PNO-V-91-04B on 910614,Region V Issued Rev 3 to CAL Concerning Actions to Be Taken by WPPSS Subsequent to Unsuccessful Simulator Requalification Retake Exam Performed 910605-06
ML20203C223
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/14/1991
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
References
CAL, PNO-V-91-004B, PNO-V-91-4B, NUDOCS 9712150259
Download: ML20203C223 (1)


Text

-_ ..

To'd ~m OL fpfl Nwu h y :,arQ /!n}$je L P,RMilNARY ft0TIV! CATION OF EVEtli OR UNUSUAL OCCURRENCE--PNO-V-91-048 Date 06/14/91 t

This preliminary notification constitutes EARLi notice of events of POSSIBLE safety

( A public interest significance. T_he information presented is as initially received-ctbout verification or evaluation end is basically all that is known by Region V V aff on this date.

FACILITY: WASHINGTON PUBLIC POWER SUPPLY STSTEM Emergency Classification WHP-2 ,

Notification of Unusual Event DOCKET NO. 50-397 Alert RICHLAND, WASHINGTON Site Area Emergency

[ General Emeroency 1 Not Applicahie

SUBJECT:

WNP-2 RE0 val.lFICAT10N PROGRAM UPDATE NO. 2 On June 14, 1991, Region V issued Revision !!! to the Confirmatory Action Letter concerning the actions to be taken by the Washington Public Power Supply System subsequent to the unsuccessf ul sinrulator requalification retake examinations performed June 5-6, 1991. Previodsly, a requalification program evaluation was perfonned at WfiP-2 February 26-March 8, 1991 and an operational evaluation was administered March 21-22, 1991. The results of both evaluations were unsatisfactory, in the most recent requalificttion retake examination of three crews 6nd six'een cperators, two of the three crows failet, and three of the operators failed. All three of tne requalification retake examination failures were operators from the group of nine oper6 tors who had previously failed either the requalification examination or the operational evaluation.

The licensee management has agreed in the Confirmatory Action Letter to reevaluate the f Q sistent weaknesses in their operator and crew performance, develop a revised root N /se analysis, and modify their May 16, 1991 corrective action plan which was presented the NRC. In addition, this revision of the CAL clarifies that the licensee will not restart WNP-2 prior to completing action on the significant deficiencies identified through the requalification progr6m evaluation process, nor prior to an operational evaluation of an add'tional crew of operators.

The NRC and the licensee will meet to review the results of this additional analysis by the licen';oe at a date to be arranged next week.

WNP-2 remains in cold shutdown.

This information is current as of 4:00 p.m., June 14, 1991.

This PN is issued for information only.

CONTACT: L. Miller - FTS 448-030? ,  ! )

DISTRIBUTION BY 5520 Date Time _,_

FAX T0: M Chai rman _Carr EDO R1 Uate INP0 4 [f Time _

Comm. Rogers AEOD RII HSAC Comm. CurtiS5 PA0 Rlli LICENSEEa 'O Comm. Remick SLITP RIV RESIDENT INSPECTOR NRR HQS. OPERATIONS OFFICErl 5 ;c 2 OCA NMSS ~

POR(202)634-3343

/ \ IRM

( ) OlG r n Mall TO:

udS AStAP. ' ' ' '

D W (OHgina1)

GPA RES' d DOT:(Trans. Only. Applicable State) '

9712150259 PDR 910614 '

I&eE RV rnou 911

_- _ _ _ _ ____ _ _