ML073540333

From kanterella
Jump to navigation Jump to search
Change to the Inspection Plan 1/1/08 - 12/31/08
ML073540333
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/19/2007
From: Jamnes Cameron
NRC/RGN-III/DRP/B5
To: Christian D
Dominion Energy Kewaunee
References
Download: ML073540333 (6)


Text

December 19, 2007 Mr. David A. Christian President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

CHANGE TO THE INSPECTION PLAN - KEWAUNEE POWER STATION

Dear Mr. Christian:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Projects Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

As Stated cc w/encl:

S. Scace, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin State Liaison Officer, State of Wisconsin

Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Projects Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

As Stated cc w/encl:

S. Scace, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin State Liaison Officer, State of Wisconsin DOCUMENT NAME:G:\\BRANCH TSS\\ALL MOC\\MIDCYCLE 2006 TO 2007\\ROP REALIGNMENT LETTER\\KEWAUNEE.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JCameron:cms DATE 12/19/07 OFFICIAL RECORD COPY

Letter to D. Christian from J. Cameron dated December 19, 2007

SUBJECT:

CHANGE TO THE INSPECTION PLAN - KEWAUNEE POWER STATION DISTRIBUTION:

DXC1 TEB MHC RidsNrrDirsIrib MAS KGO JKH3 SXB3 CAA1 DRPIII DRSIII PLB1 TXN

Kewaunee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 02/11/2008 02/15/2008 7112101 IP Access Control to Radiologically Significant Areas 1

2515/166

- TI 2515/166 PWR SUMP INSPECTION Safety Issues 03/24/2008 03/28/2008 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

1 ISFSI

- ISFSI INSPECTION Other Routine 04/01/2008 09/30/2008 60854 IP Preoperational Testing Of An ISFSI Other Routine 04/01/2008 09/30/2008 60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 04/07/2008 04/11/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/07/2008 04/11/2008 7112102 IP ALARA Planning and Controls 2

BI ENG

- ENGINEERING INSERVICE INSPECTION/150/172 Safety Issues 03/31/2008 04/25/2008 2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA Generic Safety Inspec 03/31/2008 04/25/2008 2515/172 IP Reactor Coolant System Dissimiliar Metal Butt Welds Baseline Inspections 03/31/2008 04/25/2008 7111108P IP Inservice Inspection Activities - PWR 3

BI PI&R

- BIENNIAL PI&R INSPECTION Baseline Inspections 05/19/2008 06/06/2008 71152B IP Identification and Resolution of Problems 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 07/14/2008 07/18/2008 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/14/2008 07/18/2008 71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 07/14/2008 07/18/2008 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 07/14/2008 07/18/2008 71151-PR01 IP RETS/ODCM Radiological Effluent 1

ISFSI

- ISFSI INSPECTION Other Routine 07/01/2008 09/30/2008 60855 IP Operation Of An ISFSI Other Routine 07/01/2008 09/30/2008 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1

BI EP

- EP ROUTINE INSPECTION / PI VERIFICATION EP Baseline Inspectio 08/04/2008 08/08/2008 7111402 IP Alert and Notification System Testing EP Baseline Inspectio 08/04/2008 08/08/2008 7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 08/04/2008 08/08/2008 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/04/2008 08/08/2008 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/04/2008 08/08/2008 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/04/2008 08/08/2008 71151-EP03 IP Alert & Notification System 1

2515/172

- TI 2515/172 RCS WELD INSPECTION Generic Safety Inspec 08/11/2008 08/15/2008 2515/172 IP Reactor Coolant System Dissimiliar Metal Butt Welds 3

BI ENG

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 08/25/2008 09/12/2008 7111105T IP Fire Protection [Triennial]

Kewaunee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 2

BI OL

- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 10/13/2008 10/17/2008 7111111B IP Licensed Operator Requalification Program 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 11/03/2008 11/07/2008 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems report does not include INPO and OUTAGE activities