ML19303D166
Letter Sequence RAI | |
---|---|
EPID:L-2018-RNW-0013, Annual Radioactive Effluent Release Report 60: January 1, 2017 Through December 31, 2017 (Approved, Closed) | |
Initiation Questions Answers Results Other: ML18193A697, ML18232A438, ML18232A439, ML18289A379, ML18299A124, ML18304A200, ML18346A675, ML18354B066, ML19010A383, ML19023A227, ML19308A006, ML20054A175 | |
MONTHYEARRS-17-149, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.2017-12-15015 December 2017
[Table View]Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. Project stage: Supplement RS-18-033, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-03-15015 March 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal Project stage: Request RS-18-043, Supplement to Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-03-28028 March 2018 Supplement to Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal Project stage: Request ML18116A3242018-04-26026 April 2018 Annual Radioactive Effluent Release Report 60: January 1, 2017 Through December 31, 2017 Project stage: Request ML18193A6972018-07-10010 July 2018 Cover Letter Submitting Subsequent License Renewal Application Project stage: Other RS-18-098, Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...2018-08-28028 August 2018 Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... Project stage: Response to RAI ML18232A4392018-09-0404 September 2018 Federal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Other ML18232A4372018-09-0404 September 2018, 10 September 2018 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process Project stage: Request ML18232A4382018-09-10010 September 2018 Letter - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Other ML18288A4382018-09-25025 September 2018 Transcript from Peach Bottom SLR Envr Scoping Meeting 2018-09-25 Project stage: Request ML18275A3712018-09-25025 September 2018 Subsequent License Renewal Environmental Scoping Meeting 9-25-18 Project stage: Meeting ML18299A1242018-10-0101 October 2018 Pennsylvania State Historic Preservation Office Scoping Comments Concerning Peach Bottom Atomic Power Station, Units 2 & 3 Subsequent License Renewal Application Project stage: Other ML18282A1692018-10-0909 October 2018 Comment (3) of Richard Mccorkle on Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Units 2 and 3 Project stage: Request ML18289A5092018-10-18018 October 2018 09/25/2018 Summary of Meeting for Environmental Review of Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Meeting ML18289A3792018-10-25025 October 2018 License Renewal Environmental Site Audit Plan Regarding the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Other ML18288A1942018-10-25025 October 2018 Summary of the Site Visit Related to the Review of the Subsequent License Renewal Application for the Peach Bottom Atomic Power Station Units 2 and 3 Project stage: Approval ML18304A2002018-11-0606 November 2018 License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Other ML18323A7492018-11-19019 November 2018 Beyond Nuclear Hearing Request and Petition to Intervene Project stage: Request ML18330A1572018-11-23023 November 2018 Subsequent License Renewal Environmental Requests for Additional Information Project stage: RAI ML19010A3832018-12-0707 December 2018 Additional Documents Needed for Peach Bottom SLR Environmental Review Project stage: Other ML18348B0292018-12-13013 December 2018 Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information Project stage: RAI ML18354B0612018-12-20020 December 2018 Response to NRC Request for Additional Information, Dated November 23, 2018, Regarding the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application, Environmental Requests for Additional Information Project stage: Response to RAI ML18354B0662018-12-20020 December 2018 Summary of Monitoring Well Installation Details Project stage: Other ML19028A2802019-01-28028 January 2019 Response to NRC Request for Additional Information, Dated December 13, 2018, Regarding Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information Project stage: Response to RAI ML18346A6752019-01-31031 January 2019 Summary of the Subsequent License Renewal Environmental Audit Project stage: Other ML19023A2272019-02-0505 February 2019 Summary of the Subsequent License Renewal Severe Accident Mitigation Alternatives Audit Project stage: Other ML19037A3482019-07-25025 July 2019 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Peach Bottom Atomic Power Station Units 2 and 3 Subsequent License Renewal Application Project stage: Approval ML19210C5712019-07-31031 July 2019 Schedule Revision for the Review of the Peach Bottom Atomic Power Station Units 2 & 3 Subsequent License Renewal Application (EPID Nos. L-2018-RNW-0012/L-2018-RNW-0013) Project stage: Approval ML19199A1152019-08-0101 August 2019 Federal Register Notice - Peach Bottom Atomic Power Station Notice of Availability of the Draft Plant-Specific Draft Supplement 10 Second Renewal to the Generic Environmental Impact Statement for SLR Project stage: Draft Other ML19199A1142019-08-0101 August 2019 Notice of Availability of Draft Supplement 10, Second Renewal to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3 Project stage: Draft Other ML19260F9652019-08-0101 August 2019, 12 September 2019, 23 September 2019, 2 October 2019 Nuclear Regulatory Commission'S Public Meeting on the Draft Supplemental Environmental Impact Statment for Subsequent License Renewal of Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Request ML19256E3522019-09-12012 September 2019 Slides - Peach Bottom SLRA Dseis Public Meeting - Sep 12 2019 Project stage: Request ML19308A0062019-09-16016 September 2019 Jennifer Shang Comments on Pb Dseis Project stage: Other ML19273B9692019-10-0202 October 2019 September 12, 2019 - Public Meeting to Discuss Draft Supplement 10, Second Renewal, to the Generic EIS for License Renewal of Nuclear Plants Regarding Peach Bottom Atomic Power Station Units 2 and 3 SLRA (EPID: L-201-RNW-0013) ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs Project stage: RAI ML20054A1752020-01-28028 January 2020 Notification of the Availability of the Final Supplement 10, Second Renewal to the GEIS for Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Other 2018-07-10 |
ML19303D166 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 10/31/2019 |
From: | Office of Nuclear Material Safety and Safeguards |
To: | Exelon Generation Co |
James, LM NMSS/REFS/ELRB 301-415-3306 | |
Shared Package | |
ML19303D091 | List: |
References | |
EPID L-2018-RNW-0013 | |
Download: ML19303D166 (1) | |
Similar Documents at Peach Bottom | |
---|---|
Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024
[Table view]NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1772024-07-0303 July 2024 Request for Additional Information IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 IR 05000277/20224032022-01-21021 January 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000277/2022403 and 05000278/2022403 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21035A2222021-02-0404 February 2021 Notification of Conduct of a Fire Protection Team Inspection ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs ML19232A1752019-08-20020 August 2019 Request for Additional Information - TSTF-500 Implementation LAR ML19140A2832019-05-15015 May 2019 Email - Peach Bottom Atomic Power Station, Units 2 and 3 Second Round RAI Request - Set 1 ML19140A2822019-05-15015 May 2019 027 Pb FU RAI Subsequent to Clarification Call - Cu Greater than 15 Zn Holston (Jg) ML19253D2932019-05-0707 May 2019 002 Attachment 4D Confirmation Water Chemistry Chereskin Revised (002) ML19249C7252019-05-0303 May 2019 SLRA Requests for Additional Information - Set 2 May 3, 2019 ML19108A4282019-04-10010 April 2019 RAIs SLRA Set 1_ERO(Rev 1) ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test ML19058A2902019-02-27027 February 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML19037A4832019-02-0606 February 2019 NRR E-mail Capture - Clarification Questions Associated with Staff Assessment of Peach Bottom Seismic Probabilistic Risk Assessment Report Dated August 28, 2018 ML19028A0062019-01-25025 January 2019 Secondary Containment LAR Requests for Additional Information ML19017A0472019-01-16016 January 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML18348B0292018-12-13013 December 2018 Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information ML19010A3832018-12-0707 December 2018 Additional Documents Needed for Peach Bottom SLR Environmental Review ML18324A6742018-11-15015 November 2018 Request for Additional Information (FINAL)- LAR to Allow 2SRV/SVs OOS at High Pressure ML18312A4072018-11-0808 November 2018 Request for Additional Information (Public) - LAR to Allow 2SRV/SVs OOS at High Pressure ML18276A0202018-10-0202 October 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan for Limerick and Peach Bottom ML18240A1742018-08-28028 August 2018 Request for Additional Information (Final) - Adopt TSTF-500 Battery TS Changes LAR ML18239A1322018-08-27027 August 2018 Request for Additional Information Final - Relief Request I5R-04 ML18228A6762018-08-14014 August 2018 Request for Additional Information - Adopt TSTF-500 Battery TS Changes LAR ML18226A2012018-08-14014 August 2018 Request for Additional Information - Relief Request I5R-05 ML18214A2812018-08-0202 August 2018 Request for Additional Information Draft - Relief Request I5R-02 ML18200A2742018-07-17017 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18192A1192018-07-10010 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18178A4772018-06-27027 June 2018 Request for Additional Information 2nd Round - Adopt 50.69 License Amendment ML18096B5062018-04-0606 April 2018 Request for Additional Information Exelon Generation Company, LLC Requested Amendment to Adopt 10 CFR 50.69 for Risk-informed Categorization and Treatment of Structures, Systems and Components ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17317B5502017-11-0909 November 2017 Licensed Operator Positive Fitness-For-Duty Test 2024-07-03 |
Text
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (PEACH BOTTOM)
SUBSEQUENT LICENSE RENEWAL APPLICATION (SLRA)
REQUESTS FOR ADDITIONAL INFORMATION (RAIS)
ENVIRONMENTAL - SET 2 Aquatic Resources (A)
RAI-A-6: Please provide the following documents/information on the docket.
Cover Letter from Exelon to PDEP Transmitting NPDES Permit Renewal Application
- Exelon Generation Company LLC. Letter from M. Herr, Plant Manager, Exelon, to J.
Kim, Environmental Engineering Specialist, Pennsylvania Department of Environmental Protection.
Subject:
Exelon Generation Co., LLC - Peach Bottom Atomic Power Station NPDES Permit No. PA0009733 Renewal, Peach Bottom Township, York County. March 29, 2019.
Appendix C to NPDES Permit Renewal Application - Impingement and Entrainment Studies
- AECOM. 2019. 316(b) Summary Document, Peach Bottom Atomic Power Station, Delta, PA. March 2019. 30 p.
- AECOM. 2019. 40 CFR 122.21(r)(2-8) NPDES Application Requirements for Facilities with Cooling Water Intake Structures, Exelon Generation Company LLC, Peach Bottom Atomic Power Station, Delta PA. March 2019. 109 p.
- Normandeau Associates, Inc. 2019. Entrainment Characterization Study at Peach Bottom Atomic Power Station. Clean Water Act 316(b) Compliance Report for 40 CFR 122.21(r)(9), NPDES Permit No. PA 0009733. January 19, 2019. 384 p.
- AECOM. 2019. 40 CFR 122.21(r)(10) NPDES Application Requirements for Facilities with Cooling Water Intake Structures, Exelon Generation Company LLC, Peach Bottom Atomic Power Station, Delta PA. January 2019. 155 p.
Appendix F to NPDES Permit Renewal Application - Thermal Variance