IR 05000305/2002001

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter - Kewaunee Nuclear Plant (Report 50-305/02-01)
ML020700263
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/04/2002
From: Lanksbury R
NRC/RGN-III/DRP/RPB5
To: Warner M
Nuclear Management Co
References
IR-02-001
Download: ML020700263 (5)


Text

March 4, 2002

SUBJECT:

ANNUAL ASSESSMENT LETTER - KEWAUNEE NUCLEAR PLANT (Report 50-305/02-01)

Dear Mr. Warner:

On January 31, 2001, the NRC staff completed its end-of-cycle plant performance assessment of the Kewaunee Nuclear Plant. The end-of-cycle review for Kewaunee involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from April 1 through December 31, 2001.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.

As discussed in our previous annual assessment letter dated May 31, 2001, this inspection and assessment cycle consisted of three quarters (i.e., the second, third, and fourth calendar quarters of calendar year 2001) instead of the usual four quarters. This change was implemented in order to align the inspection and assessment cycle with the calendar year beginning on January 1, 2002.

Overall, Kewaunee operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first two quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through March 31, 2003.

The enclosed inspection plan details the inspections scheduled through March 31, 2003. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The last 6 months of the inspection plan are tentative and may be revised at the Mid-Cycle Review meeting. In addition to the baseline inspection program, the NRC issued safeguards advisories recommending that nuclear power plant licensees go to the highest level of security immediately following the terrorist attacks on the World Trade Center and the Pentagon, and all promptly did so. With continued uncertainty about the possibility of additional terrorist activities, the Nation's nuclear power plants, including Kewaunee, remain at a high level of security. On February 25, 2002, the NRC issued an Order to all nuclear power plant licensees, requiring them to take certain additional interim compensatory measures to address the generalized high-level threat environment. These additional compensatory requirements will provide the NRC with reasonable assurance that public health and safety and the common defense and security continue to be adequately protected in the current generalized high-level threat environment. These requirements will remain in effect pending notification from the Commission that a significant change in the threat environment occurs, or until the Commission determines that other changes are needed following a more comprehensive re-evaluation of current safeguards and security programs. To date, we have monitored Kewaunees actions in response to the terrorist attacks through a series of audits. With the issuance of the Order, we will evaluate Kewaunees compliance with these interim requirements.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9631 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Roger D. Lanksbury, Chief Projects Branch 5 Division of Reactor Projects, Region 3 Docket No. 50-305 License No. DPR-43 Enclosure: Kewaunee Inspection/Activity Plan See Attached Distribution DOCUMENT NAME: G:\\EOC Ltrs\\2002\\Kew-eoc02.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII NAME MKunowski:co RLanksbury DATE 03/ /02 02/ /02 OFFICIAL RECORD COPY cc w/encl:

T. Coutu, Manager, Kewaunee Plant D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer ADAMS Distribution:

AJM DFT H. Nieh, OEDO T. Boyce, NRR Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Kewaunee DRPIII DRSIII PLB1 JRK1 BAH3

Kewaunee Inspection / Activity Plan 03/04/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/08/2002 06:50:47 Report 22

HTSINK B

- BIENNIAL HEAT SINK Baseline Inspections 03/04/2002 03/08/2002 Heat Sink Performance IP 7111107B

1 IP 71121

- ALARA & RP ACCESS CONTROL INSPECTION Baseline Inspections 03/18/2002 03/22/2002 Access Control to Radiologically Significant Areas IP 7112101

Baseline Inspections 03/18/2002 03/22/2002 ALARA Planning and Controls IP 7112102

Baseline Inspections 03/18/2002 03/22/2002 Performance Indicator Verification IP 71151

1 IP 71121

- RAD INSTRUMENTATION INSP Baseline Inspections 07/08/2002 07/12/2002 Access Control to Radiologically Significant Areas IP 7112101

Baseline Inspections 07/08/2002 07/12/2002 Radiation Monitoring Instrumentation IP 7112103

Baseline Inspections 07/08/2002 07/12/2002 Performance Indicator Verification IP 71151

3 FY 2002

- KEWAUNEE INIT PREP 07/2002 Not Applicable 07/29/2002 08/02/2002 OL - INITIAL EXAM - KEWAUNEE - JUL/AUG/SEP 2002 W90056

1 IP 71114

- EP BASELINE INSPECTION (NON-EXERCISE)

Baseline Inspections 08/12/2002 08/16/2002 Alert and Notification System Testing IP 7111402

Baseline Inspections 08/12/2002 08/16/2002 Emergency Response Organization Augmentation Testing IP 7111403

Baseline Inspections 08/12/2002 08/16/2002 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405

Baseline Inspections 08/12/2002 08/16/2002 Performance Indicator Verification IP 71151

2 71111.11

- LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 08/19/2002 08/23/2002 Licensed Operator Requalification IP 7111111B

3 FY 2002

- KEWAUNEE INIT EXAM 08&09/2002 Not Applicable 08/26/2002 09/13/2002 OL - INITIAL EXAM - KEWAUNEE - JUL/AUG/SEP 2002 W90056

1 IP 71122

- REMP & UNCONDITIONAL RELEASE INSP Baseline Inspections 09/16/2002 09/20/2002 Access Control to Radiologically Significant Areas IP 7112101

Baseline Inspections 09/16/2002 09/20/2002 Radiological Environmental Monitoring Program IP 7112203

Baseline Inspections 09/16/2002 09/20/2002 Performance Indicator Verification IP 71151

1 71130

- SAFEGUARDS INSPECTION-AA/AC/PI/PC Baseline Inspections 09/23/2002 09/27/2002 Access Authorization Program (Behavior Observation Only)

IP 7113001

Baseline Inspections 09/23/2002 09/27/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)

IP 7113002

Baseline Inspections 09/23/2002 09/27/2002 Security Plan Changes IP 7113004

Baseline Inspections 09/23/2002 09/27/2002 Performance Indicator Verification IP 71151

5 SSDI

- SAFETY SYSTEM DESIGN Baseline Inspections 10/21/2002 11/08/2002 Safety System Design and Performance Capability IP 7111121

1 MAINT B

- BIENNIAL MAINTENANCE RULE Baseline Inspections 12/02/2002 12/06/2002 Maintenance Rule Implementation IP 7111112B

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Kewaunee Inspection / Activity Plan 03/04/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/08/2002 06:50:47 Report 22

IP 71122

- RAD MATERIAL PROC/SHIPPING INSPECTION Baseline Inspections 02/10/2003 02/14/2003 Access Control to Radiologically Significant Areas IP 7112101

Baseline Inspections 02/10/2003 02/14/2003 Radioactive Material Processing and Transportation IP 7112202

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.