 DATA REPORTED Atib FACTORS CALCUl. ATED AS RE0 VESTED Ill WhC LETTER DATED SEPTEMDER 23e 197/
: 25. IF SliUTDOWN AT EtJD OF REPORT FERIODe ESTIMATED DATE OF STARTUP:                  MARCil 13, 1980 DATA REPORTED Atib FACTORS CALCUl. ATED AS RE0 VESTED Ill WhC LETTER DATED SEPTEMDER 23e 197/
                                                                                                                              .
_ _ _ - _ _ _ _


_ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
UNIT SIlUTDOWNS AND POWER REDUCTIONS                  DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 REPORT MONTH    February, 1980                                        Fay COMPLETED          1 TELEPHONE    414/277-2811 m
                                                                                                                                                                            .
* UNIT SIlUTDOWNS AND POWER REDUCTIONS                  DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 REPORT MONTH    February, 1980                                        Fay COMPLETED          1 TELEPHONE    414/277-2811 m
h c          W tD O                            #
h c          W tD O                            #
o-  N      Oc4                      Ev      c e  Y0      $    cYe                      0$      Um No.        Date      g  gg    g    jgg      Licensee Event  gg      g'g    Cause and Corrective Action
o-  N      Oc4                      Ev      c e  Y0      $    cYe                      0$      Um No.        Date      g  gg    g    jgg      Licensee Event  gg      g'g    Cause and Corrective Action s  am    e    v ;c        Report No. m      ao        To Prevent Recurrence Qw    (4  0 U3 c                            O X:    3                          U O                                        _
'
s  am    e    v ;c        Report No. m      ao        To Prevent Recurrence Qw    (4  0 U3 c                            O X:    3                          U O                                        _
1  800228    S    24.3  D      1                      CB  itTEXCI    The unit was taken of f line in accordance with an NRC Confirmator    r Order of November 30, 1979 which
1  800228    S    24.3  D      1                      CB  itTEXCI    The unit was taken of f line in accordance with an NRC Confirmator    r Order of November 30, 1979 which
                                                                                               ~
                                                                                               ~
Line 103: Line 85:
1                                                                  3 F: Forced          Reason:                                      Method:                  Exhibit G-Instruc-S: Scheduled      A-  Equipment Failure (explain)              l- Manual                tions for Prepar-B- Maintenance or Test                      2- Manual Scram          ation of Data Entry C-  Refueling                                3- Automatic Scram      Sheets for LER File D- Regulatory Restriction                    4- Other (explain)        (NUREG-0161)
1                                                                  3 F: Forced          Reason:                                      Method:                  Exhibit G-Instruc-S: Scheduled      A-  Equipment Failure (explain)              l- Manual                tions for Prepar-B- Maintenance or Test                      2- Manual Scram          ation of Data Entry C-  Refueling                                3- Automatic Scram      Sheets for LER File D- Regulatory Restriction                    4- Other (explain)        (NUREG-0161)
E- Operator Training & License Exam F- Administrative                                                  5 Exhibit I- Same AD-28B                                                          G- Operational Error (explain)                                        Source (01-78)                                                  11- Other (explain)                                                      .
E- Operator Training & License Exam F- Administrative                                                  5 Exhibit I- Same AD-28B                                                          G- Operational Error (explain)                                        Source (01-78)                                                  11- Other (explain)                                                      .
_ _ _                                                        -


  - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                . _ . _ _ _                                __. .
UNIT SHUTDOWNS AND POWER REDUCTIONS                    DOCKET NO. 50-301 UNIT NAME Point Heach IInit 2 REPORT MONTH    February, 1980 COMPLETED B        . av TELEPHONE      414/277-2811
                                                                                                                                                                .
* UNIT SHUTDOWNS AND POWER REDUCTIONS                    DOCKET NO. 50-301 UNIT NAME Point Heach IInit 2 REPORT MONTH    February, 1980 COMPLETED B        . av TELEPHONE      414/277-2811
                                                                         ~
                                                                         ~
m c          w mo                                u
m c          w mo                                u e
                                                      -
e
                                                             .S a au "co  eoe
                                                             .S a au "co  eoe
                                                                               .S t                  Pe am So ce No. Date      g      gd    g  jgg      Licensee Event  gg        g]      Cause and Corrective Action 8      om    o  ee          Report No. m        EU          To Prevent Recurrence a ~-    %                                      o Eo  m >c                            U
                                                                               .S t                  Pe am So ce No. Date      g      gd    g  jgg      Licensee Event  gg        g]      Cause and Corrective Action 8      om    o  ee          Report No. m        EU          To Prevent Recurrence a ~-    %                                      o Eo  m >c                            U 8
                                                                                                                                                                    -
1  800228    F    45.6      A      1    80-002/OlT-0    CB    llT E X CI  An orderly shutdown      of the unit was comple ted at 0224 hours on February 28, 1980, following con-firmation of primary-to-secondary leakage of 1,420 gallons per day in the "A" steam generator.        A static head leak check identified the defective tube and subsequent eddy current inspection placed the de fect at 10" above the tube end on the hot leg side. Following completion of eddy current inspec-tion, the leaking tube and any other defective tubes will be i                                                                                                                      plugged and a hydrostatic test pe r formed .
8 1  800228    F    45.6      A      1    80-002/OlT-0    CB    llT E X CI  An orderly shutdown      of the unit was comple ted at 0224 hours on February 28, 1980, following con-firmation of primary-to-secondary leakage of 1,420 gallons per day in the "A" steam generator.        A static head leak check identified the defective tube and subsequent eddy current inspection placed the de fect at 10" above the tube end on the hot leg side. Following completion of eddy current inspec-tion, the leaking tube and any other defective tubes will be i                                                                                                                      plugged and a hydrostatic test pe r formed .
l l                                          1 l                                              F: Forced              Reason:                                                                4 Method:                  Exhibit G-Instruc-S: Scheduled          A- Equipment Failure (explain)                  l- Manual                tions for Prepar-B- Maintenance or Test                          2- Manual Scram          ation of Data Entry C- Refueling                                    3- Automatic Scram        Sheets for LER File D- Regulatory Restriction                      4- Other (explain)        (NUREG-0161)
l l                                          1 l                                              F: Forced              Reason:                                                                4
!
Method:                  Exhibit G-Instruc-S: Scheduled          A- Equipment Failure (explain)                  l- Manual                tions for Prepar-B- Maintenance or Test                          2- Manual Scram          ation of Data Entry C- Refueling                                    3- Automatic Scram        Sheets for LER File D- Regulatory Restriction                      4- Other (explain)        (NUREG-0161)
E- Operator Training & License Exam F- Administrative                                                      5 AD-28B                                                                                                                          Exhibit I- Same G-  Operational Error (explain)                                            Source (01-78)                                          H- Other (explain)                                                          .
E- Operator Training & License Exam F- Administrative                                                      5 AD-28B                                                                                                                          Exhibit I- Same G-  Operational Error (explain)                                            Source (01-78)                                          H- Other (explain)                                                          .


__ _ _ _ - _ _ _ . . - _ _
DOCKET NO.      50-266 UNIT NAME      Point Beach Unit 1 DATE            March 6,  1980 COMPLETED BY C. W. Fay TELEPHONE      414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH    February, 1980 AVERAGE                    AVERAGE                              AVERAGE DAILY                      DAILY                                DAILY POWER LEVEL              POWER LEVEL                          POWER LEVEL DAY  MWe NET        DAY        MWe NET                DAY          MWe NET 1      371          11          372                  21              373 2      370          12          374                  22              378 3      367          13          377                  23              378 4      368          14          378                  24              376 5      371          15          375                  25              374 6      368          16          371                  26              374 7      367          17          376                  27              369 8      370          18          373                  28              342 9      371          19          369                  29            - 13 10      374          2            370                    30            ---
'
                                                                                                                    .
DOCKET NO.      50-266
                                                                                          .                          .
UNIT NAME      Point Beach Unit 1 DATE            March 6,  1980 COMPLETED BY C. W. Fay TELEPHONE      414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH    February, 1980 AVERAGE                    AVERAGE                              AVERAGE DAILY                      DAILY                                DAILY POWER LEVEL              POWER LEVEL                          POWER LEVEL DAY  MWe NET        DAY        MWe NET                DAY          MWe NET 1      371          11          372                  21              373 2      370          12          374                  22              378 3      367          13          377                  23              378 4      368          14          378                  24              376 5      371          15          375                  25              374 6      368          16          371                  26              374 7      367          17          376                  27              369 8      370          18          373                  28              342 9      371          19          369                  29            - 13 10      374          2            370                    30            ---
1 31            ---
1 31            ---
AD-28A (1-77)                                                                            ,
AD-28A (1-77)                                                                            ,
                                                                                                      .


_ - _ _ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ _ _
DOCKET NO.                50-301 UNIT NAME                Point Beach Unit 2 DATE                    March 6,                                                          1980 COMPLETED BY C. W. Fay TELEPHONE.                414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH    February, 1980 AVERAGE                    AVERAGE                                                                                              AVERAGE DAILY                      DAILY                                                                                                DAILY POWER LEVEL              POWER LEVEL                                                                                          POWER LEVEL DAY          MWe NET        DAY        MWe NET              DAY                                                                            MWe NET 1    469          11          475                  21                                                                                476 2    471          12          479                  22                                                                                483 3    469          13          481                  23                                                                                483 4    471          14          483                  24                                                                                483 5    475          15          478                  25                                                                                475 6    469          16          472                  26                                                                                473 7    470          17          479                  27                                                                                468 8    474          18          479                  28                                                                                    10 9    4 74          19          480                  29                                                                              -
                                                                                                                                                                                                                                  .
DOCKET NO.                50-301
                                                                                                                                                                                                                                    .
UNIT NAME                Point Beach Unit 2
                                                                                                                                                                                                                                          -
DATE                    March 6,                                                          1980 COMPLETED BY C. W. Fay TELEPHONE.                414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH    February, 1980 AVERAGE                    AVERAGE                                                                                              AVERAGE DAILY                      DAILY                                                                                                DAILY POWER LEVEL              POWER LEVEL                                                                                          POWER LEVEL DAY          MWe NET        DAY        MWe NET              DAY                                                                            MWe NET 1    469          11          475                  21                                                                                476 2    471          12          479                  22                                                                                483 3    469          13          481                  23                                                                                483 4    471          14          483                  24                                                                                483 5    475          15          478                  25                                                                                475 6    469          16          472                  26                                                                                473 7    470          17          479                  27                                                                                468 8    474          18          479                  28                                                                                    10 9    4 74          19          480                  29                                                                              -
7 10              456          2A          482                  30                                                                                ---
7 10              456          2A          482                  30                                                                                ---
31                                                                                ---
31                                                                                ---
Line 143: Line 105:
- - - - - - - - - - - _ _ - _ _                                                                _                                __        _ _ _ - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _                __---_s
- - - - - - - - - - - _ _ - _ _                                                                _                                __        _ _ _ - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _                __---_s


i
i NARRATIVE  
  .
NARRATIVE  


==SUMMARY==
==SUMMARY==
Line 159: Line 119:
Reracking of the south spent fuel pit is in progress and the old racks are currently being crated and shipped off site.
Reracking of the south spent fuel pit is in progress and the old racks are currently being crated and shipped off site.
The 3D diesel generator governor was replaced during the period.
The 3D diesel generator governor was replaced during the period.
:
l l
l l
:
I
I


        -
      .
Construction of on-site radioactive waste temporary storage vaults located just behind the Unit 1 facade has been    ,
Construction of on-site radioactive waste temporary storage vaults located just behind the Unit 1 facade has been    ,
completed except for cleanup and minor finishing work.
completed except for cleanup and minor finishing work.
Work continues on IE Bulletin Nos. 79-02, anchor bolt inspection, and 79-14, seismic analysis for as-built safety related piping systems.
Work continues on IE Bulletin Nos. 79-02, anchor bolt inspection, and 79-14, seismic analysis for as-built safety related piping systems.
No other major safety-related maintenance was performed during the period.
No other major safety-related maintenance was performed during the period.
.
i l
i
l
    -
l l
: 7. .
: 7. .
   ~
   ~
I                -    -                - - -              . ..
I                -    -                - - -              . ..


    -
  .
NARRATIVE  
NARRATIVE  


Line 188: Line 140:
The unit has been operating at a slightly reduced efficiency because of increased circulating water temperatures caused by ice melt operation; also, the unit has been operating in the core stretch mode since 2150 hours on February 20, 1980.
The unit has been operating at a slightly reduced efficiency because of increased circulating water temperatures caused by ice melt operation; also, the unit has been operating in the core stretch mode since 2150 hours on February 20, 1980.
Licensee Event Report No. 80-001/0lT was filed regarding the loss of power range channel redundancy. At 1831 hours on February 21, 1980 a momentary loss of the red instrument bus
Licensee Event Report No. 80-001/0lT was filed regarding the loss of power range channel redundancy. At 1831 hours on February 21, 1980 a momentary loss of the red instrument bus
!    generated a negative spike which caused power range Channel N41 to fail low. Failure of the power range channel resulted in a loss of redundancy until the bistable was placed in the tripped mode eleven minutes later, in accordance with ICP 10.2. The
!    generated a negative spike which caused power range Channel N41 to fail low. Failure of the power range channel resulted in a loss of redundancy until the bistable was placed in the tripped mode eleven minutes later, in accordance with ICP 10.2. The negative power spike was caused by a faulty capacitor in the 2DY01 power supply. The Channel N41 fuses were replaced, the            ,
,
red instrument bus shifted to the alternate power supply and all bistables returned to normal at 1858 hours on February 21, 1980.
!
l    The faulty capacitor was replaced the following day and the red instrument bus was returned to the normal power supply at that time.
negative power spike was caused by a faulty capacitor in the 2DY01 power supply. The Channel N41 fuses were replaced, the            ,
red instrument bus shifted to the alternate power supply and all
!
bistables returned to normal at 1858 hours on February 21, 1980.
l    The faulty capacitor was replaced the following day and the red
'
instrument bus was returned to the normal power supply at that time.
!
                                                                                                          ,_ _  .


                                                                                      ._--
_2-Work continues on IE Bulletin Nos. 79-02, anchor bolt inspection,.and 79-14, seismic analysis for as-built hafety
  . . . . . ..
_2-Work continues on IE Bulletin Nos. 79-02, anchor bolt
.
inspection,.and 79-14, seismic analysis for as-built hafety
* related piping systems.
* related piping systems.
,
No other major safety-related maintenance was performed during.the' period.
No other major safety-related maintenance was performed
1 1
:
4 i
during.the' period.
s t
1
4 y
.
1 1
1 4
i
i s
t 4
y 1
1 i
,
                                                                                              -
                                                       ,          -.          ,      .}}
                                                       ,          -.          ,      .}}

Latest revision as of 14:02, 1 February 2020

Monthly Operating Repts for Feb 1980
ML19305A886
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML19305A883 List:
References
NUDOCS 8003180542
Download: ML19305A886 (10)


Text

V(~b

~

OPERATING DATA REP 0hT DOCKET No. 50-266 DATE March 6, 1980 COMPLETED DY C. W. FAY

/ TELEPN011E 414 277 2811 OPERATIt4G STAlOS

. . . . . . . . . . . . . . . . . .~. .. . .

1. UNIT NAME: POINT GEACil (JUCLEAR PLAl4T UI IT 1 . Il0TES .
2. REPORTING PEDIOD: FEDRUARY 1980 . .
3. LICEllSED TilERMAL POWER (MWT): 15.18. . .
4. IJAMEPLATE RAIING (GEOSS MWE): 523.8 . .
5. DESIGN ELI.CTRICAL RATING (NET MWE): 497. . .
6. MAXINUll DEPl.NDADLE CAPACITY (GROS 5 MWE): 519. . .
7. MAXINUll DEPLt3DADLE CAPACITY (NET MhE): 495. . . . . . . . . . . . . . . . . . . . . .. . .
8. IF CilANGES OCLUR IN CAPACITY RATINGS (ITEMS NUMCEl< 3 TilFOUGil 7) SItlCE LAST REPORTe GIVE REASONS:

110T APiLICADLE

9. POWER Li'VI.L TO WilICll RESTRICTEDe IF ANY (liET MhE): 390.0
10. REASONS FOR l<ESTRICTIONSe (IF Al4Y): 1MEXA3XXEGIGOBS Power restriction is the result of a self-imposed reduction in core average temperature in an attempt to inhibit corrosion of steam geherator tubes within the tubesheet crevice. TilIS M0llTil YR TO DATE COMiiLATIVE It. Il0URS ItJ REPORTItJG PERIOD 696 1,440 81,672
12. NUMDER OF ll0URS REACTOR WAS CRITICAL 685.7 1,429.7 67e946.2
13. REACTOR l>ESERVE SilUTDOhN 110VRS 10.3 10.3 592.5
14. Il0URS gel 1LR ATOR ON LINE 671.7 le415.7 65,809.7
15. UNIT RESl_RVL SliUTDOWN 610URS 24.3 24.3 620.7
16. GROSS TilERMAL EtJERGY GENERATED (MhlO 81Le187 1e696eo14 92 e 4'8 9 e 409
17. GROSS Ell CTRICAL ENERGY GENERATED (MWil) 263,090 Sb4,070 31,187,820
18. 14ET LLI.CTRICAL Erl!RGY GENERATED (MWil) 249,152 525,243 29,715e421
19. UNIT SERVICE FACTOR 96.5 98.3 80.6 at 20. UNIT AVAILADILITY FACTOR 100.0 100.0 81.3 C 21. UNIT CAPACITY FACTOR (USING MDC NET) 72.3 73.7 74.8 e 22. UNIT CAPACITY FACTOR (USIl4G DER llET) 72.0 73.4 73.2

.. 23. UNIT FORCED OUTAGE RATE 0.0 0.0 3.5

24. SilUTD0hil5 SCilEDULED OVER llEXT 6 MollTils (lYPEe DATEe AtJD DURATI0ll 0F EACIO:

00 None scheduled.

O 25. IF SilUTD0hN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: MARCII 21, 1980 W

P DATA REPORTED AND FACTORS CALCULATED AS FEOULSTtD Ill 1.RC LETTEl< DATED SLPTEMCEh 2de 197i

8 OPERATIl1G DATA REP 0hT DOCKET NO. 50-301 DATE March 6, 1980 COMPLETLD DY C. h. FAY ,

TELLPil0NE 414 277 2811 OPERATItJG STAlUS

1. UtJIT NAME: POINT DEACil NUCLEAR FLANT UNIT 2 . NOTES .
2. REPORTING PERIOD: FEDRUARY 1980 . .
3. LICEtJSED TiiERMAL POWER (MWT): 1518. . .
4. tJAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESIGr1 ELt.CTRICAL RATING (lJET MhEli 497. . .
6. MAXIMUM DEPI:tJDADLE CAPACITY (GROSS MhE): 519. . .
7. MAXIMUfl DEPLNDADLE CAPACITY (NET MhE): 495. . . . . . . . . . . . . . . . . . . . . . . . .
8. IF CllANGES OCCUR It1 CAPACITY RATINGS (ITEMS NUMDER 3 TilROUGil 7) SINCE LAST REPORTe GIVE hEASONS:

t10T API'LICADLE

9. POWER LEVLL To hillCil RESTRICTEDe IF ANY (14ET MWE): NOT API'LICADLE
10. REASONS FOR !<ESTRICTIONS, (IF Al4Y): NOT API'LICADLE TilIS Mol1Til YR TO DATE CUMULATIVE
11. Il0URS It1 REPORTIt4G PERIOD 696 le440 6be457
12. NUMDER OF fl0URS REACTOR WAS CRITICAL 650.4 1,394.4 60e291.3
13. REACTOR I ESEl VE SilVTDOWN ll0URS 0.0 0.0 166.1
14. Il0URS GENIRATOR Ofl LINE 650.4 le394.4 59,121.4
15. UtJIT RESLRVE SilUTD0hti Il0URS 0.0 0.0 106.4
16. GROSS TilERMAL Et4ERGY GENLRATED (Mhill 974e189 2,085,691 79,738,227
17. GROSS ELECTRICAL EtJERGY GENLR ATED (MWil) 322,800 692,500 27e053,840
18. IJET ELECTRICAL EtJERGY GEllERATED (Mhil) 307e968 661,372 25,736,499
19. UtlIT SERVICE FACTOR 93.4 96.8 89.0
20. UNIT AVAILADILITY FACTOR 93.4 96.8 69.1
21. UtJIT CAPACITY FACTOR (USING MDC tlET) 89.4 92.8 79.0
22. UNIT CAPACITY FACTOR (USIl4G DER NET) 89.0 92.4 77.9
23. UtJIT FORCED OUTAGE RATE 66 3.2 1.5
24. SilUTDohNS SCilEDULED OVER NEXT 6 MONTil5 (TYPEe DATEe AtJD DURATION OF EACll)i Refueling shutdown scheduled for April 11, 1980, to last approximately five weeks.
25. IF SliUTDOWN AT EtJD OF REPORT FERIODe ESTIMATED DATE OF STARTUP: MARCil 13, 1980 DATA REPORTED Atib FACTORS CALCUl. ATED AS RE0 VESTED Ill WhC LETTER DATED SEPTEMDER 23e 197/

UNIT SIlUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 REPORT MONTH February, 1980 Fay COMPLETED 1 TELEPHONE 414/277-2811 m

h c W tD O #

o- N Oc4 Ev c e Y0 $ cYe 0$ Um No. Date g gg g jgg Licensee Event gg g'g Cause and Corrective Action s am e v ;c Report No. m ao To Prevent Recurrence Qw (4 0 U3 c O X: 3 U O _

1 800228 S 24.3 D 1 CB itTEXCI The unit was taken of f line in accordance with an NRC Confirmator r Order of November 30, 1979 which

~

required shutdown within 60 effective full power days of operation for performance of steam generator leak testing and eddy current inspection. Unit 1 inspections will begin upon completion of similar work currently being performed on Unit 2.

1 3 F: Forced Reason: Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram Sheets for LER File D- Regulatory Restriction 4- Other (explain) (NUREG-0161)

E- Operator Training & License Exam F- Administrative 5 Exhibit I- Same AD-28B G- Operational Error (explain) Source (01-78) 11- Other (explain) .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 UNIT NAME Point Heach IInit 2 REPORT MONTH February, 1980 COMPLETED B . av TELEPHONE 414/277-2811

~

m c w mo u e

.S a au "co eoe

.S t Pe am So ce No. Date g gd g jgg Licensee Event gg g] Cause and Corrective Action 8 om o ee Report No. m EU To Prevent Recurrence a ~-  % o Eo m >c U 8

1 800228 F 45.6 A 1 80-002/OlT-0 CB llT E X CI An orderly shutdown of the unit was comple ted at 0224 hours0.00259 days <br />0.0622 hours <br />3.703704e-4 weeks <br />8.5232e-5 months <br /> on February 28, 1980, following con-firmation of primary-to-secondary leakage of 1,420 gallons per day in the "A" steam generator. A static head leak check identified the defective tube and subsequent eddy current inspection placed the de fect at 10" above the tube end on the hot leg side. Following completion of eddy current inspec-tion, the leaking tube and any other defective tubes will be i plugged and a hydrostatic test pe r formed .

l l 1 l F: Forced Reason: 4 Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram Sheets for LER File D- Regulatory Restriction 4- Other (explain) (NUREG-0161)

E- Operator Training & License Exam F- Administrative 5 AD-28B Exhibit I- Same G- Operational Error (explain) Source (01-78) H- Other (explain) .

DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE March 6, 1980 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH February, 1980 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 371 11 372 21 373 2 370 12 374 22 378 3 367 13 377 23 378 4 368 14 378 24 376 5 371 15 375 25 374 6 368 16 371 26 374 7 367 17 376 27 369 8 370 18 373 28 342 9 371 19 369 29 - 13 10 374 2 370 30 ---

1 31 ---

AD-28A (1-77) ,

DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE March 6, 1980 COMPLETED BY C. W. Fay TELEPHONE. 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH February, 1980 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 469 11 475 21 476 2 471 12 479 22 483 3 469 13 481 23 483 4 471 14 483 24 483 5 475 15 478 25 475 6 469 16 472 26 473 7 470 17 479 27 468 8 474 18 479 28 10 9 4 74 19 480 29 -

7 10 456 2A 482 30 ---

31 ---

AD-28A (1-77) ,

- - - - - - - - - - - _ _ - _ _ _ __ _ _ _ - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ __---_s

i NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-266 Unit Name Point Beach Unit 1 Date March 6, 1980 .

Completed By C. W. Fay Telephone 414/277-2811 Unit 1 was base loaded for the period with no load reductions and one shutdown. The unit generated its 31 billionth kilowatt hour at 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> on February 9, 1980.

The unit has been operating at a slightly reduced efficiency because of increased circulating water temperatures caused by ice melt operation. The unit was taken off line at 2343 hours0.0271 days <br />0.651 hours <br />0.00387 weeks <br />8.915115e-4 months <br /> on February 28, 1980 in accordance with the NRC Con-firmatory Order dated November 30, 1979 which required unit shutdown after 60 effective full power days of operation to perform steam generator leak checks and eddy current inspection.

However, commencement of this inspection is being deferred until -

completion of similar inspections of the Unit 2 steam gencrators.

Unit 1 primary-to-secondary leakage at the time it was taken off line was approximately 30 gallons per day and had been stable at this figure throughout the period of operation since the previous startup on December 23, 1979.

Licensee Event Report No. 80-001/0lT was filed as a result of isolation of both motor-driven auxiliary feed pump pressure transmitters for a period of seven. days. These transmitters allow the feed pump discharge valves to control feed pump discharge pressure. With the transmitter valves closed, the pump discharge valves would not have opened automatically if the motor-driven auxiliary feed pumps were started. Valve position and discharge flow indication along with manual control of the valves were available on the control board, however, to allow operator action to assure auxiliary feedwater supply if it had been required.

Modifications have been completed to allow the pressure transmitter isolation valves to be placed in a " locked open" position.

The Unit 1 "B" reactor coolant pump seal leakage was below normal throughout the period, but is stable and at a sufficient level to provide adequate seal lubrication along with cooling to the pump lower bearings. An inspection of the pump seals will be performed during the current steam generator inspection outage.

Reracking of the south spent fuel pit is in progress and the old racks are currently being crated and shipped off site.

The 3D diesel generator governor was replaced during the period.

l l

I

Construction of on-site radioactive waste temporary storage vaults located just behind the Unit 1 facade has been ,

completed except for cleanup and minor finishing work.

Work continues on IE Bulletin Nos. 79-02, anchor bolt inspection, and 79-14, seismic analysis for as-built safety related piping systems.

No other major safety-related maintenance was performed during the period.

i l

l

7. .

~

I - - - - - . ..

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date March 6, 1980 .

Completed By C. W. Fay Telephone 414/277-2811 Unit 2 was base loaded for most of the period with two load reductions and one shutdown. The unit generated its 27 billionth kilowatt hour at 1220 hours0.0141 days <br />0.339 hours <br />0.00202 weeks <br />4.6421e-4 months <br /> on February 23, 1980.

Unic load was reduced for~nine'and one-half hours on February 10, 1980 to 380 MWe net for turbine stop valve testing, and again on February 21, 3'80 to 460 MWe net for approximately six hours because of a turbine runback caused by a momentary loss of power on the red instrument bus. The unit was shut down at 0225 hours0.0026 days <br />0.0625 hours <br />3.720238e-4 weeks <br />8.56125e-5 months <br /> on February 28, 1980 following confirmation of primary-to-secondary leakage of 1,420 gallons per day in the "A" steam generator. The leak had begun as a slight indication about noon the previous day. A static head leak check identified the defective tube, and a subsequent eddy current inspection placed the defect at ten inches above the tube end; i.e., deep in the crevice region of the tubesheet. An 800 psi hydrostatic test of the "B" steam generator revealed no leaking tubes or plugs. The previously scheduled refueling outage steam generator eddy current inspection is being performed during this outage. Following completion of the inspection, the leaking tube and all tubes with indications greater than the plugging limit will be plugged and a hydrostatic test performed. Licensee Event Report No. 80-002/01T is being prepared on this event.

The unit has been operating at a slightly reduced efficiency because of increased circulating water temperatures caused by ice melt operation; also, the unit has been operating in the core stretch mode since 2150 hours0.0249 days <br />0.597 hours <br />0.00355 weeks <br />8.18075e-4 months <br /> on February 20, 1980.

Licensee Event Report No. 80-001/0lT was filed regarding the loss of power range channel redundancy. At 1831 hours0.0212 days <br />0.509 hours <br />0.00303 weeks <br />6.966955e-4 months <br /> on February 21, 1980 a momentary loss of the red instrument bus

! generated a negative spike which caused power range Channel N41 to fail low. Failure of the power range channel resulted in a loss of redundancy until the bistable was placed in the tripped mode eleven minutes later, in accordance with ICP 10.2. The negative power spike was caused by a faulty capacitor in the 2DY01 power supply. The Channel N41 fuses were replaced, the ,

red instrument bus shifted to the alternate power supply and all bistables returned to normal at 1858 hours0.0215 days <br />0.516 hours <br />0.00307 weeks <br />7.06969e-4 months <br /> on February 21, 1980.

l The faulty capacitor was replaced the following day and the red instrument bus was returned to the normal power supply at that time.

_2-Work continues on IE Bulletin Nos. 79-02, anchor bolt inspection,.and 79-14, seismic analysis for as-built hafety

  • related piping systems.

No other major safety-related maintenance was performed during.the' period.

1 1

4 i

s t

4 y

1 1

i

, -. , .