Letter Sequence RAI |
---|
EPID:L-2017-LLA-0281, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B (Approved, Closed) |
|
MONTHYEARML17086A4512017-02-21021 February 2017 02-21-17 NRC Final Revision of Appendix X to NEI 05-04, 07-12, 12-16, Close-Out of Facts and Observations (F&Os) Project stage: Request ML17243A0142017-08-30030 August 2017 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. Project stage: Request ML17272B0162017-10-10010 October 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Adoption of Title 10 of the Code of Federal Regulations Section 50.69 (CAC Nos. MG0181-82; EPID L-2017-LLA-0281) Project stage: Acceptance Review ML17297B5212017-10-24024 October 2017 Supplement to Application to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Supplement ML17300A2762017-10-27027 October 2017 Acceptance Review - Peach Bottom Units 2 and 3 - License Amendment Request to Adopt 10 CFR 50.69 (CAC Nos. MG0181 and MG0182; EPID L-2017-LLA-0281) Project stage: Acceptance Review ML18005A0772018-01-0909 January 2018 Regulatory Audit Plan Regarding License Amendment Request to Adopt 10 CFR 50.69 (CAC Nos. MG0181 and MG0182; EPID L-2017-LLA-0281) Project stage: Other ML18096B5062018-04-0606 April 2018 Request for Additional Information Exelon Generation Company, LLC Requested Amendment to Adopt 10 CFR 50.69 for Risk-informed Categorization and Treatment of Structures, Systems and Components Project stage: RAI ML18072A3722018-04-10010 April 2018 Regulatory Audit Summary Regarding License Amendment Request to Adopt Title 10 of the Code of Federal Regulations Section 50.69 Project stage: Other ML18128A0092018-05-0707 May 2018 Response to Request for Additional Information Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants. Project stage: Response to RAI ML18157A2602018-06-0606 June 2018 Supplemental Information to Support Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants. Project stage: Supplement ML18178A4772018-06-27027 June 2018 Request for Additional Information 2nd Round - Adopt 50.69 License Amendment Project stage: RAI ML18192A1192018-07-10010 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment Project stage: RAI ML18200A2742018-07-17017 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment Project stage: RAI ML18222A3872018-08-10010 August 2018 Response to Request for Additional Information and Supplemental Information - Application to Adopt 1 O CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components ... Project stage: Supplement ML18234A1872018-08-22022 August 2018 Supplemental Information - Application to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants Project stage: Supplement ML18263A2322018-10-25025 October 2018 Issuance of Amendment Nos. 321 and 324 to Adopt 10 CFR 50.69 (CAC Nos. MG0181 and MG0181; EPID L-2017-LLA-0281) Project stage: Approval ML18302A2572018-11-0101 November 2018 Correction to Amendment Nos. 321 and 324 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems and Components (CAC Nos. MG0181 and MGO182; EPID L-2017-LLA-0281) Project stage: Other 2018-04-10
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1782024-07-0303 July 2024 NRC Email Response to Peach Bottoms Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24163A3522024-05-15015 May 2024 Meeting Feedback from May 14, 2024, Meeting with Constellation on Peach Bottom Atomic Power Station Units Nos. 2 and 3 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24088A3192024-03-28028 March 2024 Audit Plan Associated with Peach Bottom, Unit 1 - 10 CFR 50.82(a)(3) Alternate Decommissioning Schedule ML24002A7132023-12-29029 December 2023 Supplement - Peach Bottom Security Rule Exemption Request – ISFSI Docket No. Reference (EPID L-2023-LLE-0032) (Updated) (Email) ML23352A3242023-12-18018 December 2023 Acceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations (EPID L- 2023-LLN-0004) ML23331A9112023-11-22022 November 2023 Supplement - Peach Bottom Security Rule Exemption Request ISFSI Docket No. Reference ML23304A0182023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 - Exemption from Security Rule (L-2023-LLE-0032) ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22024A1852022-01-24024 January 2022 Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21134A0152021-05-14014 May 2021 Acceptance Ventilation Filter Testing LAR ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20343A3492020-12-0707 December 2020 Acceptance of Requested Licensing Action: Peach Bottom Relief Request for N-16 Nozzle ML20324A6472020-11-19019 November 2020 Acceptance of Requested Licensing Action: Peach Bottom One-time Exemption App. B Sect. VI.C.3.(I)(1) Force on Force (COVID-19) ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20276A0762020-10-0202 October 2020 Acceptance of Requested Licensing Action, One-Time Acceptance for Review - Peach Bottom of Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20217L3462020-08-0404 August 2020 Audit Plan Regarding License Amendment Request to Implement Riskinformed Extended Completion Times (L-2020-LLA-0120) ML20191A0182020-07-0101 July 2020 NRR E-mail Capture - Exelon Fleet RR for SPI for Appendix J Valves ML20178A1392020-06-26026 June 2020 Acceptance Review for Peach Bottom - License Amendment Request for TSTF-505 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1772024-07-0303 July 2024 Request for Additional Information ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22021A5692022-01-21021 January 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000277/2022403 and 05000278/2022403 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21035A2222021-02-0404 February 2021 Notification of Conduct of a Fire Protection Team Inspection ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs ML19232A1752019-08-20020 August 2019 Request for Additional Information - TSTF-500 Implementation LAR ML19140A2832019-05-15015 May 2019 Email - Peach Bottom Atomic Power Station, Units 2 and 3 Second Round RAI Request - Set 1 ML19140A2822019-05-15015 May 2019 027 Pb FU RAI Subsequent to Clarification Call - Cu Greater than 15 Zn Holston (Jg) ML19253D2932019-05-0707 May 2019 002 Attachment 4D Confirmation Water Chemistry Chereskin Revised (002) ML19249C7252019-05-0303 May 2019 SLRA Requests for Additional Information - Set 2 May 3, 2019 ML19108A4282019-04-10010 April 2019 RAIs SLRA Set 1_ERO(Rev 1) ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test ML19058A2902019-02-27027 February 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML19037A4832019-02-0606 February 2019 NRR E-mail Capture - Clarification Questions Associated with Staff Assessment of Peach Bottom Seismic Probabilistic Risk Assessment Report Dated August 28, 2018 ML19028A0062019-01-25025 January 2019 Secondary Containment LAR Requests for Additional Information ML19017A0472019-01-16016 January 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML18348B0292018-12-13013 December 2018 Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information ML19010A3832018-12-0707 December 2018 Additional Documents Needed for Peach Bottom SLR Environmental Review ML18324A6742018-11-15015 November 2018 Request for Additional Information (FINAL)- LAR to Allow 2SRV/SVs OOS at High Pressure ML18312A4072018-11-0808 November 2018 Request for Additional Information (Public) - LAR to Allow 2SRV/SVs OOS at High Pressure ML18276A0202018-10-0202 October 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan for Limerick and Peach Bottom ML18240A1742018-08-28028 August 2018 Request for Additional Information (Final) - Adopt TSTF-500 Battery TS Changes LAR ML18239A1322018-08-27027 August 2018 Request for Additional Information Final - Relief Request I5R-04 ML18228A6762018-08-14014 August 2018 Request for Additional Information - Adopt TSTF-500 Battery TS Changes LAR ML18226A2012018-08-14014 August 2018 Request for Additional Information - Relief Request I5R-05 ML18214A2812018-08-0202 August 2018 Request for Additional Information Draft - Relief Request I5R-02 ML18200A2742018-07-17017 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18192A1192018-07-10010 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18178A4772018-06-27027 June 2018 Request for Additional Information 2nd Round - Adopt 50.69 License Amendment ML18096B5062018-04-0606 April 2018 Request for Additional Information Exelon Generation Company, LLC Requested Amendment to Adopt 10 CFR 50.69 for Risk-informed Categorization and Treatment of Structures, Systems and Components ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17317B5502017-11-0909 November 2017 Licensed Operator Positive Fitness-For-Duty Test ML17240A0062017-08-24024 August 2017 Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate 2024-07-03
[Table view] |
Text
From: Tobin, Jennifer To: Helker, David P:(GenCo-Nuc)
Cc: "Gropp Jr, Richard W:(GenCo-Nuc)"
Subject:
Peach Bottom Units 2 and 3 - Request for Additional Information 2nd Round (FINAL) - Adopt 50.69 License Amendment (EPID L-2017-LLA-0281)
Date: Tuesday, July 10, 2018 4:54:00 PM Attachments: Peach Bottom 50-69 2nd Round RAIs.docx
Dear Mr. Helker,
By letter dated August 30, 2017 (Accession No. ML17243A014), as supplemented by letter dated October 24, 2017 (ADAMS Accession No. ML17297B521), May 7, 2018 (ADAMS Accession No. ML18128A009), and June 6, 2018 (ADAMS Accession No. ML18157A260), Exelon Generation Company, LLC requested an amendment to the facility operating license for Peach Bottom Atomic Power Station Units 2 and 3 to adopt 10 CFR 50.69 for Risk-informed Categorization and Treatment of Structures, Systems and Components.
The Nuclear Regulatory Commissions (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific request for additional information (RAI) questions are provided below. A clarification phone call held July 10, 2018, confirmed that the information below is still needed for NRC staff to review. A response to this 2nd round of RAIs is due no later than August 10, 2018.
If you have any questions, please contact me at (301) 415-2328. A copy of this e-mail will be made publicly available in ADAMS.
- Thanks, Jenny Jenny Tobin Project Manager NRR/DORL/LPL-1 Office O9-C12 Phone 301-415-2328 REQUEST FOR ADDITIONAL INFORMATION APPLICATION TO ADOPT 10 CFR 50.69 RISK-INFORMED CATEGORIZATION OF STRUCTURES, SYSTEMS, AND COMPONENTS EXELON GENERATION COMPANY PEACH BOTTOM ATOMIC POWER STATION (PBAPS), UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 Title 10, of the Code of Federal Regulations, Part 50, Section 69 (10 CFR 50.69), Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors, allows licensees to use a risk-informed process to categorize systems, structures, and components (SSCs) according to their safety significance in order to remove SSCs of low safety significance from the scope of certain identified special treatment requirements. Regulatory Guide (RG) 1.201, Revision 1, Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants According to their Safety Significance (Agencywide Documents Access and Management System (ADAMS) Accession No. ML061090627) endorses, with regulatory positions and clarifications, the Nuclear Energy Institute (NEI) guidance document NEI 0004, Revision 0 10 CFR 50.69 SSC Categorization Guideline, (ADAMS accession No. ML052910035) as one acceptable method for use in complying with the requirements in 10 CFR 50.69. Both RG 1.201 and NEI 0004 cite RG 1.200, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities, (ADAMS Accession No. ML040630078) which endorses industry consensus probabilistic risk assessment (PRA) standards, as the basis against which peer reviews evaluate the technical adequacy of a PRA. Revision 2 of RG 1.200 is available at ADAMS Accession No. ML090410014.
By letter dated August 30, 2017 (ADAMS Accession No. ML17243A014), as supplemented by letters dated October 24, 2017 (ADAMS Accession No. ML17297B521), May 7, 2018 (ADAMS Accession No. ML18128A009), and June 6, 2018 (ADAMS Accession No. ML18157A260), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request (LAR) to adopt the regulation in 10 CFR 50.69 at the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. Section 3.1.1 of the LAR states that Exelon will implement the risk categorization process of 10 CFR 50.69 in accordance with NEI 0004, Revision 0, as endorsed by RG 1.201.
However, the licensees LAR as supplemented does not contain enough information for the Nuclear Regulatory Commission (NRC) staff to determine if the licensee has implemented the guidance in NEI 0004, as endorsed by RG 1.201, appropriately as a means to demonstrate compliance with all of the requirements in 10 CFR 50.69. The following requests for additional information (RAIs) outline the specific issues and information needed to complete the NRC staffs review:
RAI 03.c.01 - Follow-up to Licensee Response to NRC RAI 03.c regarding Fire Modeling The disposition to partially resolved Fact and Observation (F&O) 2012-1-40 states that detailed two-point fire modeling was not been performed for all risk significant scenarios but this treatment did not have a significant impact on the application. In RAI 03.c, the NRC staff requested that the licensee justify its statement that not fully resolving the F&O has a minimal impact on the application or to provide a mechanism that ensures that the two-point fire modeling is applied to risk significant fire scenarios prior to implementing the 10 CFR 50.69 categorization process. The response to RAI 03.c states that this finding will be resolved prior to implementing 10 CFR 50.69.
The licensee stated that risk significant fire PRA scenarios capable of being modeled using a two-point modeling approach will be updated using a two (or more) point fire modeling approach prior to implementation of the 50.69 process.
- i. Explain what the phrase capable of being modeled using a two-point modeling approach means and what type of fire scenarios will not be modeled using this approach.
ii. Justify how supporting requirement (SR) FSS-C1 will be met at Capability Category (CC) II after the update is performed.
iii. If SR FSS-C1 will not be met at CC-II, justify why not using a two-point model for all risk significant scenarios has no impact on the application.
RAI 05.b.01 - Follow-up to Licensee Response to NRC RAI 05.b regarding Uncoordinated Breakers in the Fire PRA The disposition to open F&O 2012-5-1 states that if the licensee identifies uncoordinated circuits, then the uncoordinated circuits will be modeled in the fire PRA. In RAI 05.b.ii, the NRC staff requested description of how modeling of uncoordinated circuits will be performed. The response to RAI 05.b proposed an implementation item stating that the uncoordinated circuits will be modelled or additional analysis will be performed to show that the circuits are coordinated. Confirm that any additional analysis performed to determine that circuits are coordinated will be performed in accordance with guidance in NUREG/CR-6850 on breaker coordination studies.
RAI 08.d.01 - Follow-up to Licensee Response to NRC RAI 08.d regarding the RCIC and HPCI Turbine Failure Probabilities In RAI 08.d.ii the NRC staff requested the licensee to provide justification for the nominal failure probability assigned to the failure of the Reactor Core Isolation Cooling (RCIC) and High Pressure Coolant Injection (HPCI) turbines to run after passing liquid. The licensees response to RAI 08.d states that failure of the HPCI and RCIC turbines to start were assigned a nominal value of 0.05 based on operator and system manager interviews, and based on engineering judgement. However, the licensee stated that the HPCI and RCIC turbines are not specifically designed to continue running while passing liquid and there was no industry failure data or valid testing under accident conditions cited in the RAI response. Provide the following:
- i. A sensitivity study or other quantitative justification which demonstrates that the 10 CFR 50.69 categorization results are not sensitive to the assumed 0.05 failure probability, or ii. Propose a mechanism that removes credit for the 0.05 failure to start probability for HPCI and RCIC turbines in the internal event and fire PRAs prior to implementation of the 10 CFR 50.69 risk informed categorization process.
RAI 10.b.01 - Follow-up to Licensee Response to NRC RAI 10.b regarding External Flood Hazard Screening In RAI 10.b, the NRC staff requested the licensee to identify any structures, systems or components (SSCs),
passive and/or active, which are credited in the screening of external flood hazards. The licensees response to RAI 10.b states that a recently issued NRC staff assessment of the Peach Bottom external flooding evaluation in a letter dated November 6, 2017 (ADAMS Accession No. ML17292B763) indicates that there are no SSCs credited in the screening of external flooding. In addition, the response states that either available physical margin exists or,
where water ingress is expected, all external flood mechanisms resulted in water surface elevations below the design basis protection of the plant. However, the evaluation letter refers to flood protection features that are credited to reliably maintain key safety functions identified in Appendix B of NEI 16-05, Revision 1 (ADAMS Accession No. ML16165A178). These features seem to be passive features such as doors. Provide the following:
- i. Clarify whether the flood protection features are SSCs, passive or active, that are credited in the external flood hazard screening.
ii. If the flood protection features are SSCs that are credited in the external flood hazard screening, then confirm that the guidance in NEI 00-04 Figure 5-6 will be followed for those SSCs (i.e. if the removal of the SSC would cause a screened scenario to become unscreened, then that SSC would be designated high-safety-significant).