PNO-V-90-049, on 901207,w/plant Operating at Full Power, Explosion Occurred in Area of B Phase Insulator of Plant Main Transformer,Which Caused Turbine & Reactor Trip.Unusual Event Was Declared Due to Explosion

From kanterella
Jump to navigation Jump to search
PNO-V-90-049:on 901207,w/plant Operating at Full Power, Explosion Occurred in Area of B Phase Insulator of Plant Main Transformer,Which Caused Turbine & Reactor Trip.Unusual Event Was Declared Due to Explosion
ML20198K395
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/07/1990
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
References
PNO-V-90-049, PNO-V-90-49, NUDOCS 9710240011
Download: ML20198K395 (1)


-

DEC-10-'90 mot 4 09:05 ID:tt4BB 3306 3314927142 TEL N0:301-492-7142 M370 P02 f) st.< < e Cnq f(jr1 j a J .ib  !

MINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PHO-V-90-49 Date 12/07/90 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by Region V staff on this date.

FACILITY: WASHINGTON PUBLIC POWER SUPPLY SYSTEM Emergency Classification WNP-2 XX Notification of Unusual Event DOCKET NO. 50-397 Alert RICHLAND, WASHINGTON Site Area toergency General Emer0ency Not Applicable

SUBJECT:

TRANSFORMER EXPLOSION AND REACTOR TRIP At app mximately 10:10 a.m. (PST) on December 7, 1990, with the plant operating at full power, an explosion occurred in the area of the 'B' phase insulator of the plant's main transformer. This caused a turbine trip and a reactor trip. The reactor was stabilized in Mode 3. At 10:19 a.m. (PST), the licensee declared an unusual Event due to the explosion.

Th re was no fire and the Unusual Event was terminated at 11:00 a.m. (PST).

The availability of offsite power was not affected by the event. An inspection conducted of transformers associated with offsite power indicated that the explosion did not impact th3ce transformers. Preliminary indications are that during the reactor trip, one safety The licensee presently

[ 711ef valve lends liftedthe to take forplant about to10 seconds cold andpending shutdown then fully resented.

their review of the event and repair of V transformer.

This information is current as of 11:45 a.m. (PST), December 7,1990.

CONTACT: S. Richards FTS 463-3063 , h [ p(W

- gh

'6f/

DISTRTBUTION BY 5520: FAX TO: E tO Date_12/07/90 Time 1:15 pm Date Time C~

Ch:1rman Carr EDO RI INPO a Comm. Roberts AE00 RII NSAC 8 Comm. Rogers PA0 RIII LICENSEE -

C Comm. Curtiss SLITP RIV RESIDENT INSPECTOR comm. Remick NRR HQS. OPEP.ATIONS OFFICER -

-c OCA NMSS POR N OGC IRM MAIL TO: F-C" OE OIG [ICS (Original) j ACRS ASLAP DOT:(Trans. Only, Applicable State)

GPA RES RV FORM 211 Revised: 8/19/87 A

l i 9710240011 901207 l PDR 18cE PNO-V-90-049 PDR l