ML18031A160: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/03/1979
| issue date = 04/03/1979
| title = Provides Schedule for Responding to NRC 781215 Ltr Requesting Addl Info
| title = Provides Schedule for Responding to NRC 781215 Ltr Requesting Addl Info
| author name = CURTIS N W
| author name = Curtis N
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = PARR O D
| addressee name = Parr O
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESS1ON NBR:7904100346 DOC~DATE: 79/04/03 NOTARIZED:
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM                           (RIDS)
NO DOCKET FACIL:50~387 SUSQUEHANNA STEAN ELECTRIC STATIONS UNIT 1r PENNSYLVA 05000387 50-500 SUSQUEHANiVA STEAM ElECTRIC STATION, UNIT E~PENNSYLVA 050~AUTHNAblE AUTHOR Af f ILIAT ION CURTISP N~N~PENNSYLVANIA POWER&LIGHT CO~REC IP, NAME RECIPIENT AFF IL IA T ION PARRED 0'IGHT lA!ATER REACTORS BRANCH 3 SUBJECTS PROVIDES SCHEDULE FOR RESPONDING TO NRC 781215 LTR REQUESTING AOOL INFO'ISTRIBUTION CODE: B001B COPIES RECE'IVED e LTR~ENCL'~SIZE e TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE
ACCESS1ON     NBR:7904100346                                 DOC ~ DATE: 79/04/03         NOTARIZED: NO       DOCKET FACIL:50~387 SUSQUEHANNA STEAN ELECTRIC STATIONS UNIT 1r PENNSYLVA                                           05000387 50-500 SUSQUEHANiVA STEAM ElECTRIC STATION, UNIT E ~ PENNSYLVA AUTH NAblE                      AUTHOR Aff ILIATION 050~
~NOTES;~>WW~8 w 5 FSM+Al l RECIPIENT ID CODE/NAblE ACTION: 05 PM/4'u~BC i'NTERNAI.:
            'IGHT CURTISP N ~ N~                 PENNSYLVANIA POWER                       & LIGHT   CO ~
0&lP 06 I&E 09 GEOSC IEN BR 11 MECH ENG BR 13 MATL ENG BR 16 ANALYSIS BR'8 AUX SYS BR 20 I&C SYS BR 22 AD SITE TECH.27 EFFL TRT SYS 29 KIRK'WOOD AD PLANT SYS AD SITE ANLYSIS MPA EXTERNAL: 03 LPDR 30 ACRS COP IES l TTR ENCL 1 1 1 0 1 1 2 2 1 1 1 1 2 2 1 1 1'1 1 4 1'1~1 1 0 1 0 1'1 1 10 10 RECIPIENT IO CODEINAMIE AD PFASspCLo LA g~p~Q 02 NRC PDR 08 OPERA LIC BR 10 QAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 POINTER S Y S BR 26 ACCDNT ANLYS 28 RAD ASMT BR AD FOR ENG AD REAC SAFETY DIRECTOR NRR OELD 04 NSIC COPIES LTTR ENCl1 0 1 0 1 1-1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 0 1 0 0 1 1 C.71Z P)core.<<8 42 8(8+j~PA EP8 yz~g TOTAl, NUMBER OF COPIES REQUIRED: LTTR 49 ENCL 39 4
REC IP, NAME                     RECIPIENT AFF IL IA T ION PARRED 0                                               lA!ATER REACTORS         BRANCH 3 SUBJECTS     PROVIDES SCHEDULE FOR RESPONDING TO NRC 781215 LTR REQUESTING AOOL SIZE INFO'ISTRIBUTION CODE: B001B             COPIES RECE'IVED e LTR ~ ENCL' ~                   e TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE ~
TWO NORTH NIN'TH STREET, ALLENTOWN, PA.ISIOI PHONE((2I5) 821.5151 APR 3)Big hh.Olan D.Parr, Chief Light Water Reactors Branch No.3 Division of Project Management U.S.Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHAiViiA STEAM ELECTRIC STATION SCHEDULE FOR ADDITIONAL lid'ORMATION REQUEST DATED 1 2/15/78 ER 100450 FILE 841-2 PLA-340
NOTES;     ~>                   WW ~       8                 w 5         FSM     +   Al l RECIPIENT                               COP    IES              RECIPIENT          COPIES ID CODE/NAblE                             l    TTR ENCL          IO CODEINAMIE      LTTR ENCl ACTION:     05 PM             /4'u~                         1        1    AD PFASspCLo            1      0 BC                                               1        0    LA g~p~ Q              1      0 0
i'NTERNAI.:
                                  &lP                         1        1    02 NRC PDR                    1 06 I & E                                         2        2    08 OPERA LIC BR        1  -  1 09 GEOSC IEN BR                                   1        1    10  QAB                1      1 11   MECH ENG BR                                 1        1    12  STRUC ENG BR        1      1 13 MATL ENG BR                                   2        2    15  REAC SYS BR        1      1 16 ANALYSIS               BR'8 1        1    17  CORE PERF BR        1      1 AUX SYS BR                                   1              19  CONTAIN SYS        1      1 20 I & C SYS BR                                   1        1    21  POINTER  S YS  BR  1      1 22 AD SITE TECH.                                 4              26 ACCDNT ANLYS        1      1 27 EFFL TRT SYS                                   1'             28 RAD ASMT BR          1     1 29 KIRK'WOOD                                      1 ~
1     AD FOR ENG              1     0 AD PLANT SYS                                      1         0     AD REAC SAFETY          1      0 AD SITE              ANLYSIS                      1        0    DIRECTOR NRR           1      0 MPA                                                    '          OELD                           0 1
EXTERNAL: 03 LPDR                                              1         1     04 NSIC                1     1 30 ACRS                                          10        10 P)core.
                                <<8 C.71Z 42     8(
8+j ~PA EP8 yz   ~g TOTAl, NUMBER OF COPIES REQUIRED: LTTR                                       49   ENCL       39


==Dear Mr.Parr:==
4 TWO NORTH NIN'TH STREET, ALLENTOWN, PA. ISIOI    PHONE((2I5) 821.5151 APR    3  )Big hh. Olan D. Parr, Chief Light Water Reactors Branch No.        3 Division of Project    Management U. S. Nuclear Regulatory Commission Washington,    DC 20555 SUSQUEHAiViiA STEAM ELECTRIC STATION SCHEDULE FOR ADDITIONAL lid'ORMATION REQUEST DATED 1 2/15/78 ER 100450                                  FILE 841-2 PLA-340
In response to your letter of December 15, 1978, attached is a schedule for responding to the requested information.
 
If you have any questions please contact me.Very truly yours, N.W.Curtis Vice President-Engineering and Construction NWC/thm v804ZOOsgg
==Dear Mr. Parr:==
+(Pg PENNSYLVANIA POWER 8 L I GH T COPAPANY SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1978 January 22, 1979 372.1 372.2 372.3 372.4 372.5 372.6 372.7 372.8 372.9 372.10 372.11.372.12 372.13 372.14 372.15 372.16 372.17 372.18 372.19 372.20 372.21 372.22 372.23 372.24 372.25 372.26 372.27 372.28 February 28, 1979 362.13 362.14 362.16 March 30, 1979 232.2 361.5 April 30, 1979 232.3 313.1 313.2 313.3 313.4 313.7 313.8 313.9 361.3 361.4 362.15 362.17 362.18 Ma 31, 1979 121.1 121.2'21.3 121.4 121.5 121.6 121.7 231.3 231.4 331.5 331.6 331.7 331.8 331.9 331.10' Page 2 (Continued)
 
SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1979 October, 1979 313.5 313.6 A i}}
In response to your     letter of December 15, 1978, attached       is a schedule for responding to     the requested   information.
If you   have any questions   please contact     me.
Very   truly yours, N. W. Curtis Vice President   - Engineering   and   Construction NWC/thm v804ZOOsgg
                                                                                  +(Pg PENNSYLVANIA POWER     8 L I GH T COPAPANY
 
SUSQUEHANNA SES Schedule   for Responses to NRC Question   List of December   15, 1978 January 22, 1979 372. 1                     372. 8                372.15      372.22 372.2                      372. 9                372.16      372.23 372.3                      372. 10               372.17      372.24 372.4                      372.11                372.18      372.25 372.5                    . 372.12                372.19     372.26 372.6                      372.13                372.20      372.27 372.7                      372.14                372.21      372.28 February 28, 1979 362.13 362.14 362.16 March 30, 1979 232.2 361.5 April 30, 1979 232.3                      361. 3 313.1                       361. 4 313.2                       362.15 313.3                       362.17 313.4                       362.18 313.7 313.8 313.9 Ma   31, 1979 121.                                                     '
1                     231. 3                331.10 121. 2                     231.4
'21.3                       331.5 121.4                       331.6 121.5                      331.7 121.6                       331.8 121.7                       331.9
 
Page 2 (Continued)
SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1979 October, 1979 313.5 313.6
 
A i}}

Latest revision as of 16:15, 3 February 2020

Provides Schedule for Responding to NRC 781215 Ltr Requesting Addl Info
ML18031A160
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/03/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Parr O
Office of Nuclear Reactor Regulation
References
PLA-340, NUDOCS 7904100346
Download: ML18031A160 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESS1ON NBR:7904100346 DOC ~ DATE: 79/04/03 NOTARIZED: NO DOCKET FACIL:50~387 SUSQUEHANNA STEAN ELECTRIC STATIONS UNIT 1r PENNSYLVA 05000387 50-500 SUSQUEHANiVA STEAM ElECTRIC STATION, UNIT E ~ PENNSYLVA AUTH NAblE AUTHOR Aff ILIATION 050~

'IGHT CURTISP N ~ N~ PENNSYLVANIA POWER & LIGHT CO ~

REC IP, NAME RECIPIENT AFF IL IA T ION PARRED 0 lA!ATER REACTORS BRANCH 3 SUBJECTS PROVIDES SCHEDULE FOR RESPONDING TO NRC 781215 LTR REQUESTING AOOL SIZE INFO'ISTRIBUTION CODE: B001B COPIES RECE'IVED e LTR ~ ENCL' ~ e TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE ~

NOTES; ~> WW ~ 8 w 5 FSM + Al l RECIPIENT COP IES RECIPIENT COPIES ID CODE/NAblE l TTR ENCL IO CODEINAMIE LTTR ENCl ACTION: 05 PM /4'u~ 1 1 AD PFASspCLo 1 0 BC 1 0 LA g~p~ Q 1 0 0

i'NTERNAI.:

&lP 1 1 02 NRC PDR 1 06 I & E 2 2 08 OPERA LIC BR 1 - 1 09 GEOSC IEN BR 1 1 10 QAB 1 1 11 MECH ENG BR 1 1 12 STRUC ENG BR 1 1 13 MATL ENG BR 2 2 15 REAC SYS BR 1 1 16 ANALYSIS BR'8 1 1 17 CORE PERF BR 1 1 AUX SYS BR 1 19 CONTAIN SYS 1 1 20 I & C SYS BR 1 1 21 POINTER S YS BR 1 1 22 AD SITE TECH. 4 26 ACCDNT ANLYS 1 1 27 EFFL TRT SYS 1' 28 RAD ASMT BR 1 1 29 KIRK'WOOD 1 ~

1 AD FOR ENG 1 0 AD PLANT SYS 1 0 AD REAC SAFETY 1 0 AD SITE ANLYSIS 1 0 DIRECTOR NRR 1 0 MPA ' OELD 0 1

EXTERNAL: 03 LPDR 1 1 04 NSIC 1 1 30 ACRS 10 10 P)core.

<<8 C.71Z 42 8(

8+j ~PA EP8 yz ~g TOTAl, NUMBER OF COPIES REQUIRED: LTTR 49 ENCL 39

4 TWO NORTH NIN'TH STREET, ALLENTOWN, PA. ISIOI PHONE((2I5) 821.5151 APR 3 )Big hh. Olan D. Parr, Chief Light Water Reactors Branch No. 3 Division of Project Management U. S. Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHAiViiA STEAM ELECTRIC STATION SCHEDULE FOR ADDITIONAL lid'ORMATION REQUEST DATED 1 2/15/78 ER 100450 FILE 841-2 PLA-340

Dear Mr. Parr:

In response to your letter of December 15, 1978, attached is a schedule for responding to the requested information.

If you have any questions please contact me.

Very truly yours, N. W. Curtis Vice President - Engineering and Construction NWC/thm v804ZOOsgg

+(Pg PENNSYLVANIA POWER 8 L I GH T COPAPANY

SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1978 January 22, 1979 372. 1 372. 8 372.15 372.22 372.2 372. 9 372.16 372.23 372.3 372. 10 372.17 372.24 372.4 372.11 372.18 372.25 372.5 . 372.12 372.19 372.26 372.6 372.13 372.20 372.27 372.7 372.14 372.21 372.28 February 28, 1979 362.13 362.14 362.16 March 30, 1979 232.2 361.5 April 30, 1979 232.3 361. 3 313.1 361. 4 313.2 362.15 313.3 362.17 313.4 362.18 313.7 313.8 313.9 Ma 31, 1979 121. '

1 231. 3 331.10 121. 2 231.4

'21.3 331.5 121.4 331.6 121.5 331.7 121.6 331.8 121.7 331.9

Page 2 (Continued)

SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1979 October, 1979 313.5 313.6

A i