PNO-V-87-085, on 871231,Region V Ofc Notified by NRC Resident Ofc at Washington Public Power Supply Reactor Site That Tractor Trailer Vehicle Had Overturned on Steven Highway Outside Richland,Wa.State of Wa Notified: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
(One intermediate revision by the same user not shown) | |
(No difference)
|
Latest revision as of 22:44, 18 December 2021
ML20212E248 | |
Person / Time | |
---|---|
Issue date: | 12/31/1987 |
From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
To: | |
References | |
PNO-V-87-085, PNO-V-87-85, NUDOCS 9711030115 | |
Download: ML20212E248 (1) | |
Similar Documents from NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) | |
---|---|
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-V-94-006, on 940320,aftershock Resulting from Earthquake, Occurred in San Fernando Valley of South California. Aftershock Measured 5.3 on Richter Scale.No Damage or Injuries Reported1994-03-21021 March 1994
[Table view]Some use of "" in your query was not closed by a matching "".PNO-V-94-006:on 940320,aftershock Resulting from Earthquake, Occurred in San Fernando Valley of South California. Aftershock Measured 5.3 on Richter Scale.No Damage or Injuries Reported PNO-V-93-022, on 931219,two Assistant Radiographers Received Overexposures from Radiography Source Disconnect of 18.5 Rems & 2.0 Rems Whole Body Respectively as Determined from Personnel Dosimetry1993-12-22022 December 1993 PNO-V-93-022:on 931219,two Assistant Radiographers Received Overexposures from Radiography Source Disconnect of 18.5 Rems & 2.0 Rems Whole Body Respectively as Determined from Personnel Dosimetry PNO-V-93-021, on 931201,chemical Spill in Radwaste Building. Caused by Addition of Oxidizing Agent,Hydrogen Peroxide. Employees Working on Floor Were Moved to Different Part of Plant1993-12-0202 December 1993 PNO-V-93-021:on 931201,chemical Spill in Radwaste Building. Caused by Addition of Oxidizing Agent,Hydrogen Peroxide. Employees Working on Floor Were Moved to Different Part of Plant PNO-V-93-020, on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts1993-11-18018 November 1993 PNO-V-93-020:on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts PNO-V-93-018, on 931025,9 Month Nursing Infant Had Received 25 Rads to Thyroid as Result of I-131 Administration to Mother.Caused by 15 Mci of I-131 for Diagnostic Scan.Event Under Investigation1993-10-26026 October 1993 PNO-V-93-018:on 931025,9 Month Nursing Infant Had Received 25 Rads to Thyroid as Result of I-131 Administration to Mother.Caused by 15 Mci of I-131 for Diagnostic Scan.Event Under Investigation PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled1993-09-22022 September 1993 PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power1993-08-30030 August 1993 PNO-V-93-016:on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power PNO-V-93-015, on 930811,4.7 Magnitude Earthquake Occurred.No Damage Reported at Listed Facilities.Aerotest Reactor Was Operating & Earthquake Scram Not Triggered.Concludes That Since No Motion Detected,Mmi Probably Less than I1993-08-11011 August 1993 PNO-V-93-015:on 930811,4.7 Magnitude Earthquake Occurred.No Damage Reported at Listed Facilities.Aerotest Reactor Was Operating & Earthquake Scram Not Triggered.Concludes That Since No Motion Detected,Mmi Probably Less than I PNO-V-93-014, on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee1993-08-11011 August 1993 PNO-V-93-014:on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee PNO-V-93-013, on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant1993-08-0909 August 1993 PNO-V-93-013:on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant PNO-V-93-009D, on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined1993-03-25025 March 1993 PNO-V-93-009D:on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined PNO-V-93-008, on 930222,State of California Licensed Well Logging Company Notified Region V That 100 Mci Cs-137 Sealed Source Was Discovered Missing from Storage Container Following Shipment of Container to Offshore Oil Platform1993-02-22022 February 1993 PNO-V-93-008:on 930222,State of California Licensed Well Logging Company Notified Region V That 100 Mci Cs-137 Sealed Source Was Discovered Missing from Storage Container Following Shipment of Container to Offshore Oil Platform PNO-V-93-007, on 930211,patient Forcibly Removed Cervical Applicator Containing Four Cs-137 Sources Totalling 130 Mci. RSO Does Not Believe Any Member of Medical Staff Received Exposure in Excess of Regulatory Limits1993-02-11011 February 1993 PNO-V-93-007:on 930211,patient Forcibly Removed Cervical Applicator Containing Four Cs-137 Sources Totalling 130 Mci. RSO Does Not Believe Any Member of Medical Staff Received Exposure in Excess of Regulatory Limits PNO-V-93-004, on 930121,automatic Reactor Scram Received Due to Low Level in Reactor Pressure Vessel.Licensee Estimates That Plant Will Be Shut Down for Repairs & Maint for 3 to 5 Days.Inspector Onsite During Event.Press Release Issued1993-01-21021 January 1993 PNO-V-93-004:on 930121,automatic Reactor Scram Received Due to Low Level in Reactor Pressure Vessel.Licensee Estimates That Plant Will Be Shut Down for Repairs & Maint for 3 to 5 Days.Inspector Onsite During Event.Press Release Issued PNO-V-93-003, on 930120,minor Accident,Involving Export Shipment of LEU U Fuel Pellets Occurred Approx 5 Miles East of Des Moines,Ia.Tractor Trailer Slipped on Black Ice.No Damage to Inner Containers or Personnel Injuries Occurred1993-01-20020 January 1993 PNO-V-93-003:on 930120,minor Accident,Involving Export Shipment of LEU U Fuel Pellets Occurred Approx 5 Miles East of Des Moines,Ia.Tractor Trailer Slipped on Black Ice.No Damage to Inner Containers or Personnel Injuries Occurred PNO-V-93-002, on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased1993-01-13013 January 1993 PNO-V-93-002:on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased PNO-V-93-001, on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media1993-01-0404 January 1993 PNO-V-93-001:on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media PNO-V-92-038, on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety1992-12-0808 December 1992 PNO-V-92-038:on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart1992-12-0101 December 1992 PNO-V-92-037:on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart PNO-V-92-034, on 921106,M Debblie Notified Region V Ofc of Overexposure to Radiographer from 50 Ci Co-60 Source. Radiographer Came in Physical Contact W/Source & Undergone Preliminary Medical Exams.State of or Investigating Event1992-11-0606 November 1992 PNO-V-92-034:on 921106,M Debblie Notified Region V Ofc of Overexposure to Radiographer from 50 Ci Co-60 Source. Radiographer Came in Physical Contact W/Source & Undergone Preliminary Medical Exams.State of or Investigating Event PNO-V-92-033, on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield1992-10-20020 October 1992 PNO-V-92-033:on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield PNO-V-92-024, on 920711,while Retesting Main Steam SRV at Approx 14% Reactor Power,Srv 3B Opened When Operated from Control Room But Would Not Close.Reactor Operators Reduced Reactor Pressure in Effort to Reseat Valve1992-07-13013 July 1992 PNO-V-92-024:on 920711,while Retesting Main Steam SRV at Approx 14% Reactor Power,Srv 3B Opened When Operated from Control Room But Would Not Close.Reactor Operators Reduced Reactor Pressure in Effort to Reseat Valve PNO-V-92-017, on 920605,earthquake W/Richter Magnitude of 5.0 Occurred.Plant Walkdowns Performed & No Problems Noted1992-06-0505 June 1992 PNO-V-92-017:on 920605,earthquake W/Richter Magnitude of 5.0 Occurred.Plant Walkdowns Performed & No Problems Noted PNO-V-92-010, on 920331,plant Reactor Trip Breaker Failed to Open During Routine Surveillance Test.Licensee Has Unsuccessfully Attempted to Reproduce Failure,In Breaker Cubicle & on Test Stand in Electrical Shop1992-04-0202 April 1992 PNO-V-92-010:on 920331,plant Reactor Trip Breaker Failed to Open During Routine Surveillance Test.Licensee Has Unsuccessfully Attempted to Reproduce Failure,In Breaker Cubicle & on Test Stand in Electrical Shop PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 9202271992-02-25025 February 1992 PNO-V-92-004:on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 PNO-V-91-031, on 911119,licensee Declared Unusual Event Following Low Reactor Pressure Vessel Level Condition W/Eccs Injecting.Reactor Tripped on Turbine Trip.All ECCS Sys Responded as Designed1991-11-19019 November 1991 PNO-V-91-031:on 911119,licensee Declared Unusual Event Following Low Reactor Pressure Vessel Level Condition W/Eccs Injecting.Reactor Tripped on Turbine Trip.All ECCS Sys Responded as Designed PNO-V-91-016, on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter1991-08-0909 August 1991 PNO-V-91-016:on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter PNO-V-91-014, on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg1991-07-16016 July 1991 PNO-V-91-014:on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg ML20203C2231991-06-14014 June 1991 PNO-V-91-04B on 910614,Region V Issued Rev 3 to CAL Concerning Actions to Be Taken by WPPSS Subsequent to Unsuccessful Simulator Requalification Retake Exam Performed 910605-06 PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core1991-03-0707 March 1991 PNO-V-91-003:on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable1991-03-0505 March 1991 PNO-V-91-002:on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable PNO-V-90-049, on 901207,w/plant Operating at Full Power, Explosion Occurred in Area of B Phase Insulator of Plant Main Transformer,Which Caused Turbine & Reactor Trip.Unusual Event Was Declared Due to Explosion1990-12-0707 December 1990 PNO-V-90-049:on 901207,w/plant Operating at Full Power, Explosion Occurred in Area of B Phase Insulator of Plant Main Transformer,Which Caused Turbine & Reactor Trip.Unusual Event Was Declared Due to Explosion PNO-V-90-048, on 901126,diagnostic Misadministration Occurred w/73 Yr Old Patient Given 250 Mci of Tc99m.Patient Hospitalized & Being Administered Thyroid Blocking Agents1990-11-27027 November 1990 PNO-V-90-048:on 901126,diagnostic Misadministration Occurred w/73 Yr Old Patient Given 250 Mci of Tc99m.Patient Hospitalized & Being Administered Thyroid Blocking Agents PNO-V-90-047B, updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys1990-11-23023 November 1990 PNO-V-90-047B:updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys PNO-V-90-047A, on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys1990-11-21021 November 1990 PNO-V-90-047A:on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys PNO-V-90-047, on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel1990-11-20020 November 1990 PNO-V-90-047:on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel PNO-V-90-045, State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference1990-11-0707 November 1990 PNO-V-90-045:State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference PNO-V-90-042A, on 901102,contamination of Hosp Labs & Public Areas Noted.Nrc Confirmed Licensee Monitoring Indicating That Contamination Removed to Acceptable Levels & Posed No Health Hazard to Workers or General Public1990-11-0505 November 1990 PNO-V-90-042A:on 901102,contamination of Hosp Labs & Public Areas Noted.Nrc Confirmed Licensee Monitoring Indicating That Contamination Removed to Acceptable Levels & Posed No Health Hazard to Workers or General Public PNO-V-90-042, on 901102,contamination Found in Eight Labs & Public Areas,Involving Unknown Amount of P-32.Licensee in Process of Decontaminating Labs & Assessing Contamination1990-11-0202 November 1990 PNO-V-90-042:on 901102,contamination Found in Eight Labs & Public Areas,Involving Unknown Amount of P-32.Licensee in Process of Decontaminating Labs & Assessing Contamination PNO-V-90-041, on 901024,licensee Declared Unusual Event After Determining That Vital & non-vital Instrument Power Supplies Interconnected Through Certain Sys Instrumentation1990-10-25025 October 1990 PNO-V-90-041:on 901024,licensee Declared Unusual Event After Determining That Vital & non-vital Instrument Power Supplies Interconnected Through Certain Sys Instrumentation PNO-V-90-038, A:on 900927,main Generator Trip Resulted in Unplanned Plant Shutdown.Transient Caused 140 MW Excursion on Grid,Tripped Off Nearby Substation & Shook Turbine Bldg Deck.Ge Contacted for Recommendations1990-09-27027 September 1990 PNO-V-90-038-A:on 900927,main Generator Trip Resulted in Unplanned Plant Shutdown.Transient Caused 140 MW Excursion on Grid,Tripped Off Nearby Substation & Shook Turbine Bldg Deck.Ge Contacted for Recommendations PNO-V-90-036, on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned1990-09-10010 September 1990 PNO-V-90-036:on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned PNO-V-90-035, on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected1990-08-0606 August 1990 PNO-V-90-035:on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected PNO-V-90-034, on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed1990-07-30030 July 1990 PNO-V-90-034:on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed PNO-V-90-033, on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant1990-07-27027 July 1990 PNO-V-90-033:on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant PNO-V-90-032, on 900711,steam Dumps Did Not Automatically Open to Pick Up Load Lost from Turbine During Performance of Turbine Test.Operators Took Manual Control & Stabilized Plant.Plant Shutdown to Investigate Event1990-07-11011 July 1990 PNO-V-90-032:on 900711,steam Dumps Did Not Automatically Open to Pick Up Load Lost from Turbine During Performance of Turbine Test.Operators Took Manual Control & Stabilized Plant.Plant Shutdown to Investigate Event PNO-V-90-031, on 900627,unintentional Overexposure of Infant Thyroid Discovered.Mother Administered 4.89 Mci I-131 on 900619 W/O Being Instructed to Stop Breast Feeding. Concentration of I-131 Discovered in Breast Milk1990-06-28028 June 1990 PNO-V-90-031:on 900627,unintentional Overexposure of Infant Thyroid Discovered.Mother Administered 4.89 Mci I-131 on 900619 W/O Being Instructed to Stop Breast Feeding. Concentration of I-131 Discovered in Breast Milk PNO-V-90-011, on 900919,Vice President Nuclear DW Cockfield Announced Resignation After Being in Position Since March 1987.TD Walt Will Serve as Vice President-Nuclear Until Licensee Identify Replacement1990-03-20020 March 1990 PNO-V-90-011:on 900919,Vice President Nuclear DW Cockfield Announced Resignation After Being in Position Since March 1987.TD Walt Will Serve as Vice President-Nuclear Until Licensee Identify Replacement PNO-V-90-010, on 900320,facility Entered TS 3.0.3 After Engineering Organization Determined Main Steam Flow Trip Setpoints Were Incorrect & Nonconservative.Plant Shutdown Began IAW TSs1990-03-20020 March 1990 PNO-V-90-010:on 900320,facility Entered TS 3.0.3 After Engineering Organization Determined Main Steam Flow Trip Setpoints Were Incorrect & Nonconservative.Plant Shutdown Began IAW TSs PNO-V-90-001, on 891230,while at 12% Reactor Power W/Main Generator Sypplying Power to Grid Plants Unit 3 Phase a Main Transformer Experienced Internal Fault,Which Caused Immediate Trip of Main Generator Output Breakers1990-01-0202 January 1990 PNO-V-90-001:on 891230,while at 12% Reactor Power W/Main Generator Sypplying Power to Grid Plants Unit 3 Phase a Main Transformer Experienced Internal Fault,Which Caused Immediate Trip of Main Generator Output Breakers 1994-03-21 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARPNO-V-94-006, on 940320,aftershock Resulting from Earthquake, Occurred in San Fernando Valley of South California. Aftershock Measured 5.3 on Richter Scale.No Damage or Injuries Reported1994-03-21021 March 1994
[Table view]Some use of "" in your query was not closed by a matching "".PNO-V-94-006:on 940320,aftershock Resulting from Earthquake, Occurred in San Fernando Valley of South California. Aftershock Measured 5.3 on Richter Scale.No Damage or Injuries Reported IR 05000361/19930391994-01-10010 January 1994 Insp Repts 50-361/93-39 & 50-362/93-39 on 931206-10.No Violations Noted.Major Areas Inspected:Review of ISI Activities Conducted During Current Unit 3 Cycle Seven Refueling Outage & Licensee Actions for Open Items ML20059K6311994-01-0606 January 1994 Notice of Deviation from Insp on 931206-10.Deviation Noted: Licensee Had No Documentation of Having Contacted Limitorque Nor Any Documentation of Limitorque Concurrence W/Licensee Determination of MOV Actuator Capability ML20059K7021994-01-0505 January 1994 Notice of Violation from Insp on 931102-1206.Violation Noted:On 931103,operators in Unit 1 Failed to Monitor Reactor Coolant Sys Level While Draining for Approx Eight Minutes IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000361/19930361994-01-0404 January 1994 Insp Repts 50-361/93-36 & 50-362/93-36 on 931206-10. Deviations Noted.Major Areas Inspected:Ler & Followup of Items from Previous Insps PNO-V-93-022, on 931219,two Assistant Radiographers Received Overexposures from Radiography Source Disconnect of 18.5 Rems & 2.0 Rems Whole Body Respectively as Determined from Personnel Dosimetry1993-12-22022 December 1993 PNO-V-93-022:on 931219,two Assistant Radiographers Received Overexposures from Radiography Source Disconnect of 18.5 Rems & 2.0 Rems Whole Body Respectively as Determined from Personnel Dosimetry IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept ML20059A1421993-12-15015 December 1993 Notice of Violation from Insp on 930930-1112.Violation Noted:Detailed Construction Package 1 Associated W/Request for Design Change 78-103,installed in May 1980,did Not Correctly Translate Design Basis Into Applicable Procedures IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise ML20059A3781993-12-10010 December 1993 Insp Rept 70-0734/93-08 on 931108-10.No Violations Noted. Major Areas Inspected:Dismantlement of HTGR Fuel Fabrication Facility IR 05000374/19930341993-12-0606 December 1993 Insp Rept 50-374/93-34 on 930916-1124.No Violations or Deviations Noted.Major Areas Inspected:Isi Activities, Including Review of Programs,Procedures,Observation of Work Activities,Data Review & Erosion/Corrosion Activities IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues PNO-V-93-021, on 931201,chemical Spill in Radwaste Building. Caused by Addition of Oxidizing Agent,Hydrogen Peroxide. Employees Working on Floor Were Moved to Different Part of Plant1993-12-0202 December 1993 PNO-V-93-021:on 931201,chemical Spill in Radwaste Building. Caused by Addition of Oxidizing Agent,Hydrogen Peroxide. Employees Working on Floor Were Moved to Different Part of Plant IR 015000004/19930131993-11-24024 November 1993 Insp Rept 15000004/93-13 on 930929-1025.Violation Being Considered for Escalated Enforcement Action.Major Areas Inspected:Concerns Involving Use of Byproduct Matl in Areas Under Federal Jurisdiction ML20058K7011993-11-24024 November 1993 Notice of Violation from Insp on 930920-1022.Violation Noted:Activities Were Not Accomplished in Accordance W/ Procedures in That on 930708,signature for Procedures Were Entered by Supervisor Who Did Not Conduct Rotation IR 05000361/19930271993-11-24024 November 1993 Insp Repts 50-361/93-27 & 50-362/93-27 on 930920-1022.No Violations Noted.Major Areas inspected:post-mod & Maint,Ts Surveillance,Ist & Predictive Maint Testing ML20058H9321993-11-22022 November 1993 Insp Rept 70-1257/93-12 on 931101-05.No Violations Noted. Major Areas Inspected:Fire Protection & Followup on Items of Noncompliance,Inspector Followup Items & NRC Info Notices IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint PNO-V-93-020, on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts1993-11-18018 November 1993 PNO-V-93-020:on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000361/19930341993-11-12012 November 1993 Insp Repts 50-361/93-34 & 50-362/93-34 on 931025-29.No Violations or Deviations Noted.Major Areas Inspected: Adequacy of Licensee Fire Protection & Prevention Program ML20058D4571993-11-0505 November 1993 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Noncompliance Noted:Licensee Personnel Did Not Perform Adequate Survey After Each Radiographic Exposure IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area PNO-V-93-018, on 931025,9 Month Nursing Infant Had Received 25 Rads to Thyroid as Result of I-131 Administration to Mother.Caused by 15 Mci of I-131 for Diagnostic Scan.Event Under Investigation1993-10-26026 October 1993 PNO-V-93-018:on 931025,9 Month Nursing Infant Had Received 25 Rads to Thyroid as Result of I-131 Administration to Mother.Caused by 15 Mci of I-131 for Diagnostic Scan.Event Under Investigation IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items ML20058D3311993-10-19019 October 1993 Notice of Violation from Insp on 930817-0920.Violation Noted:Between 911225-920113,licensee Engineer Worked More than 72 Hrs in 7 Day Period,Exclusive of Shift Turnover Time W/O Authorization by Manager ML20058D4261993-10-17017 October 1993 Insp Rept 70-1257/93-11 on 930908 & 0927-1001.No Violations or Deviations Noted.Major Areas Inspected:Criticality Safety,Operations & Followup on Open Items ML20058D2571993-10-17017 October 1993 Insp Rept 70-0734/93-07 on 930927-1001.No Deviations or Violations Noted.Major Areas Inspected:Radwaste Mgt Program, Ep,Environ Protection Program,Environ Monitoring Program & Followup on Previous Insp Findings ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint ML20059C9811993-10-15015 October 1993 Notice of Violation from Insp on 920719-0824 & 1001-1102. Violation Noted:Licensee Determined That Records Required to Be Maintained by NRC Not Complete or Accurate in All Matl Respects ML20059D2141993-10-15015 October 1993 Notice of Violation from Insp on 930402-0517.Violation Noted:Licensee Determined That Records Required to Be Maintained by NRC Not Complete & Accurate in All Matl Respects ML20059D1041993-10-0606 October 1993 Insp Rept 70-0734/93-06 on 930913-17.Violation Noted But Not Cited.Major Areas Inspected:Safety,Operations Review, Operator Training/Qualification,Maintenance/Surveillance Testing & Followup on Open Items IR 05000206/19930211993-10-0404 October 1993 Insp Repts 50-206/93-21,50-361/93-21 & 50-362/93-21 on 930913-17.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program,Followup on Open Items & Associated Critiques IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program ML20057E7121993-09-23023 September 1993 Notice of Violation from Insp on 930816-27.Violation Noted: Indications of Improper MOV Operation During 920323 Diagnostic Test of Auxiliary Feedwater Control Valve 3HV-4705 Not Documented Nor Promptly Corrected PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled1993-09-22022 September 1993 PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7201993-09-17017 September 1993 Insp Repts 50-361/93-17 & 50-362/93-17 on 930816-27. Violations Noted.Major Areas Inspected:Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety Related Motor-Operator Valve Testing & Surveillance ML20057E7301993-09-16016 September 1993 Notice of Violation from Insp on 930713-0816.Violation Noted:Emergency Operating Procedures Used to Identify & Mitigate SG Tube Rupture Were Inadequate ML20057C5691993-09-13013 September 1993 Safety Insp on 930812-18 of License 50-23509-01.Insp Findings:Portable Gauges Containing Licensed Matl Were Stored at Location Not Authorized by License Condition 10 IR 015000004/19930111993-09-10010 September 1993 Enforcement Conference Rept 15000004/93-11 on 930819.Major Areas Discussed:Violations Noted from Insp on 930729 & 30 ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments 1994-03-21 |
ya
[l) / C N~/ PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PH0-V-87-85 Date December 31, 1987 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by Region V staff on this date.
FACILITY: AGREEMENT STATE Emergency Classification STATE OF WASHINGTON Notification of Unusual Event Alert Site Area Emergency
. General Emergency
,J,,,NotApplicable i
SUBJECT:
ACCIDENT INVOLVING A VEHICLE CARRYING LOW-LEVEL RADI0 ACTIVE WASTE On December 31, 1987, the Region V office was notified by the NRC Resident Office at the Washington Public Power Supply reactor site that at 5:30 AM, today, a tractor trailer vehicle had overturned on the Stevens highway outside Richland.
Washington. The vehicle was carrying six metal boxes (550 cubic feet) of low-level (LSA) radioactive waste to the U.S. Ecolngy burial site. One box contained drums of solidified oil and loose contaminated soil. The othee *ive boxes contained compacted and non-compacted waste, irradiated hardware, and more contaminated soil.
The shipper was the Quadrex Recycle Center in Oak Ridge, Tennessee.
8 When the trailer overturned, the six metal boxes were thrown onto the highway and four of them ruptured spilling the trash and contaminated soil on the highway. The barrels containing the solidified oil remained intact.
DOE / Westinghouse personnel are onsite and performing the cleanup activities. The soil and trash will be placed into a concrete container and buried at the U.S. Ecology burial site.
Tha radiation level at the accident scene was 2 millirems per hour at five feet from the spilled debris and soil.
The shipment contained a total of 256 millicuries of contaminated waste and debris, and 0.9 millicuries of radium-226 as contaminated soil.
State of Wesnington inspectors are on site and are monitoring the cleanup activities. The State will perform an environmental survey after the cleanup has been completed.
The driver of the vehicle was not contaminated; however, he did receive a head wound. He was treated at the local hospital and released.
The Stevens highway was blocked off to through traffic after the accident. The road should be reopened by 5:30 PM, today, December 31, 1987.
Westinghouse has made a press release regarding the accident.
This Preliminary Notification is used for information only, and is current as of 2:00 PM, -
PST, December 31, 1987.
m Region V is following up on this matter with the State of Washington A jg