ML16242A335: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 08/31/2016 | | issue date = 08/31/2016 | ||
| title = Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005) | | title = Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005) | ||
| author name = Warnick | | author name = Warnick G | ||
| author affiliation = NRC/RGN-IV/DRP/RPB-C | | author affiliation = NRC/RGN-IV/DRP/RPB-C | ||
| addressee name = Fallacara V | | addressee name = Fallacara V | ||
Line 9: | Line 9: | ||
| docket = 05000416 | | docket = 05000416 | ||
| license number = NPF-029 | | license number = NPF-029 | ||
| contact person = Warnick | | contact person = Warnick G | ||
| document report number = IR 2016005 | | document report number = IR 2016005 | ||
| document type = Inspection Plan, Inspection Report, Letter | | document type = Inspection Plan, Inspection Report, Letter | ||
| page count = 6 | | page count = 6 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000416/2016005]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011- | {{#Wiki_filter:UNITED STATES | ||
the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Licensee Response Column of the | NUCLEAR REGULATORY COMMISSION | ||
Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. | REGION IV | ||
you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | 1600 E LAMAR BLVD | ||
ARLINGTON, TX 76011-4511 | |||
August 31, 2016 | |||
Mr. Vin Fallacara | |||
Acting Site Vice President Operations | |||
Entergy Operations, Inc. | |||
Grand Gulf Nuclear Station | |||
P.O. Box 756 | |||
Port Gibson, MS 39150 | |||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION | |||
(REPORT 05000416/2016005) | |||
Dear Mr. Fallacara: | |||
On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle | |||
performance review of Grand Gulf Nuclear Station. The NRC reviewed the most recent | |||
quarterly performance indicators (PIs) in addition to inspection results and enforcement actions | |||
from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of | |||
your facility during this period and its plans for future inspections at your facility. | |||
The NRC determined that overall, Grand Gulf Nuclear Station operated in a manner that | |||
preserved public health and safety and met all cornerstone objectives. The NRC determined | |||
the performance at Grand Gulf Nuclear Station during the most recent quarter was within the | |||
Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix | |||
because all inspection findings had very low (i.e., green) safety significance, and all PIs | |||
indicated that your performance was within the nominal, expected range (i.e., green). | |||
Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | |||
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine | |||
inspections performed by resident inspectors are not included in the inspection plan. The | |||
inspections listed during the second half of the inspection plan are tentative and may be revised | |||
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the | |||
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact | |||
you as soon as possible to discuss changes to the inspection plan should circumstances | |||
warrant any changes. This inspection plan does not include security related inspections, which | |||
will be sent via separate, non-publicly available correspondence. | |||
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order | |||
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design- | |||
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to | |||
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts | |||
towards compliance with these Orders, and the information gathered will aid staff in | |||
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the | |||
V. Fallacara -2- | |||
Letter to Mr. Vin Fallacara from Greg Warnick dated August 31, 2016 | Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff | ||
will confirm through inspections the full implementation of the orders mentioned above by | |||
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies | |||
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness | |||
Communication/Staffing/Multi-Unit Dose Assessment Plans. | |||
As indicated in our annual assessment letter (ML16061A361) dated March 2, 2016, from | |||
January 1 to December 31, 2015, the NRC issued seven Severity Level IV traditional | |||
enforcement violations associated with impeding the regulatory process. Therefore, the NRC | |||
plans to conduct Inspection Procedure 92723, Follow up Inspection for Three or More Severity | |||
Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to assess | |||
your evaluation of these violations and review the adequacy of associated corrective actions. | |||
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the | |||
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the | |||
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning | |||
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue | |||
to conduct quarterly assessment meetings and communicate changes in the assessment of | |||
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, | |||
Operating Reactor Assessment Program. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs | |||
Rules of Practice, a copy of this letter will be available electronically for public inspection in the | |||
NRC Public Document Room or from the Publicly Available Records (PARS) component of | |||
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public | |||
Electronic Reading Room). | |||
Please contact me at 817-200-1144 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Greg Warnick, Branch Chief | |||
Project Branch C | |||
Division of Reactor Projects | |||
Docket No. 50-416 | |||
License No. NPF-29 | |||
Enclosure: | |||
Grand Gulf Nuclear Station | |||
Inspection/Activity Plan | |||
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information GG | |||
Page 1 of 2 Grand Gulf | |||
08/30/2016 09:35:11 Inspection / Activity Plan | |||
Report 22 | |||
07/01/2016 - 06/30/2018 | |||
Unit Planned Dates No. of Staff | |||
Number Start End Inspection Activity Title on Site | |||
IP 92723 - IP 92723 FOLLOW UP FOR SL IV TE 1 | |||
1 09/26/2016 09/30/2016 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S | |||
EB1-07T - GG HEAT SINK PERFORMANCE INSPECTION 1 | |||
1 09/19/2016 09/23/2016 IP 7111107T Heat Sink Performance | |||
EB1-17T - GG PERM PLANT MODS & 50.59 INSPECTION 5 | |||
1 10/17/2016 11/04/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications | |||
RS 24 - RADIATION SAFETY 2 | |||
1 11/07/2016 11/11/2016 IP 71124.02 Occupational ALARA Planning and Controls | |||
1 11/07/2016 11/11/2016 IP 71124.04 Occupational Dose Assessment | |||
EP-1 - EP PERFORMANCE INDICATORS 1 | |||
1 12/12/2016 12/12/2016 IP 71151-EP01 Drill/Exercise Performance | |||
1 12/12/2016 12/12/2016 IP 71151-EP02 ERO Readiness | |||
1 12/12/2016 12/12/2016 IP 71151-EP03 Alert & Notification System Reliability | |||
EP3 - EP PROGRAM INSPECTION (POSTPONE 2016) 1 | |||
1 01/09/2017 01/13/2017 IP 7111402 Alert and Notification System Testing | |||
1 01/09/2017 01/13/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System | |||
1 01/09/2017 01/13/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes | |||
1 01/09/2017 01/13/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies | |||
RS 13 PI - RADIATION SAFETY 2 | |||
1 02/13/2017 02/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | |||
1 02/13/2017 02/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation | |||
1 02/13/2017 02/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness | |||
1 02/13/2017 02/17/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences | |||
EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 | |||
1 04/03/2017 04/07/2017 IP 7111105T Fire Protection [Triennial] | |||
1 04/17/2017 04/28/2017 IP 7111105T Fire Protection [Triennial] | |||
EP-2 - BIENNIAL EP EXERCISE INSPECTION 4 | |||
1 03/27/2017 03/31/2017 IP 7111401 Exercise Evaluation | |||
1 03/27/2017 03/31/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes | |||
EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1 | |||
1 03/27/2017 03/31/2017 IP 71151-EP01 Drill/Exercise Performance | |||
1 03/27/2017 03/31/2017 IP 71151-EP02 ERO Readiness | |||
1 03/27/2017 03/31/2017 IP 71151-EP03 Alert & Notification System Reliability | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Enclosure | |||
Official Use Only - Sensitive Internal Information/Security-Related Information | |||
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information GG | |||
Page 2 of 2 Grand Gulf | |||
08/30/2016 09:35:11 Inspection / Activity Plan | |||
Report 22 | |||
07/01/2016 - 06/30/2018 | |||
Unit Planned Dates No. of Staff | |||
Number Start End Inspection Activity Title on Site | |||
EXAM - INITIAL EXAM 3 | |||
1 04/10/2017 04/14/2017 X02613 INITIAL EXAM GG( 4/17) | |||
1 05/08/2017 05/12/2017 X02613 INITIAL EXAM GG( 4/17) | |||
EXAM - INITIAL LICENSED OPERATOR EXAM 4 | |||
1 10/30/2017 11/03/2017 X02598 INITIAL EXAM GRAND GULF (12/2017) | |||
1 12/04/2017 12/08/2017 X02598 INITIAL EXAM GRAND GULF (12/2017) | |||
ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH) 1 | |||
1 07/01/2017 07/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants | |||
RS 5678 - RS TEAM 5 | |||
1 07/10/2017 07/14/2017 IP 71124.05 Radiation Monitoring Instrumentation | |||
1 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment | |||
1 07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program | |||
1 07/10/2017 07/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation | |||
BRQ - BRQ INSPECTION 3 | |||
1 08/07/2017 08/11/2017 IP 7111111B Licensed Operator Requalification Program | |||
EB1-21M - GG DESIGN BASIS INSPECTION 3 | |||
1 09/11/2017 10/13/2017 IP 7111121M Component Design Bases Inspection (Teams) | |||
TSB 52B - BIENNIAL PI&R 4 | |||
1 10/30/2017 11/03/2017 IP 71152B Problem Identification and Resolution | |||
1 11/13/2017 11/17/2017 IP 71152B Problem Identification and Resolution | |||
71111.08 - INSERVICE INSPECTION R20 1 | |||
1 03/05/2018 03/09/2018 IP 7111108G Inservice Inspection Activities - BWR | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Enclosure | |||
Official Use Only - Sensitive Internal Information/Security-Related Information | |||
ML16242A335 | |||
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: | |||
By: CHY Yes No Non-Publicly Available Sensitive NRC-002 | |||
OFFICE DRP:C/SPE DRS: D DRP: D DRP:PBC | |||
NAME CYoung AVegel TPruett GWarnick | |||
SIGNATURE /RA/ /RA/JClark,for /RA/ /RA/ | |||
DATE 8/15/16 8/17/16 8/18/16 8/29/16 | |||
Letter to Mr. Vin Fallacara from Greg Warnick dated August 31, 2016 | |||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION | |||
(REPORT 05000416/2016005) | |||
DISTRIBUTION: | |||
Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
Deputy Regional Administrator (Scott.Morris@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Matt.Young@nrc.gov) | |||
Resident Inspector (Neil.Day@nrc.gov) | |||
Administrative Assistant (Yvonne.Dubay@nrc.gov) | |||
Branch Chief, DRP/C (Greg.Warnick@nrc.gov) | |||
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov) | |||
Project Engineer (Michael.Stafford@nrc.gov) | |||
Project Engineer (Lindsay.Brandt@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (James.Kim@nrc.gov) | |||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | |||
RIV RSLO (Bill.Maier@nrc.gov) | |||
Director, DIRS, NRR (Chris.Miller@nrc.gov) | |||
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) | |||
Director, DORL, NRR (Anne.Boland@nrc.gov) | |||
Deputy Director, DORL, NRR (George.Wilson@nrc.gov) | |||
Director, NSIR (Brian.Holian@nrc.gov) | |||
Director, DPR, NSIR (Marissa.Bailey@nrc.gov) | |||
DRP Branch Chiefs (R4DRPBC@nrc.gov) | |||
DRS Branch Chiefs (R4DRSBC@nrc.gov) | |||
ROPreports.Resource@nrc.gov | |||
ROPassessment.Resource@nrc.gov | |||
}} | }} |
Latest revision as of 15:42, 30 October 2019
ML16242A335 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 08/31/2016 |
From: | Greg Warnick NRC/RGN-IV/DRP/RPB-C |
To: | Fallacara V Entergy Operations |
Warnick G | |
References | |
IR 2016005 | |
Download: ML16242A335 (6) | |
See also: IR 05000416/2016005
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
August 31, 2016
Mr. Vin Fallacara
Acting Site Vice President Operations
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION
(REPORT 05000416/2016005)
Dear Mr. Fallacara:
On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
performance review of Grand Gulf Nuclear Station. The NRC reviewed the most recent
quarterly performance indicators (PIs) in addition to inspection results and enforcement actions
from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of
your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Grand Gulf Nuclear Station operated in a manner that
preserved public health and safety and met all cornerstone objectives. The NRC determined
the performance at Grand Gulf Nuclear Station during the most recent quarter was within the
Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix
because all inspection findings had very low (i.e., green) safety significance, and all PIs
indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the second half of the inspection plan are tentative and may be revised
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
you as soon as possible to discuss changes to the inspection plan should circumstances
warrant any changes. This inspection plan does not include security related inspections, which
will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
towards compliance with these Orders, and the information gathered will aid staff in
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
V. Fallacara -2-
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff
will confirm through inspections the full implementation of the orders mentioned above by
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
Communication/Staffing/Multi-Unit Dose Assessment Plans.
As indicated in our annual assessment letter (ML16061A361) dated March 2, 2016, from
January 1 to December 31, 2015, the NRC issued seven Severity Level IV traditional
enforcement violations associated with impeding the regulatory process. Therefore, the NRC
plans to conduct Inspection Procedure 92723, Follow up Inspection for Three or More Severity
Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to assess
your evaluation of these violations and review the adequacy of associated corrective actions.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
to conduct quarterly assessment meetings and communicate changes in the assessment of
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Please contact me at 817-200-1144 with any questions you have regarding this letter.
Sincerely,
/RA/
Greg Warnick, Branch Chief
Project Branch C
Division of Reactor Projects
Docket No. 50-416
License No. NPF-29
Enclosure:
Grand Gulf Nuclear Station
Inspection/Activity Plan
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information GG
Page 1 of 2 Grand Gulf
08/30/2016 09:35:11 Inspection / Activity Plan
Report 22
07/01/2016 - 06/30/2018
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
IP 92723 - IP 92723 FOLLOW UP FOR SL IV TE 1
1 09/26/2016 09/30/2016 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S
EB1-07T - GG HEAT SINK PERFORMANCE INSPECTION 1
1 09/19/2016 09/23/2016 IP 7111107T Heat Sink Performance
EB1-17T - GG PERM PLANT MODS & 50.59 INSPECTION 5
1 10/17/2016 11/04/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
RS 24 - RADIATION SAFETY 2
1 11/07/2016 11/11/2016 IP 71124.02 Occupational ALARA Planning and Controls
1 11/07/2016 11/11/2016 IP 71124.04 Occupational Dose Assessment
EP-1 - EP PERFORMANCE INDICATORS 1
1 12/12/2016 12/12/2016 IP 71151-EP01 Drill/Exercise Performance
1 12/12/2016 12/12/2016 IP 71151-EP02 ERO Readiness
1 12/12/2016 12/12/2016 IP 71151-EP03 Alert & Notification System Reliability
EP3 - EP PROGRAM INSPECTION (POSTPONE 2016) 1
1 01/09/2017 01/13/2017 IP 7111402 Alert and Notification System Testing
1 01/09/2017 01/13/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
1 01/09/2017 01/13/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes
1 01/09/2017 01/13/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
1 02/13/2017 02/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1 02/13/2017 02/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
1 02/13/2017 02/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness
1 02/13/2017 02/17/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences
EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4
1 04/03/2017 04/07/2017 IP 7111105T Fire Protection [Triennial]
1 04/17/2017 04/28/2017 IP 7111105T Fire Protection [Triennial]
EP-2 - BIENNIAL EP EXERCISE INSPECTION 4
1 03/27/2017 03/31/2017 IP 7111401 Exercise Evaluation
1 03/27/2017 03/31/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes
EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1
1 03/27/2017 03/31/2017 IP 71151-EP01 Drill/Exercise Performance
1 03/27/2017 03/31/2017 IP 71151-EP02 ERO Readiness
1 03/27/2017 03/31/2017 IP 71151-EP03 Alert & Notification System Reliability
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Official Use Only - Sensitive Internal Information/Security-Related Information
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information GG
Page 2 of 2 Grand Gulf
08/30/2016 09:35:11 Inspection / Activity Plan
Report 22
07/01/2016 - 06/30/2018
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
EXAM - INITIAL EXAM 3
1 04/10/2017 04/14/2017 X02613 INITIAL EXAM GG( 4/17)
1 05/08/2017 05/12/2017 X02613 INITIAL EXAM GG( 4/17)
EXAM - INITIAL LICENSED OPERATOR EXAM 4
1 10/30/2017 11/03/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)
1 12/04/2017 12/08/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)
ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH) 1
1 07/01/2017 07/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
RS 5678 - RS TEAM 5
1 07/10/2017 07/14/2017 IP 71124.05 Radiation Monitoring Instrumentation
1 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment
1 07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program
1 07/10/2017 07/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
BRQ - BRQ INSPECTION 3
1 08/07/2017 08/11/2017 IP 7111111B Licensed Operator Requalification Program
EB1-21M - GG DESIGN BASIS INSPECTION 3
1 09/11/2017 10/13/2017 IP 7111121M Component Design Bases Inspection (Teams)
1 10/30/2017 11/03/2017 IP 71152B Problem Identification and Resolution
1 11/13/2017 11/17/2017 IP 71152B Problem Identification and Resolution
71111.08 - INSERVICE INSPECTION R20 1
1 03/05/2018 03/09/2018 IP 7111108G Inservice Inspection Activities - BWR
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Official Use Only - Sensitive Internal Information/Security-Related Information
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: CHY Yes No Non-Publicly Available Sensitive NRC-002
OFFICE DRP:C/SPE DRS: D DRP: D DRP:PBC
NAME CYoung AVegel TPruett GWarnick
SIGNATURE /RA/ /RA/JClark,for /RA/ /RA/
DATE 8/15/16 8/17/16 8/18/16 8/29/16
Letter to Mr. Vin Fallacara from Greg Warnick dated August 31, 2016
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION
(REPORT 05000416/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Neil.Day@nrc.gov)
Administrative Assistant (Yvonne.Dubay@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Project Engineer (Lindsay.Brandt@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (James.Kim@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov