Forwards Application for Amend to License NPF-3,revising Tech Spec 6.2.2,Table 6.2-1 Re Min Shift Crew Composition,Per Generic Ltr 86-04
ML20070F272
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/01/1991
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20070F275 List:
References
1903, GL-86-04, GL-86-4, TAC-M79963, NUDOCS 9103080215
Download: ML20070F272 (2)


Text

._ --____ ___ _ _ _____- __- _ - _ _ _ - _ _ _ ________ - _____.

3CENTE g tv . Shelton x0 MMaan Avenue V2> 44 4riest ToleN. OH 43552K101 Deve 2 (419)249 2300 Docket Number 50-346 License Number NPT-3 Serial Number 1903 March 1. 1991 United States Nucles; Regulatory Commission

. Document Control Dest

-Vashington, D. C. 20555 Subjec t : License Amendment Application to Revise Technical Specification 6.2.2, Table 6.2-1, Minimum Shift Crev Composition

' Gentlemen Enclosed is an application for an amendment to the Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1 Operating License Number NPT-3, Appendix A.

Technical Specifications (TSs).to reflect the' change attached. The proposed change involves TS 6.2.2 Facilitv Staff.

~

.This request proposes that TS 6.2.2, Table 6.2-1, Minimum Shift Crew Composition, be revised to add a' footnote to the Senior Operator License (SOL) and Shift Technica1' Advisor-(STA) categories. The footnote vould allov one of the'tvo required individuals filling the SOL positions to-assume the STA function, provided the individual meets the qualifications for the combined Senior Reactor Cperator/STA position. The added footnote vill also' allow the dedicated STA position to be retained. This request is consistent vith the Nuclear Regulatory Commission's (NRC's) guidance

-provided in Generic Letter 86-04, dated February 13, 1986, Policy Statement on Engineering Expertire.on Shift, which specified the above two options for

meeting the currentJrequirements for providing engineering expertise on shift (NUREG-0737,. Clarification of Three Mile Island (THI) Action Plan:

Requirements. -Item 1.A.1.1). Toledo Edison requests that this amendment be issued by the NRC by October 1, 1991.

~5103000215 910301 ;

-P1R- ADOCK 05000346 P PDR f; Pi n 13 operating compas

' ClevWono beetne luuminoting '

[M j(.: 1o1000 Edson -

J

((/.

Dockot Number 50-346 Licenso Numbot NPP-3 Serial Number 1903  :

Page 2 If you have any questions regarding this amendment request, please contact Mr. R. V. Schrauder, Manager - Nuclear LicensinF, at (419) 249-2366.

Very tru y yours, At k -k Hill /mmb enclosure cci P. H. Byron, DB-1 NRC Senior Resident Inspector A. B. Davis, Regional Administrator, NRC Region III D. C. Di Ianni, DB-1 NRC Senior Project Hannger General J. Villiams, Chief of Staff, Ohio Adjutant General's Office State of Ohio Utility Radiological Safety Board f