ML13263A192: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(10 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13263A192
| number = ML13263A192
| issue date = 09/24/2013
| issue date = 09/24/2013
| title = 10/23/2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 (TAC Nos. ME7522 and ME7523)
| title = Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2
| author name = Rankin J K
| author name = Rankin J
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Markley M T
| addressee name = Markley M
| addressee affiliation = NRC/NRR/DORL/LPLIV
| addressee affiliation = NRC/NRR/DORL/LPLIV
| docket = 05000275, 05000323
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| license number = DPR-080, DPR-082
| contact person = Rankin J K
| contact person = Rankin J
| case reference number = TAC ME7522, TAC ME7523
| case reference number = TAC ME7522, TAC ME7523
| document type = Meeting Agenda, Meeting Notice, Memoranda
| document type = Meeting Agenda, Meeting Notice, Memoranda
| page count = 4
| page count = 4
| project = TAC:ME7522, TAC:ME7523
| project = TAC:ME7522, TAC:ME7523
| stage =  
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 September 24, 2013 MEMORANDUM TO: FROM: SUBJECT: DATE & TIME: LOCATION: PURPOSE: Michael T. Markley, Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor Jennie K. Rankin, Project Manager . Plant Licensing Branch IV Division ofOperating Reactor licensing 0 Office of Nuclear Reactor FORTHCOMING MEETING WITH PACIFIC GAS ELECTRIC COMPANY REGARDING THE REPLACEMENT OF THE PROCESS PROTECTION (TAC NOS. ME7522 AND Wednesday, October 23, 1:00 p.m. -3:00 p.m. EDT (10:00 a.m. -12:00 p.m. PDT) U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-11806 Rockville, Maryland The purpose of the meeting is to discuss the license amendment request that Pacific Gas and Electrlc Company (PG&E, the licensee) submitted on October 26,2011, to the U.S. Nuclear Regulatory Comm'ission (NRC) for the Digital Replacement of the Process Protection System Portion of the Reactor Trip System (RTS) and Engineered Safety Features Actuation System (ESFAS) at Diablo Canyon Power Plant, Units 1 and 2 (publicly available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 113070457). This is one of several planned public meetings on this topic. This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920). May 28, 2002.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 September 24, 2013 MEMORANDUM TO:                 Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                          Jennie K. Rankin, Project Manager             .       ~~
-Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). PG&E R. Stattel, K. Schrader, et al. R. Alvarado, NRR J. Rankin, NRR, et al. Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail the meeting contact listed below before Tuesday, October 22, 2013, 4:30 p.m. EDT to get the telephone number and the pass code. MEETING Jennivine Rankin, NRR 301-415-1530 Jennivine.rankin@nrc.gov The NRC provides reasonable accommodation, on a case-by-case basis, to individuals with disabilities where appropriate upon request. To obtain a meeting notice, transcript, or other information in a special format (e.g., Braille, large print)" please notify the NRC's meeting contact listed above. ' , To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, individuals may discontinue receiving electronic distributions at any time by visiting the same web address above and selecting unsubscribe. Docket Nos. 50-275 and 50-323 Enclosure: Agenda cc w/encl: Distribution via Listserv L FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC REGARDING DIABLO CANYON POWER PLANT. UNITS 1 AND PROCESS PROTECTION SYSTEM DIGITAL Wednesday. October 23, 1:00 p.m. to 3:00 p.m. EDT (10:00 a.m. to 12:00 p.m. Opening comments and introductions Pacific Gas and Electric Company and U.S. Nuclear Regulatory Commission staff will review status and updates regarding the following for the licensee's amendment request submittal: Upcoming and completed regulatory audits Open and closed tracking items Project plan Future meeting planning IV. Questions from the public' V.' Adjourn Enclosure
Plant Licensing Branch IV                     ~nf1..!l\
-2 Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). PG&E R. Stattel, K. Schrader, et al. R. Alvarado, NRR J. Rankin, NRR, et al. Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail the meeting contact listed below before Tuesday, October 22, 2013,4:30 p.m. EDT to get the telephone number and-the pass code. MEETING Jennivine Rankin, The NRC provides reasonable accommodation, on a case-by-case basis, to individuals disabilities where appropriate upon request. To obtain a meeting notice, transcript, or information in a special format (e.g., Braille, large print), please notify the NRC's contact listed To receive a summary of this meeting and begin receiving other plant-specific distributions, subscribe to the Operating Reactor Correspondence electronic distribution for plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once individuals may discontinue receiving electronic distributions at any time by visiting the web address above and selecting unsubscribe. Docket Nos. 50-275 and 50-323 cc w/encl: Distribution via Listserv PUBLIC RStattel, LPL4 Reading SDarbali, RidsAcrsAcnw_MailCTR Resource TWertz, RidsNrrDeEicb Resource DRich, EDO RidsNrrDorl Resource RAlvarado, RidsNrrDorlLpl4 Resource VDricks, OPA RidsNrrLAJBurkhardt Resource WMaier, RidsNrrPMDiabloCanyon Resource TWFN RidsOpaMail Resource . OWFN Reception RidsRgn4MailCenter Resource ADAMS Accession No ML13263A192 OFFICE NRR/DORLlLPL4/PM NRRlDORLlLPL4/PM NRRIDORLlLPL4/LA NRR/DORLlLPL4/BC NRR/DORLlLPL4/PM NAME MBartlett JRankin JBurkhardt MMarkley (FLyon for) JRankin DATE 09/23/13 09/23/13 09/23/13 09/24/13 09/24/13 OFFICIAL RECORD COpy
Division of Operating Reactor licensing         0 '\f>'
}}
Office of Nuclear Reactor Regulation
 
==SUBJECT:==
FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING THE DIGITAL REPLACEMENT OF THE PROCESS PROTECTION SYSTEM (TAC NOS. ME7522 AND ME7523)
DATE & TIME:                  Wednesday, October 23, 2013 1:00 p.m. - 3:00 p.m. EDT (10:00 a.m. -12:00 p.m. PDT)
LOCATION:                      U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-11806 Rockville, Maryland PURPOSE:                      The purpose of the meeting is to discuss the license amendment request that Pacific Gas and Electrlc Company (PG&E, the licensee) submitted on October 26,2011, to the U.S. Nuclear Regulatory Comm'ission (NRC) for the Digital Replacement of the Process Protection System Portion of the Reactor Trip System (RTS) and Engineered Safety Features Actuation System (ESFAS) at Diablo Canyon Power Plant, Units 1 and 2 (publicly available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML113070457). This is one of several planned public meetings on this topic.
This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920). May 28, 2002.
 
                                                - 2 PARTICIPANTS:                  Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
PG&E R. Stattel, NRR                K. Schrader, et al.
R. Alvarado, NRR J. Rankin, NRR, et al.
Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail the meeting contact listed below before Tuesday, October 22, 2013, 4:30 p.m. EDT to get the telephone number and the pass code.
MEETING CONTACT:              Jennivine Rankin, NRR 301-415-1530 Jennivine.rankin@nrc.gov The NRC provides reasonable accommodation, on a case-by-case basis, to individuals with disabilities where appropriate upon request. To obtain a meeting notice, transcript, or other information in a special format (e.g., Braille, large print)" please notify the NRC's meeting contact listed above.                                                 ' ,
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, individuals may discontinue receiving electronic distributions at any time by visiting the same web address above and selecting unsubscribe.
Docket Nos. 50-275 and 50-323
 
==Enclosure:==
 
Agenda cc w/encl: Distribution via Listserv
 
AGENDA FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING DIABLO CANYON POWER PLANT. UNITS 1 AND 2 PROCESS PROTECTION SYSTEM DIGITAL REPLACEMENT Wednesday. October 23, 2013 1:00 p.m. to 3:00 p.m. EDT (10:00 a.m. to 12:00 p.m. PDT)
L    Opening comments and introductions II. Pacific Gas and Electric Company and U.S. Nuclear Regulatory Commission staff will review status and updates regarding the following for the licensee's amendment request submittal:
A      Upcoming and completed regulatory audits B.      Open and closed tracking items C.      Project plan III. Future meeting planning IV. Questions from the public' V.' Adjourn Enclosure
 
                                                      -2 PARTICIPANTS:                  Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
PG&E R. Stattel, NRR                  K. Schrader, et al.
R. Alvarado, NRR J. Rankin, NRR, et al.
Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail the meeting contact listed below before Tuesday, October 22, 2013,4:30 p.m.
EDT to get the telephone number and-the pass code.
MEETING CONTACT:                Jennivine Rankin, NRR 301-415-1530 Jennivine.rankin@nrc.gov The NRC provides reasonable accommodation, on a case-by-case basis, to individuals with disabilities where appropriate upon request. To obtain a meeting notice, transcript, or other information in a special format (e.g., Braille, large print), please notify the NRC's meeting contact listed above.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, individuals may discontinue receiving electronic distributions at any time by visiting the same web address above and selecting unsubscribe.
Docket Nos. 50-275 and 50-323
 
==Enclosure:==
 
Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC                                                 RStattel, NRRIDE/EICB LPL4 Reading                                           SDarbali, NRRlDE/EICB RidsAcrsAcnw_MailCTR Resource                           TWertz, NRR RidsNrrDeEicb Resource                                 DRich, EDO RIV RidsNrrDorl Resource                                   RAlvarado, NRR/DE/EICB RidsNrrDorlLpl4 Resource                               VDricks, OPA RIV RidsNrrLAJBurkhardt Resource                           WMaier, RIV RidsNrrPMDiabloCanyon Resource                         TWFN Reception l RidsOpaMail Resource                                 . OWFN Reception RidsRgn4MailCenter Resource ADAMS Accession No ML13263A192 OFFICE     NRR/DORLlLPL4/PM NRRlDORLlLPL4/PM NRRIDORLlLPL4/LA       NRR/DORLlLPL4/BC     NRR/DORLlLPL4/PM NAME       MBartlett         JRankin           JBurkhardt           MMarkley (FLyon for) JRankin DATE       09/23/13         09/23/13           09/23/13             09/24/13             09/24/13 OFFICIAL RECORD COpy}}

Latest revision as of 02:37, 20 March 2020

Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2
ML13263A192
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/24/2013
From: Jennivine Rankin
Plant Licensing Branch IV
To: Markley M
Plant Licensing Branch IV
Rankin J
References
TAC ME7522, TAC ME7523
Download: ML13263A192 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 September 24, 2013 MEMORANDUM TO: Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Jennie K. Rankin, Project Manager . ~~

Plant Licensing Branch IV ~nf1..!l\

Division of Operating Reactor licensing 0 '\f>'

Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING THE DIGITAL REPLACEMENT OF THE PROCESS PROTECTION SYSTEM (TAC NOS. ME7522 AND ME7523)

DATE & TIME: Wednesday, October 23, 2013 1:00 p.m. - 3:00 p.m. EDT (10:00 a.m. -12:00 p.m. PDT)

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-11806 Rockville, Maryland PURPOSE: The purpose of the meeting is to discuss the license amendment request that Pacific Gas and Electrlc Company (PG&E, the licensee) submitted on October 26,2011, to the U.S. Nuclear Regulatory Comm'ission (NRC) for the Digital Replacement of the Process Protection System Portion of the Reactor Trip System (RTS) and Engineered Safety Features Actuation System (ESFAS) at Diablo Canyon Power Plant, Units 1 and 2 (publicly available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML113070457). This is one of several planned public meetings on this topic.

This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920). May 28, 2002.

- 2 PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

PG&E R. Stattel, NRR K. Schrader, et al.

R. Alvarado, NRR J. Rankin, NRR, et al.

Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail the meeting contact listed below before Tuesday, October 22, 2013, 4:30 p.m. EDT to get the telephone number and the pass code.

MEETING CONTACT: Jennivine Rankin, NRR 301-415-1530 Jennivine.rankin@nrc.gov The NRC provides reasonable accommodation, on a case-by-case basis, to individuals with disabilities where appropriate upon request. To obtain a meeting notice, transcript, or other information in a special format (e.g., Braille, large print)" please notify the NRC's meeting contact listed above. ' ,

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, individuals may discontinue receiving electronic distributions at any time by visiting the same web address above and selecting unsubscribe.

Docket Nos. 50-275 and 50-323

Enclosure:

Agenda cc w/encl: Distribution via Listserv

AGENDA FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING DIABLO CANYON POWER PLANT. UNITS 1 AND 2 PROCESS PROTECTION SYSTEM DIGITAL REPLACEMENT Wednesday. October 23, 2013 1:00 p.m. to 3:00 p.m. EDT (10:00 a.m. to 12:00 p.m. PDT)

L Opening comments and introductions II. Pacific Gas and Electric Company and U.S. Nuclear Regulatory Commission staff will review status and updates regarding the following for the licensee's amendment request submittal:

A Upcoming and completed regulatory audits B. Open and closed tracking items C. Project plan III. Future meeting planning IV. Questions from the public' V.' Adjourn Enclosure

-2 PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

PG&E R. Stattel, NRR K. Schrader, et al.

R. Alvarado, NRR J. Rankin, NRR, et al.

Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail the meeting contact listed below before Tuesday, October 22, 2013,4:30 p.m.

EDT to get the telephone number and-the pass code.

MEETING CONTACT: Jennivine Rankin, NRR 301-415-1530 Jennivine.rankin@nrc.gov The NRC provides reasonable accommodation, on a case-by-case basis, to individuals with disabilities where appropriate upon request. To obtain a meeting notice, transcript, or other information in a special format (e.g., Braille, large print), please notify the NRC's meeting contact listed above.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, individuals may discontinue receiving electronic distributions at any time by visiting the same web address above and selecting unsubscribe.

Docket Nos. 50-275 and 50-323

Enclosure:

Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RStattel, NRRIDE/EICB LPL4 Reading SDarbali, NRRlDE/EICB RidsAcrsAcnw_MailCTR Resource TWertz, NRR RidsNrrDeEicb Resource DRich, EDO RIV RidsNrrDorl Resource RAlvarado, NRR/DE/EICB RidsNrrDorlLpl4 Resource VDricks, OPA RIV RidsNrrLAJBurkhardt Resource WMaier, RIV RidsNrrPMDiabloCanyon Resource TWFN Reception l RidsOpaMail Resource . OWFN Reception RidsRgn4MailCenter Resource ADAMS Accession No ML13263A192 OFFICE NRR/DORLlLPL4/PM NRRlDORLlLPL4/PM NRRIDORLlLPL4/LA NRR/DORLlLPL4/BC NRR/DORLlLPL4/PM NAME MBartlett JRankin JBurkhardt MMarkley (FLyon for) JRankin DATE 09/23/13 09/23/13 09/23/13 09/24/13 09/24/13 OFFICIAL RECORD COpy