ML17244A190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/03/1978
| issue date = 11/03/1978
| title = Notifies That Provisional Oper Lic#DPR-18 Issued on 780328 Omitted Tech Specs for Piping Penetrations W/Expansion Bellows.Leakage Testing W/Air Medium Is Not Req for Containment Penetration Sys
| title = Notifies That Provisional Oper Lic#DPR-18 Issued on 780328 Omitted Tech Specs for Piping Penetrations W/Expansion Bellows.Leakage Testing W/Air Medium Is Not Req for Containment Penetration Sys
| author name = WHITE L D
| author name = White L
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = ZIEMANN D L
| addressee name = Ziemann D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PoI=/'-.REGULATORNFORMATIONDISTRIBUTIONTEMDOCKETNBR:50-244REGINNA1RECIPIENT:NIEMANN,D.L.ORIGINATORWHITE~LD~COMPANYROCHESTERGAS6rELEC
{{#Wiki_filter:Po I=/'-.
REGULATOR        N FORMATION D IS TRI BUTION    TEM DOCKET NBR:50-244 RE GINNA 1                      DOC  DATE:    781103 RECIPIENT:     NIEMANN, D. L.                     ACCESSION NBR:      7811130232 ORIGINATOR      WHITE ~ L D ~                     COPIES RECEIVED:
COMPANY        ROCHESTER GAS    6r  ELEC          LTR              'NCL


==SUBJECT:==
==SUBJECT:==
NotifiesthatProvisionalOperDOCDATE:781103ACCESSIONNBR:7811130232COPIESRECEIVED:LTR'NCLSIZE:LicgDPR-18issuedon780328omittedTechSpecsforpipingpenetrationsw/expansionbellows.Leakagetestingw/airmediumisnotreqforcontainmentpenetrationsys.DISTR~BUTTONCODEX'017DISTRIBUTIONTITLE$CONTAINMENTLEAKRATETESTINt'PPENDIXJ,NOTARIZRDNAMEBRCMIEFNRCPDRIJJE.OELnHANAUFRCONTAINMENTSYSTEMSADFORSYSLPROJENGINEERINGBRREACTnaSAFETYBRPLANTSYSTEMSBREEBMFAIRTILEEFFLUENTTREATSYSLPDR,TERANSICACRSENCL2W/7ENCLW/ENCLW/ENCLW/2ENCLll/F.NCLW/ENCLW/ENCLW/ENCLW/FNCL~J/ENCLW/ENCLW/ENCLW/FNCLW/ENCLW/ENCLH/ENCLW/ENCLW/ibENCLFORACTIONTOTALNUMBERDFCOPIESREQUIREDtLTRENCL4040NOTES:
SIZE:
Er ROCHESTERGASANDELECTRICCORPORATION~89EA5TAVENUE,ROCHESTER,N.Y.14649LEOND.WHITE,JR.YICCPRCSlOCNTTctcpHoNcancecooc7ia546-2700November3,1978DirectorofNuclearReactorRegulationoperatingReactorsBracnhlgGULATC,"Y'DQCf(ETRL~ECOpyU.S.NuclearRegulatoryCommissionWashington,D.C.20555
Notifies that Provisional Oper Lic gDPR-18 issued on            780328  omitted Tech Specs for piping penetrations w/ expansion bellows.             Leakage  testing w/air medium is not req for containment penetration sys.
DISTR~BUTTON    CODEX'017 DISTRIBUTION TITLE $                                         NOTARI ZRD CONTAINMENT LEAK RATE TEST      INt'PPENDIX J, NAME                    ENCL2                    FOR ACTION BR    CMIEF              W/7 ENCL W/ENCL NRC    PDR              W/ENCL I  JJ  E                W/2 ENCL
  . OELn                    ll/F.NCL HANAUFR                  W/ENCL CONTAINMENT SYSTEMS      W/ENCL AD FOR SYS L PROJ        W/ENCL ENGINEERING BR          W/FNCL REACTna SAFETY BR        ~J/ENCL PLANT SYSTEMS BR        W/ENCL EEB                      W/ENCL M  FAIRTILE              W/FNCL EFFLUENT TREAT SYS      W/ENCL LPDR                    W/ENCL
  ,TERA                      H/ENCL NSIC                    W/ENCL ACRS                    W/ib    ENCL TOTAL NUMBER DF COPIES        REQUIRED t LTR        40 ENCL      40 NOTES:


==DearMr.Ziemann:==
E r
Amendment17toProvisionalOperatingLicenseNo.DPR-18issuedonMarch28,1978includedcontainmentleakagetestrequirementsforcertaincontainmentpenetrations.DuetoanoversightnorequirementswereincludedforpipingpenetrationswithexpansionbellowseventhoughtherearepenetrationsofthistypeatR.E.Ginna.TestingofthesepenetrationshasbeenregularlyperformedinthepastandwillcontinuetobetestedasrequiredbyAppendixJto10CFRPart50.Atechnicalspecifi-cationwillbeproposedat.aconvenient,timetospecificallyincludetheserequirements.InaletterdatedSeptember21,1978RochesterGasandElectriccommittedtomodifythepipingofeightcontainmentpenetrations.Themodificationsaretoprovidethecapabilitytodrainfluidawayfromcontainmentisolationvalvesandassureexposureofthevalvestocontainmentairtestpressureduringleakagetestingofthosesystemswhichmaybeopentothecon-tainmentatmosphereunderpost-accidentconditions.However,leakagetestingofthecontainmentspraysystemisolationvalveswillcontinuetobeperformedwithwateronthevalvesinaccor-dancewithsectionIII.C.2ofAppendixJto10CFRPart50.Thissystemisnormallyfilledwithwaterandwillbeoperatingunderpost-accidentconditions.Inadditionsealwaterisprovidedbytheresidualheatremovalsystem,whichhasadischargeheadof120psigandiscapableofmaintainingthefluidpressureatthevalvesinexcessofthecontainmentpressure.Athirtydaysupplyofwaterisassuredbyrecyclingcontainmentsumpwaterthroughthecontainmentspraysystempipingbacktothecontain-ment.Thereforeleakagetestingwithanairmediumisnot.requiredforthissystem.OC.J(ETFI.'.";ySincerelyyours,L.D.White,Jr.}}
 
ROCHESTER GAS AND ELECTRIC CORPORATION    ~ 89 EA5 T AVEN UE, ROCH ES T ER, N.Y. 14649 LEON D. WHITE, JR.                                                      TctcpHoNc YICC PRCSlOCNT                                                ance cooc 7ia 546-2700 November 3, 1978 Director of Nuclear Reactor Regulation operating Reactors Bra cnhlgGULATC," Y'DQCf(ET RL~E COpy U.S. Nuclear Regulatory Commission Washington, D.C.          20555
 
==Dear Mr. Ziemann:==
 
Amendment 17 to Provisional Operating License No. DPR-18 issued on March 28, 1978 included containment leakage test requirements for certain containment penetrations.                   Due to an oversight no requirements were included for piping penetrations with expansion bellows even though there are penetrations of this type at R.E. Ginna. Testing of these penetrations has been regularly performed in the past and will continue to be tested as required by Appendix J to 10 CFR Part 50. A technical specifi-cation will be proposed at. a convenient, time to specifically include these requirements.
In    a  letter  dated September 21, 1978 Rochester Gas and Electric committed to modify the piping of eight containment penetrations. The modifications are to provide the capability to drain fluid away from containment isolation valves and assure exposure of the valves to containment air test pressure during leakage testing of those systems which may be open to the con-tainment atmosphere under post-accident conditions. However, leakage testing of the containment spray system isolation valves will continue to be performed with water on the valves in accor-dance with section III.C.2 of Appendix J to 10 CFR Part 50. This system is normally filled with water and will be operating under post-accident conditions. In addition seal water is provided by the residual heat removal system, which has a discharge head of 120 psig and is capable of maintaining the fluid pressure at the valves in excess of the containment pressure.               A thirty day supply of water is assured by recycling containment sump water through the containment spray system piping back to the contain-ment. Therefore leakage testing with an air medium is not.
required for this system.
Sincerely yours, OC.J(ET  FI.'.";y L. D. White, Jr.}}

Latest revision as of 21:14, 29 October 2019

Notifies That Provisional Oper Lic#DPR-18 Issued on 780328 Omitted Tech Specs for Piping Penetrations W/Expansion Bellows.Leakage Testing W/Air Medium Is Not Req for Containment Penetration Sys
ML17244A190
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/03/1978
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7811130232
Download: ML17244A190 (4)


Text

Po I=/'-.

REGULATOR N FORMATION D IS TRI BUTION TEM DOCKET NBR:50-244 RE GINNA 1 DOC DATE: 781103 RECIPIENT: NIEMANN, D. L. ACCESSION NBR: 7811130232 ORIGINATOR WHITE ~ L D ~ COPIES RECEIVED:

COMPANY ROCHESTER GAS 6r ELEC LTR 'NCL

SUBJECT:

SIZE:

Notifies that Provisional Oper Lic gDPR-18 issued on 780328 omitted Tech Specs for piping penetrations w/ expansion bellows. Leakage testing w/air medium is not req for containment penetration sys.

DISTR~BUTTON CODEX'017 DISTRIBUTION TITLE $ NOTARI ZRD CONTAINMENT LEAK RATE TEST INt'PPENDIX J, NAME ENCL2 FOR ACTION BR CMIEF W/7 ENCL W/ENCL NRC PDR W/ENCL I JJ E W/2 ENCL

. OELn ll/F.NCL HANAUFR W/ENCL CONTAINMENT SYSTEMS W/ENCL AD FOR SYS L PROJ W/ENCL ENGINEERING BR W/FNCL REACTna SAFETY BR ~J/ENCL PLANT SYSTEMS BR W/ENCL EEB W/ENCL M FAIRTILE W/FNCL EFFLUENT TREAT SYS W/ENCL LPDR W/ENCL

,TERA H/ENCL NSIC W/ENCL ACRS W/ib ENCL TOTAL NUMBER DF COPIES REQUIRED t LTR 40 ENCL 40 NOTES:

E r

ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EA5 T AVEN UE, ROCH ES T ER, N.Y. 14649 LEON D. WHITE, JR. TctcpHoNc YICC PRCSlOCNT ance cooc 7ia 546-2700 November 3, 1978 Director of Nuclear Reactor Regulation operating Reactors Bra cnhlgGULATC," Y'DQCf(ET RL~E COpy U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Ziemann:

Amendment 17 to Provisional Operating License No. DPR-18 issued on March 28, 1978 included containment leakage test requirements for certain containment penetrations. Due to an oversight no requirements were included for piping penetrations with expansion bellows even though there are penetrations of this type at R.E. Ginna. Testing of these penetrations has been regularly performed in the past and will continue to be tested as required by Appendix J to 10 CFR Part 50. A technical specifi-cation will be proposed at. a convenient, time to specifically include these requirements.

In a letter dated September 21, 1978 Rochester Gas and Electric committed to modify the piping of eight containment penetrations. The modifications are to provide the capability to drain fluid away from containment isolation valves and assure exposure of the valves to containment air test pressure during leakage testing of those systems which may be open to the con-tainment atmosphere under post-accident conditions. However, leakage testing of the containment spray system isolation valves will continue to be performed with water on the valves in accor-dance with section III.C.2 of Appendix J to 10 CFR Part 50. This system is normally filled with water and will be operating under post-accident conditions. In addition seal water is provided by the residual heat removal system, which has a discharge head of 120 psig and is capable of maintaining the fluid pressure at the valves in excess of the containment pressure. A thirty day supply of water is assured by recycling containment sump water through the containment spray system piping back to the contain-ment. Therefore leakage testing with an air medium is not.

required for this system.

Sincerely yours, OC.J(ET FI.'.";y L. D. White, Jr.