ML102440058: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 09/01/2010
| issue date = 09/01/2010
| title = Mid-Cycle Performance Review and Inspection Plan - Kewaunee Power Station
| title = Mid-Cycle Performance Review and Inspection Plan - Kewaunee Power Station
| author name = Kunowski M A
| author name = Kunowski M
| author affiliation = NRC/RGN-III/DRP/B5
| author affiliation = NRC/RGN-III/DRP/B5
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Dominion Energy Kewaunee, Inc
| addressee affiliation = Dominion Energy Kewaunee, Inc
| docket = 05000305
| docket = 05000305
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2010  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
 
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard  
 
Glen Allen, VA 23060-6711  


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - KEWAUNEE POWER STATION  
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
KEWAUNEE POWER STATION


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
Line 29: Line 26:
On August 4, 2010, the NRC staff completed its performance review of Kewaunee Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
On August 4, 2010, the NRC staff completed its performance review of Kewaunee Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information.
This performance review and enclosed inspection plan do not include security information.
A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.  
A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
 
Plant performance for the most recent quarter at Kewaunee Power Station was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
Plant performance for the most recent quarter at Kewaunee Power Station was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.  
 
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
D. Heacock     
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


D. Heacock                                    In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.
Sincerely,  
Sincerely,
      /RA/
                                            /RA/
Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects  
Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43
 
Docket No. 50-305 License No. DPR-43  


==Enclosure:==
==Enclosure:==
Kewaunee Power Station Inspection/Activity Plan  
Kewaunee Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ
 
cc w/encl: Distribution via ListServ  
 
D. Heacock     
 
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


D. Heacock                                                                  In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.
Sincerely,  
Sincerely,
      /RA/
                                                                          /RA/
Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects  
Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43
 
Docket No. 50-305 License No. DPR-43  


==Enclosure:==
==Enclosure:==
Kewaunee Power Station Inspection/Activity Plan  
Kewaunee Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ DISTRIBUTION:
See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2010 to 2011\midcycle letters\Kewa 2010 MOC Letter.docx Publicly Available                          Non-Publicly Available                    Sensitive                Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII                                RIII NAME                PCardona-Morales MKunowski for Jandovitz:dtp:cs DATE                08/26/10                            08/26/10 OFFICIAL RECORD COPY


cc w/encl:  Distribution via ListServ DISTRIBUTION
Letter to D. Heacock from M. Kunowski dated September 1, 2010
: See next page
 
DOCUMENT NAME:  G:\Branch TSS\ALL MOC\midcycle 2010 to 2011\midcycle letters\Kewa 2010 MOC Letter.docx  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE  RIII    RIII        NAME  PCardona-Morales for Jandovitz:dtp:cs MKunowski DATE  08/26/10  08/26/10 OFFICIAL RECORD COPY
 
Letter to D. Heacock from M. Kunowski dated September 1, 2010  


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - KEWAUNEE POWER STATION  
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
 
KEWAUNEE POWER STATION DISTRIBUTION:
DISTRIBUTION
Susan Bagley RidsNrrDorlLpl3-1 RidsNrrPMKewaunee Resource RidsNrrDirsIpab Resource Steven Reynolds Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
: Susan Bagley  
 
RidsNrrDorlLpl3-1 RidsNrrPMKewaunee Resource RidsNrrDirsIpab Resource Steven Reynolds Steven Orth Jared Heck  


Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
Kewaunee Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates                                                                                                                                No. of Staff Start      End      Inspection Activity                                                          Title                                        on Site IP71152      - BIENNIAL PI&R INSPECTION                                                                                          5 08/16/2010  09/03/2010  IP 71152B            Identification and Resolution of Problems BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                          1 10/18/2010  10/22/2010  IP 71124.07          Radiological Environmental Monitoring Program 10/18/2010  10/22/2010  IP 71151-BI01        Reactor Coolant System Activity 10/18/2010  10/22/2010  IP 71151-OR01        Occupational Exposure Control Effectiveness 10/18/2010  10/22/2010  IP 71151-PR01        RETS/ODCM Radiological Effluent BI EP        - EP ROUTINE INSPECTION / PI VERIFICATION                                                                            2 11/01/2010  11/05/2010  IP 7111402            Alert and Notification System Testing 11/01/2010  11/05/2010  IP 7111403            Emergency Preparedness Organization Staffing and Augmentation System 11/01/2010  11/05/2010  IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies 11/01/2010  11/05/2010  IP 71151-EP01        Drill/Exercise Performance 11/01/2010  11/05/2010  IP 71151-EP02        ERO Drill Participation 11/01/2010  11/05/2010  IP 71151-EP03        Alert & Notification System BI OL        - BIENNIAL REQUAL PROGRAM INSPECTION                                                                                2 12/13/2010  12/17/2010  IP 7111111B          Licensed Operator Requalification Program OL PREP      - KEWAUNEE INIT PREP - 01/2011                                                                                      3 01/17/2011  01/21/2011      W90231            OL - INITIAL EXAM - FEB 2011 - KEWA OL EXAM      - KEWAUNEE INIT EXAM 02/2011                                                                                        3 02/07/2011  02/18/2011      W90231            OL - INITIAL EXAM - FEB 2011 - KEWA BI ENG        - INSERVICE INSPECTION                                                                                              1 02/26/2011  03/26/2011  IP 7111108P          Inservice Inspection Activities - PWR BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                          1 02/28/2011  03/04/2011  IP 2515/179          Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 02/28/2011  03/04/2011  IP 71124.01          Radiological Hazard Assessment and Exposure Controls 02/28/2011  03/04/2011  IP 71124.02          Occupational ALARA Planning and Controls BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                          1 06/06/2011  06/10/2011  IP 71124.06          Radioactive Gaseous and Liquid Effluent Treatment 06/06/2011  06/10/2011  IP 71151-BI01        Reactor Coolant System Activity 06/06/2011  06/10/2011  IP 71151-OR01        Occupational Exposure Control Effectiveness 06/06/2011  06/10/2011  IP 71151-PR01        RETS/ODCM Radiological Effluent ISFSI        - ISFSI INSPECTION - SCHEDULE DEPENDENT                                                                              2 08/01/2011  08/31/2011  IP 60855.1            Operation of an Independent Spent Fuel Storage Installation at Operating Plants


Inspection / Activity Plan Page 1 of 2 08/26/2010 Report 22 09/01/2010
Kewaunee Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates                                                                                                                             No. of Staff Start     End     Inspection Activity                                                         Title                                       on Site BI ENG        - TRIENNIAL FIRE PROTECTION INSPECTION                                                                           3 09/06/2011   10/07/2011   IP 7111105T        Fire Protection [Triennial]
-12/31/2011 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Kewaunee IP71152-BIENNIAL PI&R INSPECTION 5 1    IP Identification and Resolution of Problems 71152B 08/16/2010 09/03/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radiological Environmental Monitoring Program 71124.07 10/18/2010 10/22/2010 1    IP Reactor Coolant System Activity 71151-BI01 10/18/2010 10/22/2010 1    IP Occupational Exposure Control Effectiveness 71151-OR01 10/18/2010 10/22/2010 1    IP RETS/ODCM Radiological Effluent 71151-PR01 10/18/2010 10/22/2010 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION 2 1    IP A lert and Notification System Testing 7111402 11/01/2010 11/05/2010 1    IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 11/01/2010 11/05/2010 1    IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/01/2010 11/05/2010 1    IP Drill/Exercise Performance 71151-EP01 11/01/2010 11/05/2010 1    IP ERO Drill Participation 71151-EP02 11/01/2010 11/05/2010 1    IP A lert & Notification System 71151-EP03 11/01/2010 11/05/2010 BI OL-BIENNIAL REQUAL PROGRAM INSPECTION 2 1    IP Licensed Operator Requalification Program 7111111B 12/13/2010 12/17/2010 OL PREP-KEWAUNEE INIT PREP - 01/2011 3 1    OL - INITIAL EXAM - FEB 2011 - KEWA W90231 01/17/2011 01/21/2011 OL EXAM-KEWAUNEE INIT EXAM 02/2011 3 1    OL - INITIAL EXAM - FEB 2011 - KEWA W90231 02/07/2011 02/18/2011 BI ENG-INSERVICE INSPECTION 1 1    IP Inservice Inspection Activities - PWR 7111108P 02/26/2011 03/26/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 02/28/2011 03/04/2011 1    IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/28/2011 03/04/2011 1    IP Occupational ALARA Planning and Controls 71124.02 02/28/2011 03/04/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/06/2011 06/10/2011 1    IP Reactor Coolant System Activity 71151-BI01 06/06/2011 06/10/2011 1    IP Occupational Exposure Control Effectiveness 71151-OR01 06/06/2011 06/10/2011 1    IP RETS/ODCM Radiological Effluent 71151-PR01 06/06/2011 06/10/2011 ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT 2 1    IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 08/01/2011 08/31/2011 This report does not include INPO and OUTAGE activities.
BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                                       1 09/12/2011   09/16/2011   IP 71124.01         Radiological Hazard Assessment and Exposure Controls 09/12/2011   09/16/2011   IP 71124.02        Occupational ALARA Planning and Controls 09/12/2011   09/16/2011   IP 71124.03        In-Plant Airborne Radioactivity Control and Mitigation 09/12/2011   09/16/2011   IP 71124.04        Occupational Dose Assessment BI EP         - EP EXERCISE INSPECTION / PI VERIFICATION                                                                       3 10/03/2011   10/07/2011   IP 7111401          Exercise Evaluation 10/03/2011   10/07/2011   IP 71151-EP01      Drill/Exercise Performance 10/03/2011   10/07/2011   IP 71151-EP02      ERO Drill Participation 10/03/2011   10/07/2011   IP 71151-EP03      Alert & Notification System STRIKE       - STRIKE CONTINGENCY - OPS/MAINT/RP                                                                               2 10/01/2011   11/11/2011   IP 92709            Licensee Strike Contingency Plans BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                                       1 12/05/2011  12/09/2011  IP 71124.08        Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation}}
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 08/26/2010 Report 22 09/01/2010
-12/31/2011 Unit Number Planned Dates Start          End Inspection Activity Title No. of Staff on Site Kewaunee BI ENG-TRIENNIAL FIRE PROTECTION INSPECTION 3 1    IP Fire Protection [Triennial]
7111105T 09/06/2011 10/07/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/12/2011 09/16/2011 1    IP Occupational ALARA Planning and Controls 71124.02 09/12/2011 09/16/2011 1    IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/12/2011 09/16/2011 1    IP Occupational Dose Assessment 71124.04 09/12/2011 09/16/2011 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION 3 1    IP Exercise Evaluation 7111401 10/03/2011 10/07/2011 1    IP Drill/Exercise Performance 71151-EP01 10/03/2011 10/07/2011 1    IP ERO Drill Participation 71151-EP02 10/03/2011 10/07/2011 1    IP A lert & Notification System 71151-EP03 10/03/2011 10/07/2011 STRIKE-STRIKE CONTINGENCY - OPS/MAINT/RP 2 1    IP Licensee Strike Contingency Plans 92709 10/01/2011 11/11/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/05/2011 12/09/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 13:55, 13 November 2019

Mid-Cycle Performance Review and Inspection Plan - Kewaunee Power Station
ML102440058
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 09/01/2010
From: Michael Kunowski
NRC/RGN-III/DRP/B5
To: Heacock D
Dominion Energy Kewaunee
References
Download: ML102440058 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2010 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

KEWAUNEE POWER STATION

Dear Mr. Heacock:

On August 4, 2010, the NRC staff completed its performance review of Kewaunee Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Kewaunee Power Station was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

D. Heacock In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

Kewaunee Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

D. Heacock In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

Kewaunee Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ DISTRIBUTION:

See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2010 to 2011\midcycle letters\Kewa 2010 MOC Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME PCardona-Morales MKunowski for Jandovitz:dtp:cs DATE 08/26/10 08/26/10 OFFICIAL RECORD COPY

Letter to D. Heacock from M. Kunowski dated September 1, 2010

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

KEWAUNEE POWER STATION DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 RidsNrrPMKewaunee Resource RidsNrrDirsIpab Resource Steven Reynolds Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

Kewaunee Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site IP71152 - BIENNIAL PI&R INSPECTION 5 08/16/2010 09/03/2010 IP 71152B Identification and Resolution of Problems BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 10/18/2010 10/22/2010 IP 71124.07 Radiological Environmental Monitoring Program 10/18/2010 10/22/2010 IP 71151-BI01 Reactor Coolant System Activity 10/18/2010 10/22/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/18/2010 10/22/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 2 11/01/2010 11/05/2010 IP 7111402 Alert and Notification System Testing 11/01/2010 11/05/2010 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 11/01/2010 11/05/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/01/2010 11/05/2010 IP 71151-EP01 Drill/Exercise Performance 11/01/2010 11/05/2010 IP 71151-EP02 ERO Drill Participation 11/01/2010 11/05/2010 IP 71151-EP03 Alert & Notification System BI OL - BIENNIAL REQUAL PROGRAM INSPECTION 2 12/13/2010 12/17/2010 IP 7111111B Licensed Operator Requalification Program OL PREP - KEWAUNEE INIT PREP - 01/2011 3 01/17/2011 01/21/2011 W90231 OL - INITIAL EXAM - FEB 2011 - KEWA OL EXAM - KEWAUNEE INIT EXAM 02/2011 3 02/07/2011 02/18/2011 W90231 OL - INITIAL EXAM - FEB 2011 - KEWA BI ENG - INSERVICE INSPECTION 1 02/26/2011 03/26/2011 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 02/28/2011 03/04/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 02/28/2011 03/04/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 02/28/2011 03/04/2011 IP 71124.02 Occupational ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/06/2011 06/10/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 06/06/2011 06/10/2011 IP 71151-BI01 Reactor Coolant System Activity 06/06/2011 06/10/2011 IP 71151-OR01 Occupational Exposure Control Effectiveness 06/06/2011 06/10/2011 IP 71151-PR01 RETS/ODCM Radiological Effluent ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT 2 08/01/2011 08/31/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

Kewaunee Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 09/06/2011 10/07/2011 IP 7111105T Fire Protection [Triennial]

BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 09/12/2011 09/16/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 09/12/2011 09/16/2011 IP 71124.02 Occupational ALARA Planning and Controls 09/12/2011 09/16/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 09/12/2011 09/16/2011 IP 71124.04 Occupational Dose Assessment BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 10/03/2011 10/07/2011 IP 7111401 Exercise Evaluation 10/03/2011 10/07/2011 IP 71151-EP01 Drill/Exercise Performance 10/03/2011 10/07/2011 IP 71151-EP02 ERO Drill Participation 10/03/2011 10/07/2011 IP 71151-EP03 Alert & Notification System STRIKE - STRIKE CONTINGENCY - OPS/MAINT/RP 2 10/01/2011 11/11/2011 IP 92709 Licensee Strike Contingency Plans BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 12/05/2011 12/09/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation