Master Inspection Plan Calendar Year 2017
ML16356A603
Person / Time
Site: Kewaunee  Dominion icon.png
Issue date: 12/21/2016
From: Michael Kunowski
NRC/RGN-III/DNMS/MCID
To: Stoddard D
Dominion
Edwards R
References
Download: ML16356A603 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 21, 2016 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

KEWAUNEE POWER STATION MASTER INSPECTION PLAN CALENDAR YEAR 2017

Dear Mr. Stoddard:

In accordance with Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program, and IMC 2690, Inspection Program for Dry Cask Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations and for Title 10 of the Code of Federal Regulations (CFR) Part 71 Transportation Packagings, the NRC Region III staff developed a Master Inspection Plan (MIP) for the Kewaunee Power Station for calendar year 2017. The inspection plan is based on your current performance in executing the site decommissioning and Independent Spent Fuel Storage Installation (ISFSI) projects and your planned decommissioning and dry cask loading activities for the site in January through December 2017. The plan outlines how we intend to focus our regional inspection resources to provide oversight of decommissioning and dry cask loading activities.

The MIP is based, in part, on your proposed schedule of decommissioning and dry cask loading activities for calendar year 2017. As a result, the plan and the focus of inspection activities may change to reflect changes in your activities or performance. To ensure that this MIP remains current, we request that you keep the NRC Region III Materials Control, ISFSI, and Decommissioning Branch (MCID) staff informed of any significant changes in your proposed schedule of decommissioning and dry cask loading activities. You will be informed of any significant changes to our plans for inspections at the Kewaunee site.

Since the site initiated a transition to SAFSTOR in 2013, and those activities are expected to continue into 2017, the NRC regional office intends to perform inspections appropriate for a site in SAFSTOR. Since dry cask loading activities are expected to continue in 2017, the MIP also reflects our inspection scope for preoperational testing of an ISFSI and initial loading.

The following is a list of the routine inspection procedures we expect to use during our inspections. The procedures used during each inspection will depend on the specific activities being conducted at the site. Additional discretionary inspection procedures may be used if decommissioning or ISFSI activities warrant.

D. Stoddard 2 Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials IP 60854 Preoperational Testing of an ISFSI IP 60855 Operation of an ISFSI In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding this MIP. If you have questions, please feel free to contact the following members of my staff: Rhex Edwards at 630-829-9722 or Eugenio Bonano (Security) at 630-829-9826.

Sincerely,

/RA/

Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 50-305;72-064 License No. DPR-43 cc: Distribution via ListServ

D. Stoddard 3 Letter to Mr. Daniel G. Stoddard from Michael A. Kunowski, dated December 21, 2016

SUBJECT:

KEWAUNEE POWER STATION MASTER INSPECTION PLAN CALENDAR YEAR 2017.

DISTRIBUTION:

Bruce Watson Ted Carter John Giessner Allan Baker Harral Logaras Carol Ariano Linda Linn MCID Branch ADAMS Accession Number: ML16356A603 OFFICE RIII-DNMS RIII-DNMS RIII-DNMS NAME REdwards:cl EBonano MKunowski DATE 12/21/2016 12/21/2016 12/21/2016 OFFICIAL RECORD COPY