Research Reactor Center Research Park I
UNIVERSITY OF MISSOURI-COLUMBIA Columbia, Missouri 65211 Telephone (573) 882-4211 l
January 7,1997 Mr. Alexander Adams, Jr.                                                                                                I Sr. Project Manager, NRR/PDNP Mail Station 11-B-20 U. S. Nuclear Regulatory Commission Washington, DC 20555
 
==REFERENCE:==
Docket 50-186                                                                                                i University of Missouri Research Reactor                                                                l License R-103                                                                                          ;
 
==SUBJECT:==
Request for Changes to the MURR Requalification Program The University of Missouri Research Reactor submits the attached revised Requalification Program                        ,
for NRC review and approval. We request that this program replace the current program which                              i was approved April 26,1978.
The main changes to the program are as follows:
: 1. References to NRC regulations have been updated.
: 2. The sections of the written biennial exam have been modified to be similar to NRC initial                          I exams and use the content guidance provided in NUREG-1478, Rev.1, Non-Power Reactor                                ;
Operator Licensing Examination Standards.                                                                          I
: 3. The biennial written exam will now have a second separate' exam prepared for the person /
persons who develop and review the primary written exam.
: 4. A new section providing documentation for active operator status was added to the program.
This regulatory requirement is currently met by administrative procedure.
: 5. An annual operating test and evaluation has been added to the program using the geneml guidance of NUREG-1478, Rev.1, for operating tests. The current program requirements for Periodic Observation and Evaluation (Section 2.3) are used to meet the regulatory requirements for an annual operating test.
: 6. The records retention section has been revised to reflect the retention of requalification records for the duration of each operator's license (> 6 years). These records are currently retained for that period to meet regulation.
9701150306 970107 PDR                                                                                                              (
ADOCK 05000186                                                                                              li PDR m              a                                                                                                  N(.D?-
150052 8n SQual Opp 0ftufuty Institutxm
 
. e.  *
        *                      =
Letter to Mr. Adams January 7,1997 Page two The pmposed changes to the MURR Requalification Program are based on recent changes to NRC regulations. The guidance for administering requalification written exams and operating tests has been drawn from NUREG-1478, Rev.1 (June 1995), Non-Power Reactor Operator Licensing                                                          i Examination Standards.                                                                                                                      I If there are any questions, please contact me at 573-882-5203 or Tony Schoone at 573-882-5296.
Sincerely,                                          ENDORSEMENT:
Reviewed and Approved JG                                                                          L                        ^
Walt A. Meyer Jr.                                  J. Charles McKibben Reactor Manager                                    Interim Dhector xc: Regional Administrator, Region III Enclosure                                                              1            . , , -
tAdt44                      1A/ lit;Q lfff')7                      !
CHRISTINE M. L :'NTE                                              3 Notary Public - Nc. cry Seal STATE OFMISSOURI Boone County My Conunission Expires: April 14,1999 i
1
                                                                                    ---                      -.  -  - - - .}}

Latest revision as of 01:47, 23 July 2020

Requests That Encl Revised Requalification Program Replace Current Program Which Was Approved on 780426.Changes, Submitted
ML20133G334
Person / Time
Site: University of Missouri-Columbia
Issue date: 01/07/1997
From: Mckibben J, Meyer W
MISSOURI, UNIV. OF, COLUMBIA, MO
To: Alexander Adams
NRC (Affiliation Not Assigned)
Shared Package
ML20133G336 List:
References
NUDOCS 9701150306
Download: ML20133G334 (2)


Text

. .

Research Reactor Center Research Park I

UNIVERSITY OF MISSOURI-COLUMBIA Columbia, Missouri 65211 Telephone (573) 882-4211 l

January 7,1997 Mr. Alexander Adams, Jr. I Sr. Project Manager, NRR/PDNP Mail Station 11-B-20 U. S. Nuclear Regulatory Commission Washington, DC 20555

REFERENCE:

Docket 50-186 i University of Missouri Research Reactor l License R-103  ;

SUBJECT:

Request for Changes to the MURR Requalification Program The University of Missouri Research Reactor submits the attached revised Requalification Program ,

for NRC review and approval. We request that this program replace the current program which i was approved April 26,1978.

The main changes to the program are as follows:

1. References to NRC regulations have been updated.
2. The sections of the written biennial exam have been modified to be similar to NRC initial I exams and use the content guidance provided in NUREG-1478, Rev.1, Non-Power Reactor  ;

Operator Licensing Examination Standards. I

3. The biennial written exam will now have a second separate' exam prepared for the person /

persons who develop and review the primary written exam.

4. A new section providing documentation for active operator status was added to the program.

This regulatory requirement is currently met by administrative procedure.

5. An annual operating test and evaluation has been added to the program using the geneml guidance of NUREG-1478, Rev.1, for operating tests. The current program requirements for Periodic Observation and Evaluation (Section 2.3) are used to meet the regulatory requirements for an annual operating test.
6. The records retention section has been revised to reflect the retention of requalification records for the duration of each operator's license (> 6 years). These records are currently retained for that period to meet regulation.

9701150306 970107 PDR (

ADOCK 05000186 li PDR m a N(.D?-

150052 8n SQual Opp 0ftufuty Institutxm

. e. *

  • =

Letter to Mr. Adams January 7,1997 Page two The pmposed changes to the MURR Requalification Program are based on recent changes to NRC regulations. The guidance for administering requalification written exams and operating tests has been drawn from NUREG-1478, Rev.1 (June 1995), Non-Power Reactor Operator Licensing i Examination Standards. I If there are any questions, please contact me at 573-882-5203 or Tony Schoone at 573-882-5296.

Sincerely, ENDORSEMENT:

Reviewed and Approved JG L ^

Walt A. Meyer Jr. J. Charles McKibben Reactor Manager Interim Dhector xc: Regional Administrator, Region III Enclosure 1 . , , -

tAdt44 1A/ lit;Q lfff')7  !

CHRISTINE M. L :'NTE 3 Notary Public - Nc. cry Seal STATE OFMISSOURI Boone County My Conunission Expires: April 14,1999 i