ML20328A210
Letter Sequence Meeting | |
---|---|
EPID:L-2020-LRM-0101, Californians for Green Nuclear Power, Inc. (Cgnp) Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Presubmittal Meeting on Defueled Technical Specifications (Open) | |
MONTHYEARML20328A3022020-11-0303 November 2020
[Table View]85 Fr 69620 - Federal Register Notice Dated 11/3/20 by Department of Energy Californians for Green Nuclear Power, Inc., Et Al (Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Cgnp Public Comments on Pre-submittal Meeting of 11/24/2020) Project stage: Meeting ML20328A2962020-11-0303 November 2020, 23 November 2020 Californians for Green Nuclear Power, Inc. (Cgnp) Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Presubmittal Meeting on Defueled Technical Specifications Project stage: Request ML20310A2792020-11-0505 November 2020 Slides for Defueled TS Pre-Submittal Public Teleconference November 24, 2020 (L-2020-LRM-0101) Project stage: Meeting ML20328A2102020-11-0606 November 2020 Presubmittal Teleconference with Pacific Gas and Electric Company Regarding a Permanently Defueled Technical Specification License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 Project stage: Meeting ML20328A3012020-11-23023 November 2020 NERC Reliability Standards for the Bulk Electric System of North America Updated July 20, 2020 (Cgnp Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Pre-submittal Meeting of 11/24/2020) Project stage: Meeting ML20328A3002020-11-23023 November 2020 Email from Cgnp to the NRC - Comment Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Dcdep Public Meeting - November 24, 2020 Project stage: Meeting ML20332A1802020-12-0101 December 2020 Summary of November 24, 2020, Pre-Submittal Teleconference with Pacific Gas and Electric Company a Permanently Defueled Technical Specification License Amendment Request Project stage: Meeting 2020-11-05 |
ML20328A210 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 11/06/2020 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
PMNS20201311 | |
Download: ML20328A210 (3) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Meeting Notice
MONTHYEARPMNS20240064, Environmental Scoping Virtual Public Meeting for the Diablo Canyon License Renewal Application2024-01-30030 January 2024
[Table view]Environmental Scoping Virtual Public Meeting for the Diablo Canyon License Renewal Application PMNS20240065, Environmental Scoping Public Meeting for the Diablo Canyon License Renewal Application2024-01-22022 January 2024 Environmental Scoping Public Meeting for the Diablo Canyon License Renewal Application PMNS20230992, Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 22023-09-0606 September 2023 Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML23165A2172023-06-14014 June 2023 Pre-submittal Teleconference with Pacific Gas and Electric Company Regarding a Planned License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 PMNS20230169, Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 22023-02-22022 February 2023 Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 PMNS20221204, Public Meeting for License Renewal Application - Diablo Canyon Power Plant, Units 1 and 22022-12-0505 December 2022 Public Meeting for License Renewal Application - Diablo Canyon Power Plant, Units 1 and 2 PMNS20220933, Closed Meeting with Pacific Gas and Electric Company Regarding Planned Security Plan Changes for Diablo Canyon Nuclear Power Plant, Units 1 and 22022-09-0707 September 2022 Closed Meeting with Pacific Gas and Electric Company Regarding Planned Security Plan Changes for Diablo Canyon Nuclear Power Plant, Units 1 and 2 PMNS20220679, Post-Shutdown Decommissioning Activities Report Public Meeting2022-06-27027 June 2022 Post-Shutdown Decommissioning Activities Report Public Meeting PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220398, Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 22022-04-13013 April 2022 Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML21224A2362021-08-12012 August 2021 Pre-submittal Teleconference with Pacific Gas and Electric Company Regarding a Post-Shutdown Emergency Plan License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek ML21006A2042021-01-0606 January 2021 Notice of Pre-Application Meeting - PG&E to Discuss Upcoming Submittal of the Application for Renewal of the Diablo Canyon Independent Spent Fuel Storage Installation License ML20328A2102020-11-0606 November 2020 Presubmittal Teleconference with Pacific Gas and Electric Company Regarding a Permanently Defueled Technical Specification License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML18298A0762018-10-26026 October 2018 Notice of Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss Security-Related Information for Diablo Canyon Power Plant, Units 1 and 2 ML17283A0892017-10-10010 October 2017 Notice of Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss Security-Related Information for Diablo Canyon Power Plant, Units 1 and 2 (CAC Nos. MG0255 and MG0256; EPID L-2017-LRM-0019) ML16357A0862016-12-22022 December 2016 Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss the Proposed Change to the Defensive Strategy and 10 CFR 50.54(P) Documentation for Diablo Canyon Power Plant ML16119A5002016-04-29029 April 2016 Notice of Forthcoming Closed Meeting with Pacific Gas & Electric Company to Discuss Proposed Change to Defensive Strategy and 10 CFR 50.54(p) Documentation for Reduction in Minimum Staffing Requirements at Diablo Canyon ML15233A4912015-09-0101 September 2015 August 5, 2015, Public Scoping Meetings for the Environmental Review of the Diablo Canyon Power Plant, Units 1 and 2 License Renewal Application ML15152A2562015-06-0101 June 2015 Meeting Notice with Public Outreach and Pacific Gas & Electric (Pg&E) to Discuss the Current Operating Performance for Diablo Canyon Power Plant for the Period January 1 - December 31, 2014 ML14363A5542014-12-29029 December 2014 Regulatory Conference with Diablo Canyon Nuclear Power Plant ML14057A2002014-02-26026 February 2014 Notice of Forthcoming Meeting with Pacific Gas and Electric Company Regarding the Digital Replacement of the Process Protection System (TAC Nos. ME7522 and ME7523) ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13339A9612013-12-0505 December 2013 Public Meeting Notice ML13312A6462013-11-25025 November 2013 Meeting Notice with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13290A2272013-10-18018 October 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13273A4392013-09-30030 September 2013 Meeting Notice with the Pacific Gas and Electric Company to Discuss the Current Operating Performance for the Diablo Canyon Power Plant ML13263A1922013-09-24024 September 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13282A6202013-09-24024 September 2013 Cancellation Notice of 10/23/13 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13260A0052013-09-18018 September 2013 10/2/13 Notice of Pre-Application Meeting with Pacific Gas and Electric Company to Discuss Upcoming Structural Weld Overlay Relief Request to Use an Alternative to Disposition Detected Laminar Indications at Diablo Canyon, Unit 2 ML13246A4262013-09-0505 September 2013 Notice of Meeting to Discuss Amendment Request to Adopt Technical Specifications Task Force TSTF-505, Provide Risk-Informed Extended Completion Times, RITSTF Initiative 4B at Diablo Canyon, Units 1 and 2 ML13246A4072013-09-0505 September 2013 9/25/13 Notice of Forthcoming Pre-Application Meeting to Discuss Emergency Core Cooling System Evaluations for License Amendment Request at Diablo Canyon, Units 1 and 2 ML13246A4162013-09-0505 September 2013 9/24/13 - Notice of Pre-Application Meeting to Discuss License Amendment Request for Technical Specification 3.8.1 Diesel Generator Surveillance Requirements at Diablo Canyon, Units 1 and 2 ML13246A2622013-09-0404 September 2013 9/18/13 Notice of Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13179A0622013-07-0909 July 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13163A0242013-06-12012 June 2013 6/26/13 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13126A0872013-05-0707 May 2013 Notice of Forthcoming 5/29/13 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13074A1182013-03-15015 March 2013 3/27/13 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13052A5512013-02-21021 February 2013 Preapplication Meeting with Pacific Gas and Electric, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Generating Plants, at Diablo Canyon, Units 1 and 2 ML13028A2022013-02-0404 February 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13030A2462013-01-30030 January 2013 2/12/13 Forthcoming Preapplication Meeting with Pacific Gas and Electric Company to Discuss License Amendment Requests for Degraded Voltage Protection and Control Room Dose Analysis of Record at Diablo Canyon, Units 1 and 2 ML12354A5392012-12-20020 December 2012 1/24/2013 - Notice of Meeting with Pacific Gas and Electric to Discuss Diablo Canyon, Units 1 and 2 License Amendment Request to Revise FSAR Update Related to Delayed Access Offsite Power Circuit to Conform with GDC 17 ML12355A1382012-12-20020 December 2012 1/24/2013 - Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12348A1082012-12-18018 December 2012 Notice of 1/15/2013 Preapplication Meeting with Pacific Gas and Electric Company to Discuss License Amendment Request to Revise Diesel Generator Surveillance Requirements for Diablo Canyon, Units 1 and 2 ML12338A0932012-12-0404 December 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12338A0762012-12-0404 December 2012 Notice of Forthcoming Preapplication Meeting on 12/18/12 with Pacific Gas and Electric Company to Discuss Leak Before Break Assumptions Used in 10 CFR 50.46 Evaluation for Diablo Canyon, Units 1 and 2 ML12314A1552012-11-0909 November 2012 Open House and Poster Session with Member of the Public to Discuss PG&E Report on Analysis of Shoreline Fault Zone and Diablo Canyon Power Plant Performance ML12296A1822012-10-24024 October 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12275A2962012-10-0202 October 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 2024-01-30 Category:Meeting Agenda MONTHYEARPMNS20240064, Environmental Scoping Virtual Public Meeting for the Diablo Canyon License Renewal Application2024-01-30030 January 2024
[Table view]Environmental Scoping Virtual Public Meeting for the Diablo Canyon License Renewal Application ML24030A4672024-01-30030 January 2024 Environmental Scoping Meeting for the Diablo Canyon License Renewal Application - February 1 Meeting Slides PMNS20240065, Environmental Scoping Public Meeting for the Diablo Canyon License Renewal Application2024-01-22022 January 2024 Environmental Scoping Public Meeting for the Diablo Canyon License Renewal Application PMNS20230992, Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 22023-09-0606 September 2023 Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML23165A2172023-06-14014 June 2023 Pre-submittal Teleconference with Pacific Gas and Electric Company Regarding a Planned License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML23143A2262023-06-0101 June 2023 May 3, 2023, Summary of Public Meeting to Discuss the End of Cycle Assessment and Pre-Submittal License Renewal Process Overview for Diablo Canyon Power Plant, Units 1 and 2 PMNS20230169, Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 22023-02-22022 February 2023 Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML23004A1492023-01-0606 January 2023 December 8, 2022 Public Meeting Summary of Pre-Submittal Meeting ML22339A1022022-12-0505 December 2022 Pg_E Presentation for NRC Public Meeting PMNS20221204, Public Meeting for License Renewal Application - Diablo Canyon Power Plant, Units 1 and 22022-12-0505 December 2022 Public Meeting for License Renewal Application - Diablo Canyon Power Plant, Units 1 and 2 PMNS20220933, Closed Meeting with Pacific Gas and Electric Company Regarding Planned Security Plan Changes for Diablo Canyon Nuclear Power Plant, Units 1 and 22022-09-0707 September 2022 Closed Meeting with Pacific Gas and Electric Company Regarding Planned Security Plan Changes for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML22200A0712022-07-21021 July 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - July 21, 2022 PMNS20220679, Post-Shutdown Decommissioning Activities Report Public Meeting2022-06-27027 June 2022 Post-Shutdown Decommissioning Activities Report Public Meeting PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220398, Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 22022-04-13013 April 2022 Closed Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML21224A2362021-08-12012 August 2021 Pre-submittal Teleconference with Pacific Gas and Electric Company Regarding a Post-Shutdown Emergency Plan License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek ML21060B1862021-03-0101 March 2021 Enclosure 2 - 1-26-21 Diablo Canyon Renewal Pre-app Meeting Agenda ML21006A2042021-01-0606 January 2021 Notice of Pre-Application Meeting - PG&E to Discuss Upcoming Submittal of the Application for Renewal of the Diablo Canyon Independent Spent Fuel Storage Installation License ML20328A2102020-11-0606 November 2020 Presubmittal Teleconference with Pacific Gas and Electric Company Regarding a Permanently Defueled Technical Specification License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML16119A5002016-04-29029 April 2016 Notice of Forthcoming Closed Meeting with Pacific Gas & Electric Company to Discuss Proposed Change to Defensive Strategy and 10 CFR 50.54(p) Documentation for Reduction in Minimum Staffing Requirements at Diablo Canyon ML14363A5542014-12-29029 December 2014 Regulatory Conference with Diablo Canyon Nuclear Power Plant ML14057A2002014-02-26026 February 2014 Notice of Forthcoming Meeting with Pacific Gas and Electric Company Regarding the Digital Replacement of the Process Protection System (TAC Nos. ME7522 and ME7523) ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13312A6462013-11-25025 November 2013 Meeting Notice with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13290A2272013-10-18018 October 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13282A6202013-09-24024 September 2013 Cancellation Notice of 10/23/13 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13263A1922013-09-24024 September 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13260A0052013-09-18018 September 2013 10/2/13 Notice of Pre-Application Meeting with Pacific Gas and Electric Company to Discuss Upcoming Structural Weld Overlay Relief Request to Use an Alternative to Disposition Detected Laminar Indications at Diablo Canyon, Unit 2 ML13246A4262013-09-0505 September 2013 Notice of Meeting to Discuss Amendment Request to Adopt Technical Specifications Task Force TSTF-505, Provide Risk-Informed Extended Completion Times, RITSTF Initiative 4B at Diablo Canyon, Units 1 and 2 ML13246A4072013-09-0505 September 2013 9/25/13 Notice of Forthcoming Pre-Application Meeting to Discuss Emergency Core Cooling System Evaluations for License Amendment Request at Diablo Canyon, Units 1 and 2 ML13246A4162013-09-0505 September 2013 9/24/13 - Notice of Pre-Application Meeting to Discuss License Amendment Request for Technical Specification 3.8.1 Diesel Generator Surveillance Requirements at Diablo Canyon, Units 1 and 2 ML13246A2622013-09-0404 September 2013 9/18/13 Notice of Forthcoming Closed Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13179A0622013-07-0909 July 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13163A0242013-06-12012 June 2013 6/26/13 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13126A0872013-05-0707 May 2013 Notice of Forthcoming 5/29/13 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13074A1182013-03-15015 March 2013 3/27/13 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13052A5512013-02-21021 February 2013 Preapplication Meeting with Pacific Gas and Electric, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Generating Plants, at Diablo Canyon, Units 1 and 2 ML13028A2022013-02-0404 February 2013 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13030A2462013-01-30030 January 2013 2/12/13 Forthcoming Preapplication Meeting with Pacific Gas and Electric Company to Discuss License Amendment Requests for Degraded Voltage Protection and Control Room Dose Analysis of Record at Diablo Canyon, Units 1 and 2 ML13024A4052013-01-24024 January 2013 Licensee Slides from 1/24/13 Meeting to Discuss Offsite Power ML12355A1382012-12-20020 December 2012 1/24/2013 - Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12354A5392012-12-20020 December 2012 1/24/2013 - Notice of Meeting with Pacific Gas and Electric to Discuss Diablo Canyon, Units 1 and 2 License Amendment Request to Revise FSAR Update Related to Delayed Access Offsite Power Circuit to Conform with GDC 17 ML12348A1082012-12-18018 December 2012 Notice of 1/15/2013 Preapplication Meeting with Pacific Gas and Electric Company to Discuss License Amendment Request to Revise Diesel Generator Surveillance Requirements for Diablo Canyon, Units 1 and 2 ML12338A0762012-12-0404 December 2012 Notice of Forthcoming Preapplication Meeting on 12/18/12 with Pacific Gas and Electric Company to Discuss Leak Before Break Assumptions Used in 10 CFR 50.46 Evaluation for Diablo Canyon, Units 1 and 2 ML12338A0932012-12-0404 December 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12296A1822012-10-24024 October 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12275A2962012-10-0202 October 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12248A1152012-09-0606 September 2012 9/25/2012 - Notice of Preapplication Meeting with Pacific Gas and Electric to Discuss License Amendment Request Related to New Reactor Coolant Loss of Flow Analysis at Diablo Canyon Power Plant, Units 1 and 2 2024-01-30 |
Text
November 06, 2020
Title:
Presubmittal Teleconference with Pacific Gas and Electric Company Regarding a Permanently Defueled Technical Specification License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (EPID L-2020-LRM-0101)
Date(s) and Time(s): November 24, 2020, 02:00 PM to 04:00 PM The time of the meeting is local to the jurisdiction where the meeting is being held.
Location: Teleconference Category: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion of the meeting but before the meeting is adjourned.
Purpose:
The purpose of this meeting between Pacific Gas and Electric Company (PG&E, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) staff, is to provide information to the NRC staff regarding a proposed license amendment request to revise the Diablo Canyon Nuclear Power Plant, Units 1 and 2 licenses and technical specifications to reflect a permanently defueled condition. Publicly available presentation slides for this meeting can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML20310A279.
Contact:
Samson Lee 301-415-3168 Samson.Lee@nrc.gov
Participants:
NRC External S. Lee, Office of Nuclear Reactor P. Soenen, Pacific Gas and Electric Regulation Bridge Number Pass Code Teleconference:
(888) 469-1059 66921 Docket No: 05000275 05000323 Comments: This meeting is scheduled to begin at 2:00 p.m. Eastern Standard Time (EST).
PUBLIC MEETING AGENDA
Presubmittal Teleconference with Pacific Gas and Electric Company Regarding a Permanently Defueled Technical Specification License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (EPID L-2020-LRM-0101)
November 24, 2020, 02:00 PM to 04:00 PM Teleconference
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If reasonable accommodation is needed to participate in this meeting, or if a meeting notice, transcript, or other information from this meeting is needed in another format (e.g., Braille, large print), please notify the NRC meeting contact.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
ADAMS Accession Number: ML20328A210 Distribution:
Office NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM Name SLee PBlechman JDixon-Herrity SLee Date 11/05/2020 11/06/2020 11/06/2020 11/06/2020 OFFICIAL RECORD COPY Link to meeting details: https://www.nrc.gov/pmns/mtg?do=details&Code=20201311 Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 67 Federal Register 36920, May 28, 2002 The policy statement may be found on the NRC website http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html