DA10 s, -
THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P.O. BOX $000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLOG. - 55 PUBLIC SOUARE Serving The Best Location in the Nation May 14, 1985 MURRAY R. EDELMAN                                                            PY-CEI/OIE-0044 LQ VIC2 PRESIDENT NUCUAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Safety Relief Valves Supplied by the General Electric Company [RDC 76(83)]
 
==Dear Mr. Keppler:==
 
Our final report dated November 21, 1984 concerning equipment qualification testing of the Main Steam Safety Relief Valves (MSSRV) stated that all actions necessary for resolution of this significant deficiency per Deviation Analysis Report 133 relative to Unit I would be completed by June 1, 1985.
At this time, preoperational testing which will verify operability of the modified valves is in progress. We have been informed, however, of an equipment qualification test completion delay. A June 1985 completion of this test is now anticipated.
Documentation supporting the closure of this 10CFR50.55(e) deficiency will be available on site for review by the NRC when the qualification testing is complete.
S:.ncere y, A              ~
Murr ) R. Edelman Vice President Nuclear Group MRE:sab cc: Mr. J. A Grobe                                    U.S. Nuclear Regulatory Commission USNRC, Site Office (SBB50)                      c/o Document Management Branch Washington, D.C.          20555 Mr. D. E. Keating USNRC, Site Office (SBB50)                      Records Center, SEE-IN Institute of Nuclear Power Director                                            Operations Office of Inspection                            1100 circle 75 Parkway, Suite 1500 and Enforcement                              Atlanta, Georgia 30339 U.S. Nuclear Regulatory Commission Washington, D.C.            20555 8505290200 850514                                                              MAY 1g 19g5          g PDR    ADOCK 05000440                                                                            g\
S                      PDR XL 2]}}

Latest revision as of 12:46, 23 July 2020

Supplemental Final Deficiency Rept Re Safety Relief Valves Supplied by Ge.Completion of Environ Qualification Delayed Until June 1985
ML20128D778
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/14/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
PY-CEI-OIE-0044, PY-CEI-OIE-44, NUDOCS 8505290200
Download: ML20128D778 (1)


Text

-

DA10 s, -

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P.O. BOX $000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLOG. - 55 PUBLIC SOUARE Serving The Best Location in the Nation May 14, 1985 MURRAY R. EDELMAN PY-CEI/OIE-0044 LQ VIC2 PRESIDENT NUCUAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Safety Relief Valves Supplied by the General Electric Company [RDC 76(83)]

Dear Mr. Keppler:

Our final report dated November 21, 1984 concerning equipment qualification testing of the Main Steam Safety Relief Valves (MSSRV) stated that all actions necessary for resolution of this significant deficiency per Deviation Analysis Report 133 relative to Unit I would be completed by June 1, 1985.

At this time, preoperational testing which will verify operability of the modified valves is in progress. We have been informed, however, of an equipment qualification test completion delay. A June 1985 completion of this test is now anticipated.

Documentation supporting the closure of this 10CFR50.55(e) deficiency will be available on site for review by the NRC when the qualification testing is complete.

S:.ncere y, A ~

Murr ) R. Edelman Vice President Nuclear Group MRE:sab cc: Mr. J. A Grobe U.S. Nuclear Regulatory Commission USNRC, Site Office (SBB50) c/o Document Management Branch Washington, D.C. 20555 Mr. D. E. Keating USNRC, Site Office (SBB50) Records Center, SEE-IN Institute of Nuclear Power Director Operations Office of Inspection 1100 circle 75 Parkway, Suite 1500 and Enforcement Atlanta, Georgia 30339 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 8505290200 850514 MAY 1g 19g5 g PDR ADOCK 05000440 g\