IR 05000026/2009403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 10/29/2009
| issue date = 10/29/2009
| title = IR 0500026-09-403, (Drs), IR 05000301-09-403, (Drs), on 09/14/2009 - 09/23/2009, Point Beach Nuclear Plant, Units 1 and 2, Routine Security Baseline Inspection - Cover Letter
| title = IR 0500026-09-403, (Drs), IR 05000301-09-403, (Drs), on 09/14/2009 - 09/23/2009, Point Beach Nuclear Plant, Units 1 and 2, Routine Security Baseline Inspection - Cover Letter
| author name = Duncan E R
| author name = Duncan E
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Meyer L
| addressee name = Meyer L
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 29, 2009  
{{#Wiki_filter:ber 29, 2009


Mr. Larry Meyer
==SUBJECT:==
 
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2009403(DRS);
Site Vice-President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
 
SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2009403(DRS);
5000301/2009403(DRS)
5000301/2009403(DRS)


==Dear Mr. Meyer:==
==Dear Mr. Meyer:==
On September 23, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 23, 2009, with you and other members of your staff.
On September 23, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 23, 2009, with you and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


personnel.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings of significance were identified.
No findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA by D. Funk for/
Sincerely,
Eric Duncan, Chief  
/RA by D. Funk for/
 
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2009403(DRS);
Plant Support Branch  
05000301/2009403(DRS)
 
w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/STSB M. Nazar, Senior Vice President & Chief Nuclear Officer cc w/o encl: Distribution via ListServ
Division of Reactor Safety  
 
Docket Nos. 50-266; 50-301  
 
License Nos. DPR-24; DPR-27  
 
Nonpublic  
 
===Enclosure:===
Inspection Report 05000266/2009403(DRS); 05000301/2009403(DRS)  
 
===w/Attachment:===
Supplemental Information  
 
cc w/encl: S. Coker, NSIR/DSO/DDSO/STSB M. Nazar, Senior Vice President & Chief Nuclear Officer  
 
cc w/o encl: Distribution via ListServ
}}
}}

Latest revision as of 01:56, 14 November 2019

IR 0500026-09-403, (Drs), IR 05000301-09-403, (Drs), on 09/14/2009 - 09/23/2009, Point Beach Nuclear Plant, Units 1 and 2, Routine Security Baseline Inspection - Cover Letter
ML093060310
Person / Time
Site: Point Beach, 05000026  NextEra Energy icon.png
Issue date: 10/29/2009
From: Eric Duncan
Plant Support Branch II
To: Meyer L
Point Beach
References
IR-09-403
Download: ML093060310 (3)


Text

ber 29, 2009

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2009403(DRS);

5000301/2009403(DRS)

Dear Mr. Meyer:

On September 23, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 23, 2009, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by D. Funk for/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2009403(DRS);

05000301/2009403(DRS)

w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/STSB M. Nazar, Senior Vice President & Chief Nuclear Officer cc w/o encl: Distribution via ListServ