(11 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML13221A064 | | | number = ML13221A064 |
| | issue date = 08/15/2013 | | | issue date = 08/15/2013 |
| | title = Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request for Extended Power Uprate (TAC Nos. ME9631 and ME9632) | | | title = Request for Additional Information Regarding License Amendment Request for Extended Power Uprate |
| | author name = Ennis R B | | | author name = Ennis R |
| | author affiliation = NRC/NRR/DORL/LPLI-2 | | | author affiliation = NRC/NRR/DORL/LPLI-2 |
| | addressee name = Pacilio M J | | | addressee name = Pacilio M |
| | addressee affiliation = Exelon Generation Co, LLC | | | addressee affiliation = Exelon Generation Co, LLC |
| | docket = 05000277, 05000278 | | | docket = 05000277, 05000278 |
| | license number = | | | license number = |
| | contact person = Ennis R B | | | contact person = Ennis R |
| | case reference number = TAC ME9631, TAC ME9632 | | | case reference number = TAC ME9631, TAC ME9632 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
| | page count = 5 | | | page count = 5 |
| | | project = TAC:ME9631, TAC:ME9632 |
| | | stage = RAI |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 15, 2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, I L 60555 |
| | |
| | ==SUBJECT:== |
| | PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE (TAC NOS. ME9631 AND ME9632) |
| | |
| | ==Dear Mr. Pacilio:== |
| | |
| | By letter dated September 28,2012, as supplemented by letters dated February 15, 2013, May 7,2013, May 24,2013, June 4,2013, June 27,2013, July 30,2013, July 31,2013, and August 5, 2013, (Agencywide Documents Access and Management System (ADAMS) |
| | Accession Nos. ML122860201, ML13051A032, ML13129A143, ML13149A145, ML13156A368, ML13182A025, ML13211A457, ML13213A285, and ML13217A431, respectively), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request for Peach Bottom Atomic Power Station, Units 2 and 3. The proposed amendment would authorize an increase in the maximum power level from 3514 megawatts thermal (MWt) to 3951 MWt. |
| | The requested change, referred to as an extended power uprate, represents an increase of approximately 12.4 percent above the current licensed thermal power level. |
| | The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The RAI questions were provided in draft form to Mr. Kevin Borton of your staff via e-mail on July 18, 2013. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. |
| | A conference call between the NRC staff and the Exelon staff was held on August 8, 2013, to discuss the questions. During the call, Mr. Borton stated that Exelon would provide a response to the RAI questions within 30 days of the date of this letter. |
| | Please note that if you do not respond to this letter by the agreed-upon date or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108. |
| | |
| | M. Pacilio - 2 If you have any questions, please contact me at (301) 415-1420. |
| | Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 |
| | |
| | ==Enclosure:== |
| | |
| | Request for Additional Information cc w/encl: Distribution via ListServ |
| | |
| | REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT EXTENDED POWER UPRATE EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 By letter dated September 28, 2012, as supplemented by letters dated February 15, 2013, May 7,2013, May 24,2013, June 4,2013, June 27, 2013, July 30,2013, July 31,2013, and August 5,2013, (Agencywide Documents Access and Management System (ADAMS) |
| | Accession Nos. ML122860201, ML13051A032, ML13129A143, ML13149A145, ML13156A368, ML13182A025, ML13211A457, ML13213A285, and ML13217A431, respectively), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed amendment would authorize an increase in the maximum power level from 3514 megawatts thermal (MWt) to 3951 MWt. The requested change, referred to as an extended power uprate (EPU), represents an increase of approximately 12.4 percent above the current licensed thermal power level. |
| | The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific request for additional information (RAI) is addressed below. |
| | Health Physics and Human Performance Branch (AHPB) |
| | Reviewers: Candace Clemons and Roger Pedersen AHPB-HP-RAI-1 Power Uprate Safety Analysis Report (PUSAR1) page 2-512 states, in part, that post-accident vital area access per NUREG-0737, Item II.B.2, mission doses were evaluated in the analyses that support the NRC safety evaluation (SE) for implementation of the Alternate Source Term (AST) license amendment, and that the TID-14844 was retained for these doses. However, the referenced amendment and SE only addressed the control room, not the other vital areas in the plant. In addition, the re-calculated doses for the control room were based on the AST source term. Resolve this apparent discrepancy. Provide a clear description of the technical basis for calculating the II.B.2 mission doses. |
| | AHPB-HP-RAI-2 PUSAR page 2-512, 5th paragraph, concludes that "aU of the doses are within the limits of GDC 19," with respect to vital area access. However, Table 2.9-11 "Post-LOCA Vital Areas 1 A proprietary (Le., non-publicly available) version of the PUSAR is contained in Attachment 6 to the application dated September 28, 2012. A non-proprietary (Le., publicly available) version of the PUSAR is contained in Attachment 4 to the application dated September 28,2012. |
| | Enclosure |
| | |
| | -2 Requiring Infrequent Occupancies," indicates several vital area mission doses that exceed the 5 rem GDC 19 acceptance criteria. Provide a list of all the vital areas (per the definition in II.B.2), |
| | the calculated mission dose to operators performing the vital action in these areas in post accident radiological conditions, and a description of the calculational method used to obtain the dose values. |
| | AHPB-HP-RAI-3 PUSAR page 2-514, 1s1 paragraph, and Table 2.10-2, indicate that the post-EPU N-16 skyshine dose rate at the nearest boundary is negligibly small. Provide a quantitive basis for this conclusion. Provide all input parameters (e.g., source strength, exposure geometries, distance to nearest boundary) needed to calculate the skyshine contribution to the most exposed member of the public during EPU operations. |
| | AHPB-HP-RAI-4 Table 2.10-2 on PUSAR page 2-518 presents calculated offsite doses at pre-EPU and EPU power levels. |
| | a} Are the input parameters used in these calculations consistent with the current Offsite Dose Calculation Manual (e.g., land use, meteorology, dose pathways, etc.)? |
| | b) Columns 3 and 4 are both calculated at 3528 MWt. However, the calculated doses are significantly different. Explain the differences in these two cases that cause these inconsistent results. |
| | c) Provide calculation PM-791 referenced in column 3 (Reference 105). |
| | d) What is the purpose of presenting the doses in column 4? |
| | e) Explain why the doses calculated for 4030 MWt (column 5) are significantly lower than the corresponding doses calculated at 3528 MWt (in column 4). Provide a technical basis for the acceptability of the dose results in column 5. |
| | f) Explain why a 5-year average dose is presented in column 6 of the table. Provide a technical basis for not listing the maximum value for each of these doses, or provide these maximum values for the 5 year period referenced. |
| | |
| | M. Pacilio -2 If you have any questions, please contact me at (301) 415-1420. |
| | Sincerely, Ira! (JHughey for) |
| | Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 |
| | |
| | ==Enclosure:== |
| | |
| | Request for Additional Information cc wtencl: Distribution via ListServ DISTRIBUTION PUBLIC RPedersen, NRRtDRAlAHPB LPL 1-2 RtF CClemons, NRRlDRAlAHPB RidsNrrDorlLpl1-2 Resource RidsNrrDraAhpb Resource RidsNrrPMPeachBottom Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLAABaxter Resource ADAMS Accession No.: ML13221A064 *via email OFFICE LPL1-2/PM LPL1-2/LA* LPL1-2/BC(A) |
| | NAME REnnis ABaxter VRodriguez (JHughey for) |
| | DATE 08/12113 08/12/13 08/15/13 OFFICIAL RECORD COpy}} |
Letter Sequence RAI |
---|
TAC:ME9631, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (Approved, Closed) TAC:ME9632, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting
|
MONTHYEARML12286A0122012-09-28028 September 2012 License Amendment Request - Extended Power Uprate Project stage: Request ML12286A0112012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-488 Through End, and Attachments 5 and 7 Through 9 Project stage: Request ML12279A2852012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML12279A2902012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 2 Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology Project stage: Request ML13051A0322013-02-15015 February 2013 Supplemental Information & Corrections Supporting Request for License Amendment Request - Extended Power Uprate - Supplement No. 1 Project stage: Supplement ML13056A4822013-03-0808 March 2013 Acceptance Review Regarding Proposed Extended Power Uprate Project stage: Acceptance Review ML13052A8532013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13052A8562013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13081A7052013-03-28028 March 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13106A1262013-04-26026 April 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13129A1432013-05-0707 May 2013 Extended Power Uprate, Supplement 2 - Response to Request for Additional Information Project stage: Supplement ML13149A1452013-05-24024 May 2013 Extended Power Uprate License Amendment Request - Supplement 3 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13156A3682013-06-0404 June 2013 Extended Power Uprate License Amendment Request Supplement 4 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13134A3842013-06-10010 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13161A3972013-06-26026 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13182A0252013-06-27027 June 2013 Supplemental Information Supporting Request for License Amendment Request - Extended Power Uprate - Supplement No. 5 Project stage: Supplement ML13178A3312013-07-0101 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13183A1992013-07-0303 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13203A1142013-07-23023 July 2013 Non-Proprietary - Request for Additional Information Regarding Proposed License Amendment Extended Power Uprate Project stage: RAI ML13203A1002013-07-23023 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Uprate Project stage: RAI ML13211A4032013-07-30030 July 2013 EPU LAR Supplement 6 Attachment 2 - Response to Request for Additional Information - Snpb Project stage: Supplement ML13211A4022013-07-30030 July 2013 Extended Power Uprate License Amendment Request - Supplement 6 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13213A2852013-07-31031 July 2013 Extended Power Uprate License Amendment Request - Supplement 7, Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13217A4312013-08-0505 August 2013 Extended Power Uprate License Amendment Request - Supplement 8 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13221A0642013-08-15015 August 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13240A0022013-08-22022 August 2013 Extended Power Uprate License Amendment Request - Supplement 9 Response to Request for Additional Information Project stage: Supplement ML13232A2772013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13232A2902013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13241A4182013-08-29029 August 2013 Extended Power Uprate License Amendment Request - Supplement 10 Response to Request for Additional Information Project stage: Supplement ML13253A4162013-09-11011 September 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13260A0762013-09-13013 September 2013 Extended Power Uprate License Amendment Request - Supplement 11 Response to Request for Additional Information Project stage: Supplement ML13247A7692013-09-18018 September 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13261A0432013-09-18018 September 2013 Requesty for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: Other ML13242A0902013-10-0101 October 2013 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML13242A1082013-10-0101 October 2013 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML13268A4002013-10-0101 October 2013 Enclosure 2 - Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13268A2632013-10-0101 October 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13289A1912013-10-11011 October 2013 Extended Power Uprate License Amendment Request - Supplement 12, Response to Request for Additional Information Project stage: Supplement ML13289A3002013-10-15015 October 2013 Extended Power Uprate License Amendment Request - Supplement 13 Response to Request for Additional Information Project stage: Supplement ML13308A3312013-10-31031 October 2013 Extended Power Uprate License Amendment Request - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML13291A1222013-11-0606 November 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13339A8072013-11-22022 November 2013 Comment (1) of Kevin Borton on Behalf of Exelon Generation Co. LLC, on Proposed License Amendment to Increase the Maximum Reactor Power Level Project stage: Other ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 Project stage: Request ML13345A6872013-12-0606 December 2013 Supplement 15 Response to Request for Additional Information Extended Power Uprate License Amendment Request Project stage: Supplement ML13308C4412013-12-11011 December 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13351A3902013-12-19019 December 2013 Summary of Closed Meeting with Exelon Generation Company, LLC, to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Meeting ML13358A0832013-12-20020 December 2013 Extended Power Uprate License Amendment Request- Supplement 16 Corrections, Clarifications and Additional Information - Extended Power Uprate Project stage: Supplement ML13345B3102014-01-0808 January 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML14002A1762014-01-15015 January 2014 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI 2013-05-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000277/20244012024-10-17017 October 2024 Security Baseline Inspection Report 05000277/2024401 and 05000278/2024401 (Cover Letter Only) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24099A0012024-04-0808 April 2024 (PBAPS) Units 2 and 3, Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. 05000277/LER-2024-001, Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout2024-03-21021 March 2024 Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1772024-07-0303 July 2024 Request for Additional Information ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22021A5692022-01-21021 January 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000277/2022403 and 05000278/2022403 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21035A2222021-02-0404 February 2021 Notification of Conduct of a Fire Protection Team Inspection ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs ML19232A1752019-08-20020 August 2019 Request for Additional Information - TSTF-500 Implementation LAR ML19140A2832019-05-15015 May 2019 Email - Peach Bottom Atomic Power Station, Units 2 and 3 Second Round RAI Request - Set 1 ML19140A2822019-05-15015 May 2019 027 Pb FU RAI Subsequent to Clarification Call - Cu Greater than 15 Zn Holston (Jg) ML19253D2932019-05-0707 May 2019 002 Attachment 4D Confirmation Water Chemistry Chereskin Revised (002) ML19249C7252019-05-0303 May 2019 SLRA Requests for Additional Information - Set 2 May 3, 2019 ML19108A4282019-04-10010 April 2019 RAIs SLRA Set 1_ERO(Rev 1) ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test ML19058A2902019-02-27027 February 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML19037A4832019-02-0606 February 2019 NRR E-mail Capture - Clarification Questions Associated with Staff Assessment of Peach Bottom Seismic Probabilistic Risk Assessment Report Dated August 28, 2018 ML19028A0062019-01-25025 January 2019 Secondary Containment LAR Requests for Additional Information ML19017A0472019-01-16016 January 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML18348B0292018-12-13013 December 2018 Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information ML19010A3832018-12-0707 December 2018 Additional Documents Needed for Peach Bottom SLR Environmental Review ML18324A6742018-11-15015 November 2018 Request for Additional Information (FINAL)- LAR to Allow 2SRV/SVs OOS at High Pressure ML18312A4072018-11-0808 November 2018 Request for Additional Information (Public) - LAR to Allow 2SRV/SVs OOS at High Pressure ML18276A0202018-10-0202 October 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan for Limerick and Peach Bottom ML18240A1742018-08-28028 August 2018 Request for Additional Information (Final) - Adopt TSTF-500 Battery TS Changes LAR ML18239A1322018-08-27027 August 2018 Request for Additional Information Final - Relief Request I5R-04 ML18228A6762018-08-14014 August 2018 Request for Additional Information - Adopt TSTF-500 Battery TS Changes LAR ML18226A2012018-08-14014 August 2018 Request for Additional Information - Relief Request I5R-05 ML18214A2812018-08-0202 August 2018 Request for Additional Information Draft - Relief Request I5R-02 ML18200A2742018-07-17017 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18192A1192018-07-10010 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18178A4772018-06-27027 June 2018 Request for Additional Information 2nd Round - Adopt 50.69 License Amendment ML18096B5062018-04-0606 April 2018 Request for Additional Information Exelon Generation Company, LLC Requested Amendment to Adopt 10 CFR 50.69 for Risk-informed Categorization and Treatment of Structures, Systems and Components ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17317B5502017-11-0909 November 2017 Licensed Operator Positive Fitness-For-Duty Test ML17240A0062017-08-24024 August 2017 Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate 2024-07-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 15, 2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, I L 60555
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE (TAC NOS. ME9631 AND ME9632)
Dear Mr. Pacilio:
By letter dated September 28,2012, as supplemented by letters dated February 15, 2013, May 7,2013, May 24,2013, June 4,2013, June 27,2013, July 30,2013, July 31,2013, and August 5, 2013, (Agencywide Documents Access and Management System (ADAMS)
Accession Nos. ML122860201, ML13051A032, ML13129A143, ML13149A145, ML13156A368, ML13182A025, ML13211A457, ML13213A285, and ML13217A431, respectively), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request for Peach Bottom Atomic Power Station, Units 2 and 3. The proposed amendment would authorize an increase in the maximum power level from 3514 megawatts thermal (MWt) to 3951 MWt.
The requested change, referred to as an extended power uprate, represents an increase of approximately 12.4 percent above the current licensed thermal power level.
The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The RAI questions were provided in draft form to Mr. Kevin Borton of your staff via e-mail on July 18, 2013. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.
A conference call between the NRC staff and the Exelon staff was held on August 8, 2013, to discuss the questions. During the call, Mr. Borton stated that Exelon would provide a response to the RAI questions within 30 days of the date of this letter.
Please note that if you do not respond to this letter by the agreed-upon date or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108.
M. Pacilio - 2 If you have any questions, please contact me at (301) 415-1420.
Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosure:
Request for Additional Information cc w/encl: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT EXTENDED POWER UPRATE EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 By letter dated September 28, 2012, as supplemented by letters dated February 15, 2013, May 7,2013, May 24,2013, June 4,2013, June 27, 2013, July 30,2013, July 31,2013, and August 5,2013, (Agencywide Documents Access and Management System (ADAMS)
Accession Nos. ML122860201, ML13051A032, ML13129A143, ML13149A145, ML13156A368, ML13182A025, ML13211A457, ML13213A285, and ML13217A431, respectively), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed amendment would authorize an increase in the maximum power level from 3514 megawatts thermal (MWt) to 3951 MWt. The requested change, referred to as an extended power uprate (EPU), represents an increase of approximately 12.4 percent above the current licensed thermal power level.
The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific request for additional information (RAI) is addressed below.
Health Physics and Human Performance Branch (AHPB)
Reviewers: Candace Clemons and Roger Pedersen AHPB-HP-RAI-1 Power Uprate Safety Analysis Report (PUSAR1) page 2-512 states, in part, that post-accident vital area access per NUREG-0737, Item II.B.2, mission doses were evaluated in the analyses that support the NRC safety evaluation (SE) for implementation of the Alternate Source Term (AST) license amendment, and that the TID-14844 was retained for these doses. However, the referenced amendment and SE only addressed the control room, not the other vital areas in the plant. In addition, the re-calculated doses for the control room were based on the AST source term. Resolve this apparent discrepancy. Provide a clear description of the technical basis for calculating the II.B.2 mission doses.
AHPB-HP-RAI-2 PUSAR page 2-512, 5th paragraph, concludes that "aU of the doses are within the limits of GDC 19," with respect to vital area access. However, Table 2.9-11 "Post-LOCA Vital Areas 1 A proprietary (Le., non-publicly available) version of the PUSAR is contained in Attachment 6 to the application dated September 28, 2012. A non-proprietary (Le., publicly available) version of the PUSAR is contained in Attachment 4 to the application dated September 28,2012.
Enclosure
-2 Requiring Infrequent Occupancies," indicates several vital area mission doses that exceed the 5 rem GDC 19 acceptance criteria. Provide a list of all the vital areas (per the definition in II.B.2),
the calculated mission dose to operators performing the vital action in these areas in post accident radiological conditions, and a description of the calculational method used to obtain the dose values.
AHPB-HP-RAI-3 PUSAR page 2-514, 1s1 paragraph, and Table 2.10-2, indicate that the post-EPU N-16 skyshine dose rate at the nearest boundary is negligibly small. Provide a quantitive basis for this conclusion. Provide all input parameters (e.g., source strength, exposure geometries, distance to nearest boundary) needed to calculate the skyshine contribution to the most exposed member of the public during EPU operations.
AHPB-HP-RAI-4 Table 2.10-2 on PUSAR page 2-518 presents calculated offsite doses at pre-EPU and EPU power levels.
a} Are the input parameters used in these calculations consistent with the current Offsite Dose Calculation Manual (e.g., land use, meteorology, dose pathways, etc.)?
b) Columns 3 and 4 are both calculated at 3528 MWt. However, the calculated doses are significantly different. Explain the differences in these two cases that cause these inconsistent results.
c) Provide calculation PM-791 referenced in column 3 (Reference 105).
d) What is the purpose of presenting the doses in column 4?
e) Explain why the doses calculated for 4030 MWt (column 5) are significantly lower than the corresponding doses calculated at 3528 MWt (in column 4). Provide a technical basis for the acceptability of the dose results in column 5.
f) Explain why a 5-year average dose is presented in column 6 of the table. Provide a technical basis for not listing the maximum value for each of these doses, or provide these maximum values for the 5 year period referenced.
M. Pacilio -2 If you have any questions, please contact me at (301) 415-1420.
Sincerely, Ira! (JHughey for)
Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosure:
Request for Additional Information cc wtencl: Distribution via ListServ DISTRIBUTION PUBLIC RPedersen, NRRtDRAlAHPB LPL 1-2 RtF CClemons, NRRlDRAlAHPB RidsNrrDorlLpl1-2 Resource RidsNrrDraAhpb Resource RidsNrrPMPeachBottom Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLAABaxter Resource ADAMS Accession No.: ML13221A064 *via email OFFICE LPL1-2/PM LPL1-2/LA* LPL1-2/BC(A)
NAME REnnis ABaxter VRodriguez (JHughey for)
DATE 08/12113 08/12/13 08/15/13 OFFICIAL RECORD COpy