UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 4, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MID-CYCLE ASSESSMENT LETTER - KEWAUNEE POWER STATION
Dear Mr. Heacock:
On August 8, 2012, the NRC completed its mid-cycle performance review of Kewaunee Power Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The assessment reflects the integration of the Security Cornerstone into Inspection Manual Chapter 0305, Operating Reactor Assessment Program.
The NRC determined the performance at Kewaunee Power Station during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC also plans to conduct non-routine inspections and temporary instructions at your facility, including: Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal; IP 71111.21, Component Design Basis Inspection; IP 71152, Problem Identification and Resolution; Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks (Phase 2);
TI 2515/187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns; and TI 2515/188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (630) 829-9628 with any questions you have regarding this letter.
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43
Enclosure:
Inspection Plan cc w/encl: Distribution via ListServ
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (630) 829-9628 with any questions you have regarding this letter.
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43
Enclosure:
Inspection Plan cc w/encl: Distribution via ListServ DISTRIBUTION:
See next page DOCUMENT NAME: KEWA MOC 2012 Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E
RIII RIII RIII NAME MReimer:rj DATE 08/27/12 OFFICIAL RECORD COPY
Letter to D. Heacock from K. Riemer dated September 4, 2012
SUBJECT:
MID-CYCLE ASSESSMENT LETTER - KEWAUNEE POWER STATION DISTRIBUTION:
Silas Kennedy RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
Page 1 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Kewaunee Inspection / Activity Plan 09/01/2012 - 12/31/2013 TI-187
- TI-2515/187 FLOODING WALKDOWN 3
IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 07/01/2012 12/31/2012 TI-188
- TI-2515/188 SEISMIC WALKDOWN 2
IP Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2515/188 07/01/2012 12/31/2012 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/10/2012 09/14/2012 IP Reactor Coolant System Activity 71151-BI01 09/10/2012 09/14/2012 IP Occupational Exposure Control Effectiveness 71151-OR01 09/10/2012 09/14/2012 IP RETS/ODCM Radiological Effluent 71151-PR01 09/10/2012 09/14/2012 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/10/2012 09/14/2012 IP Occupational Dose Assessment 71124.04 09/10/2012 09/14/2012 BI EPR
- EP ROUTINE INSPECTION / PI VERIFICATION 1
IP Alert and Notification System Testing 7111402 09/10/2012 09/14/2012 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/10/2012 09/14/2012 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/10/2012 09/14/2012 IP Performance Indicator Verification 71151 09/10/2012 09/14/2012 BI PI&R
- BIENNIAL PI&R INSPECTION 3
IP Problem Identification and Resolution 71152B 09/10/2012 09/28/2012 BI CDBI
- COMPONENT DESIGN BASIS INSPECTION 6
IP Component Design Bases Inspection 7111121 10/01/2012 11/02/2012 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Follow-up on the Industry's Ground Water Protection Initiative 2515/185 10/15/2012 10/19/2012 IP Occupational ALARA Planning and Controls 71124.02 10/15/2012 10/19/2012 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiation Monitoring Instrumentation 71124.05 11/26/2012 11/30/2012 BI OLRQ
- BIENNIAL REQUAL PROGRAM INSPECTION 2
IP Licensed Operator Requalification Program 7111111B 11/26/2012 11/30/2012 BI MODS
- TRIENNIAL PERM MODS/50.59 3
IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 03/18/2013 04/05/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/04/2013 02/08/2013
Page 2 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Kewaunee Inspection / Activity Plan 09/01/2012 - 12/31/2013 OL PREP
- KEWAUNEE INIT PREP 04/2013 3
OL - INITIAL EXAM - 2013 APR-MAY - KEWAUNEE W90288 04/15/2013 04/19/2013 ISFSI
- ISFSI INSPECTION - SCHEDULE DEPENDENT 2
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2013 08/31/2013 OL EXAM
- KEWAUNEE INIT EXAM - 05/2013 3
OL - INITIAL EXAM - 2013 APR-MAY - KEWAUNEE W90288 05/13/2013 05/24/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 05/20/2013 05/24/2013 TI 182
- TI 182 BURIED PIPING PHASE 2 2
IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 06/17/2013 06/21/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Environmental Monitoring Program 71124.07 07/08/2013 07/12/2013 IP Reactor Coolant System Activity 71151-BI01 07/08/2013 07/12/2013 IP Occupational Exposure Control Effectiveness 71151-OR01 07/08/2013 07/12/2013 IP RETS/ODCM Radiological Effluent 71151-PR01 07/08/2013 07/12/2013 RENEWAL
- LICENSE RENEWAL INSPECTION PHASE 2 6
IP Post-Approval Site Inspection for License Renewal 71003 09/09/2013 09/27/2013 BI EPX
- EP EXERCISE INSPECTION / PI VERIFICATION 2
IP Exercise Evaluation 7111401 10/07/2013 10/11/2013 IP Performance Indicator Verification 71151 10/07/2013 10/11/2013 BI ISI
- ISI BASELINE INSPECTION 1
IP Inservice Inspection Activities - PWR 7111108P 10/21/2013 11/08/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/28/2013 11/01/2013 BI OLRQ
- REQUALIFICATION PROGRAM INSPECTION 1
IP Licensed Operator Requalification Program - Annual Review 7111111A 11/04/2013 11/08/2013