ML18031A160

From kanterella
Jump to navigation Jump to search
Provides Schedule for Responding to NRC Requesting Addl Info
ML18031A160
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/03/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Parr O
Office of Nuclear Reactor Regulation
References
PLA-340, NUDOCS 7904100346
Download: ML18031A160 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESS1ON NBR:7904100346 DOC ~ DATE: 79/04/03 NOTARIZED:

NO DOCKET FACIL:50~387 SUSQUEHANNA STEAN ELECTRIC STATIONS UNIT 1r PENNSYLVA 05000387 50-500 SUSQUEHANiVA STEAM ElECTRIC STATION, UNIT E ~

PENNSYLVA 050~

AUTHNAblE AUTHOR Aff ILIATION CURTISP N ~ N ~

PENNSYLVANIA POWER

& LIGHT CO ~

REC IP, NAME RECIPIENT AFF ILIAT ION PARRED 0'IGHT lA!ATER REACTORS BRANCH 3 SUBJECTS PROVIDES SCHEDULE FOR RESPONDING TO NRC 781215 LTR REQUESTING AOOL INFO'ISTRIBUTION CODE:

B001B COPIES RECE'IVED e LTR

~

ENCL'

~

SIZE e

TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE

~

NOTES; ~>

WW ~

8 w 5 FSM

+

All RECIPIENT ID CODE/NAblE ACTION:

05 PM /4'u~

BC i'NTERNAI.:

0

&lP 06 I E

09 GEOSC IEN BR 11 MECH ENG BR 13 MATL ENG BR 16 ANALYSIS BR'8 AUX SYS BR 20 I C

SYS BR 22 AD SITE TECH.

27 EFFL TRT SYS 29 KIRK'WOOD AD PLANT SYS AD SITE ANLYSIS MPA EXTERNAL: 03 LPDR 30 ACRS COP IES l TTR ENCL 1

1 1

0 1

1 2

2 1

1 1

1 2

2 1

1 1

1 1

41' 1

~

1 1

0 1

0 1

1 1

10 10 RECIPIENT IO CODEINAMIE AD PFASspCLo LA g~p~ Q 02 NRC PDR 08 OPERA LIC BR 10 QAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 POINTER S Y S BR 26 ACCDNT ANLYS 28 RAD ASMT BR AD FOR ENG AD REAC SAFETY DIRECTOR NRR OELD 04 NSIC COPIES LTTR ENCl 1

0 1

0 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 0

1 0

1 0

0 1

1 C.71ZP)core.

<<8 42 8(

8+j~PA EP8 yz ~g TOTAl, NUMBER OF COPIES REQUIRED:

LTTR 49 ENCL 39

4

TWO NORTH NIN'TH STREET, ALLENTOWN, PA. ISIOI PHONE((2I5) 821.5151 APR 3 )Big hh. Olan D. Parr, Chief Light Water Reactors Branch No.

3 Division of Project Management U. S. Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHAiViiA STEAM ELECTRIC STATION SCHEDULE FOR ADDITIONAL lid'ORMATION REQUEST DATED 1 2/15/78 ER 100450 FILE 841-2 PLA-340

Dear Mr. Parr:

In response to your letter of December 15, 1978, attached is a schedule for responding to the requested information.

If you have any questions please contact me.

Very truly yours, N.

W. Curtis Vice President - Engineering and Construction NWC/thm v804ZOOsgg

+(Pg PENNSYLVANIA POWER 8

L I GH T COPAPANY

SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1978 January 22, 1979 372. 1 372.2 372.3 372.4 372.5 372.6 372.7 372. 8 372. 9 372. 10 372.11

. 372.12 372.13 372.14 372.15 372.16 372.17 372.18 372.19 372.20 372.21 372.22 372.23 372.24 372.25 372.26 372.27 372.28 February 28, 1979 362.13 362.14 362.16 March 30, 1979 232.2 361.5 April 30, 1979 232.3 313.1 313.2 313.3 313.4 313.7 313.8 313.9 361. 3 361. 4 362.15 362.17 362.18 Ma 31, 1979 121. 1 121. 2

'21.3 121.4 121.5 121.6 121.7 231. 3 231.4 331.5 331.6 331.7 331.8 331.9 331.10

Page 2 (Continued)

SUSQUEHANNA SES Schedule for Responses to NRC Question List of December 15, 1979

October, 1979 313.5 313.6

A i