August 22, 2002 Mr. T. Coutu Site Vice-President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN KEWAUNEE NUCLEAR POWER PLANT

Dear Mr. Coutu:

On July 31, 2002, the NRC staff completed its mid-cycle plant performance assessment of the Kewaunee Nuclear Power Plant. In accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the mid-cycle review involved the participation of all technical divisions in evaluating the performance of your Kewaunee facility for the first half of the current assessment cycle, January 1 - December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct baseline inspections at your facility through September 30, 2003. However, the significance of a finding involving the lack of a fixed suppression system in the safeguards alley is still under review as part of the Significance Determination Process. An inspection was conducted from July 31 to August 2, 2002, to follow up on this issue and the results will be transmitted to you by separate correspondence. Additional inspections may be conducted, as specified by the Action Matrix, after we complete our review of the results. We will notify you of any additional inspections.

The enclosed inspection plan details the inspections scheduled through September 30, 2003.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspection plan for the last 6 months is tentative and may be revised at the end-of-cycle review.

In addition, the NRC is in the process of finalizing a Temporary Instruction that will be used to review implementation of the Interim Compensatory Measures required by the Agencys Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules

A. Coutu have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.

In accordance with 10 CFR 2.790 of the NRCs Rule of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9631 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Roger Lanksbury, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

Kewaunee Inspection/Activity Plan cc w/encl:

D. Graham, P.E., Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer The Honorable Darin A. Jeanquart D. Day, President, Two Rivers City Council D. C. Markwardt, Chairperson, Manitowac County G. Novickis, Chairman, Kewaunee County N. Crowley, Director, Manitowac County Emergency Government L. Hucek, Director, Kewaunee County Emergency Government G. Buckley, Two Rivers City Manager C. Meyer, President, Village of Mishicot INPO

A. Coutu have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.

In accordance with 10 CFR 2.790 of the NRCs Rule of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9631 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Roger Lanksbury, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

Kewaunee Inspection/Activity Plan cc w/encl:

D. Graham, P.E., Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer The Honorable Darin A. Jeanquart D. Day, President, Two Rivers City Council D. C. Markwardt, Chairperson, Manitowac County G. Novickis, Chairman, Kewaunee County N. Crowley, Director, Manitowac County Emergency Government L. Hucek, Director, Kewaunee County Emergency Government G. Buckley, Two Rivers City Manager C. Meyer, President, Village of Mishicot INPO DOCUMENT NAME: G:\\Branch TSS\\midcycle2002\\inspectionplnltrs-02\\kew-inspectionplnltr.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME MKunowski:co RLanksbury DATE 08/ /02 08/ /02

OFFICIAL RECORD COPY A. Coutu ADAMS Distribution:

AJM DFT H. Nieh, OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Kewaunee DRPIII DRSIII PLB1 JRK1

Kewaunee Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/26/2002 13:03:23 Report 22 3

FY 2002

- KEWAUNEE INIT EXAM 08&09/2002 Not Applicable 08/26/2002 09/06/2002 OL - INITIAL EXAM - KEWAUNEE - JUL/AUG/SEP 2002 W90056 1

2 71111.11

- LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 09/16/2002 09/20/2002 Licensed Operator Requalification IP 7111111B 1

1 71130

- SAFEGUARDS INSPECTION-AA/AC/PI/PC Baseline Inspections 09/16/2002 09/20/2002 Access Authorization Program (Behavior Observation Only)

IP 7113001 1

Baseline Inspections 09/16/2002 09/20/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)

IP 7113002 1

Baseline Inspections 09/16/2002 09/20/2002 Security Plan Changes IP 7113004 1

Baseline Inspections 09/16/2002 09/20/2002 Performance Indicator Verification IP 71151 1

1 IP 71122

- REMP & UNCONDITIONAL RELEASE INSP Baseline Inspections 09/16/2002 09/20/2002 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 09/16/2002 09/20/2002 Radiological Environmental Monitoring Program IP 7112203 1

Baseline Inspections 09/16/2002 09/20/2002 Performance Indicator Verification IP 71151 1

7 SSDI

- SAFETY SYSTEM BIENNIAL & MOD/5059 (DRS)

Baseline Inspections 10/21/2002 11/08/2002 Evaluation of Changes, Tests, or Experiments IP 7111102 1

Baseline Inspections 10/21/2002 11/08/2002 Permanent Plant Modifications IP 7111117B 1

Baseline Inspections 10/21/2002 11/08/2002 Safety System Design and Performance Capability IP 7111121 1

1 CONT B

- SAFEGUARDS INSPECTION-RESPONSE-TESTING Baseline Inspections 11/18/2002 11/22/2002 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)

IP 7113003 1

1 IP 71122

- RAD MATERIAL PROC/SHIPPING INSPECTION Baseline Inspections 02/24/2003 02/28/2003 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 02/24/2003 02/28/2003 Radioactive Material Processing and Transportation IP 7112202 1

2 ISI

- ISI Baseline Inspections 04/28/2003 05/09/2003 Inservice Inspection Activities IP 7111108 1

1 INSP

- OUTAGE INSPECTION Baseline Inspections 04/28/2003 05/02/2003 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 04/28/2003 05/02/2003 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 04/28/2003 05/02/2003 Performance Indicator Verification IP 71151 1

1 INSP

- ALARA Baseline Inspections 06/02/2003 06/06/2003 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 06/02/2003 06/06/2003 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 06/02/2003 06/06/2003 Performance Indicator Verification IP 71151 1

3 INSP

- BIENNIAL EP EXERCISE Baseline Inspections 09/22/2003 09/26/2003 Exercise Evaluation IP 7111401 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Kewaunee Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/26/2002 13:03:23 Report 22 3

INSP

- BIENNIAL EP EXERCISE Baseline Inspections 09/22/2003 09/26/2003 Performance Indicator Verification IP 71151 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.