ML18031A160
| ML18031A160 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/03/1979 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Parr O Office of Nuclear Reactor Regulation |
| References | |
| PLA-340, NUDOCS 7904100346 | |
| Download: ML18031A160 (6) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESS1ON NBR:7904100346 DOC ~ DATE: 79/04/03 NOTARIZED:
NO DOCKET FACIL:50~387 SUSQUEHANNA STEAN ELECTRIC STATIONS UNIT 1r PENNSYLVA 05000387 50-500 SUSQUEHANiVA STEAM ElECTRIC STATION, UNIT E ~
PENNSYLVA 050~
AUTHNAblE AUTHOR Aff ILIATION CURTISP N ~ N ~
PENNSYLVANIA POWER
& LIGHT CO ~
REC IP, NAME RECIPIENT AFF ILIAT ION PARRED 0'IGHT lA!ATER REACTORS BRANCH 3 SUBJECTS PROVIDES SCHEDULE FOR RESPONDING TO NRC 781215 LTR REQUESTING AOOL INFO'ISTRIBUTION CODE:
B001B COPIES RECE'IVED e LTR
~
ENCL'
~
SIZE e
TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE
~
NOTES; ~>
WW ~
8 w 5 FSM
+
All RECIPIENT ID CODE/NAblE ACTION:
05 PM /4'u~
BC i'NTERNAI.:
0
&lP 06 I E
09 GEOSC IEN BR 11 MECH ENG BR 13 MATL ENG BR 16 ANALYSIS BR'8 AUX SYS BR 20 I C
SYS BR 22 AD SITE TECH.
27 EFFL TRT SYS 29 KIRK'WOOD AD PLANT SYS AD SITE ANLYSIS MPA EXTERNAL: 03 LPDR 30 ACRS COP IES l TTR ENCL 1
1 1
0 1
1 2
2 1
1 1
1 2
2 1
1 1
1 1
41' 1
~
1 1
0 1
0 1
1 1
10 10 RECIPIENT IO CODEINAMIE AD PFASspCLo LA g~p~ Q 02 NRC PDR 08 OPERA LIC BR 10 QAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 POINTER S Y S BR 26 ACCDNT ANLYS 28 RAD ASMT BR AD FOR ENG AD REAC SAFETY DIRECTOR NRR OELD 04 NSIC COPIES LTTR ENCl 1
0 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 0
1 0
1 0
0 1
1 C.71ZP)core.
<<8 42 8(
8+j~PA EP8 yz ~g TOTAl, NUMBER OF COPIES REQUIRED:
LTTR 49 ENCL 39
4
TWO NORTH NIN'TH STREET, ALLENTOWN, PA. ISIOI PHONE((2I5) 821.5151 APR 3 )Big hh. Olan D. Parr, Chief Light Water Reactors Branch No.
3 Division of Project Management U. S. Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHAiViiA STEAM ELECTRIC STATION SCHEDULE FOR ADDITIONAL lid'ORMATION REQUEST DATED 1 2/15/78 ER 100450 FILE 841-2 PLA-340
Dear Mr. Parr:
In response to your letter of December 15, 1978, attached is a schedule for responding to the requested information.
If you have any questions please contact me.
Very truly yours, N.
W. Curtis Vice President - Engineering and Construction NWC/thm v804ZOOsgg
+(Pg PENNSYLVANIA POWER 8
L I GH T COPAPANY
SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1978 January 22, 1979 372. 1 372.2 372.3 372.4 372.5 372.6 372.7 372. 8 372. 9 372. 10 372.11
. 372.12 372.13 372.14 372.15 372.16 372.17 372.18 372.19 372.20 372.21 372.22 372.23 372.24 372.25 372.26 372.27 372.28 February 28, 1979 362.13 362.14 362.16 March 30, 1979 232.2 361.5 April 30, 1979 232.3 313.1 313.2 313.3 313.4 313.7 313.8 313.9 361. 3 361. 4 362.15 362.17 362.18 Ma 31, 1979 121. 1 121. 2
'21.3 121.4 121.5 121.6 121.7 231. 3 231.4 331.5 331.6 331.7 331.8 331.9 331.10
Page 2 (Continued)
SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1979
- October, 1979 313.5 313.6
A i