ML022470064: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Aug. 23, 2002 Page    1  of 1 MANUAL    HARD  COPY  DISTRIBUTION DOCUMENT  TRANSMITTAL      2002-3 USER  INFORMATION:
FrLAIM*LAUREL    B  EMPL#:23244      CA#:    0363 A-ddres. UUCZA2 Phone#:    254-3658 TRANSMITTAL      INFORMATION:
T-:-      r t7i-L0 tAUKE  B        08/23/2002 LOCATION:      DOCUMENT CONTROL DESK FROM:    NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
TJTHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY
--  OR ELECTRONIC MANUAL ASSIGNED TO YOU:
325 - 325 - SYSTEMS LEAD ENGINEER: EMERGENCY PLAN POSITION    SPECIFIC    PROCEDURE REMOVE    MANUAL    TABLE  OF  CONTENTS        DATE: 08/08/2002 ADD      MANUAL    TABLE  OF  CONTENTS        DATE: 08/22/2002 CATEGORY: PROCEDURES          TYPE:  EP ID:    EP-PS-325 REPLACE:        REV:5 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.        PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.        FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
 
TAB 6 EP-PS-325-6 PAR AIRBORNE RELEASES EP ENTERED MONITOR CONDITIONS:
    - PLANT STATUS/PROCEDURES
    - ONSITE RAD CONDITIONS                                                                                      CONTINUE
    - STATUS OF RELEASE
    - DOSE PROJECTIONS AS PA-1 S    D PA-1P AS GENERA AEMERGENCY BEENG                                                  NO
                "-,ECLARED?
PA-2P YES ROJECTIONS IDOOTINC                                        RECOMMENDD DOSOES.OTHECOMMITTEDECE              D    E YES N            EVACUATION
              >5REMTHE      TO DUEGR0-10 ODOSE                                                    MILES 4.CDE OM DDE EUIVLENT OPA-5 PA-3 NO OR UNKNOWN S. PHREA CALIBUSDTORERTOSECIN4                FH    RCDR      O    OEDTIE      NOMTO      NTEATO RECOMMEND EVACUATING                                        CONTINUE      ..
0-2 MILES                          ..ASS.................NT""
AND SHELTERING                                      ASZEI, 2-10 MILES                                    PA-1 PA-4 NOTES'
: 1. PA-P CAN BE USED TO REFER TO SECTION 41 OF THE PROCEDURE FOR MORE DETAILED INFORMATION ON THE ACTION TO BE TAKEN.
: 2. DOSE PROJECTIONS DO NOT INCLUDE DOSE ALREADY RECEIVED.
: 3. TEDE - WHOLE BODY cTED-E) IS THE SUM OF EFFECTIVE DOSE EQUIVALENT RESULTING FROM EXPOSURE TO EXTERNAL SOURCES. THE COMMITTED EFFECTIVE DOSE EQUIVALENT (CEDE) FROM ALL SIGNIFICANT INHAL.ATION PATHWAYS AND THE DOSE DUE TO GROUND DEPOSITON.
: 4. COE - COMMITTED DOSE EQUIVALENT TO THE CHILD THYROID.
EP-AD-000-126, Revision 9, Page 1 of 6
 
TAB 6 EP-PS-325-6 PAR LIQUID RELEASES ENTRY:
INDICATIONS OF A POTENTIAL UQUID RELEASE
                                    - UNISOLABLE RADWASTE TANK RELEASE
                                    - LEAK TO COOLING TOWER BASIN
                                    - LEAK TO SPRAY POND rL-1 Isotopic Umit                    ENSURE CHEM/ESD RADIONUCUDE        (uCi/ml)                      TAKES AND ANALYZES Ag-11Om            1.1E-6                            SAMPLES As-76              7.2E-7                      PL-2 Ba-140              1.1 E-6 Ce-141              3.6E-6 Co-58              1.1 E-4 ICONTINUE Co-60              1.2Es                        REQUIREMENTS (AT                REQUIRED        MONITORING Cr-51              7.2E-5 Cs-1 34            2.4E 4 Cs-1 37            2.4E 6 Fe-55              2.4E 5 Fe-59              2.4E 6 H-3                2.4E4                        RAD PERSONNEL I-129              1.2E"8                      NOTIFY DANVILLE AND 1-131              3.6E-8                      BRP THAT A RELEASE La-140              7.2E7                          HAS OCCURRED Mn-54              3.6E-6                    PL-4 Mo-99              7.2E-6 Na-22              4.8E-6                    CHEM/FTD EVALUATES Nb-95              3.6E76                        RELEASE vs;PAG Ni-59              3.6E6 Ni-63              6.0E"7 P-32                3.6E-7 Ru-1 03            2.4E" Ru-1 06            3.6E-7                        ES RELEASE EXCE                RAD PERSONNEL Sb-124              7.2E"7                    ANY OF THE TABLE LIMITS
                                                                            -No-  NOTIFY DANVILLE OR DOES THE SUM OFF Sb-125              3.6E                    "ýFRACTInS EXCEED 1.0 AT              THATNO PARIS Sr-89              2.4E 7                            DANVILLE?                      REQUIRED Sr-90              9.6E-8                                                        PL-8 Tc-99m              1.1 E-5 7.2E-7 Y-90                                                      I Yes' Zn-65              3.6E-6 Zr-95              2.4E-RAD PERSONNEL NOTIFY DEP/BRP FOR DANVILLE TO DIVERT DRINKING WATER SUPPLY & ESTIMATED TIME OF ARRIVAL OF RELEASE AT DANVILLE PL-7 NOTES:
: 1. PL-# CAN BE USED TO REFER TO SECTION 4.2 OF THE PROCEDURE FOR MORE DETAILED INFORMATION ON THE ACTION TO BE TAKEN.
: 2. CALLS TO DANVILLE ARE COURTESY INFORMATION CALLS ONLY. PROTECTIVE ACTION RECOMMENDATION CALLS MUST BE MADE BY DEP/BRP.
EP-AD-000-1 26, Revision 9, Page 2 of 6
 
TAB 6 EP-PS-325-6 PUBLIC PROTECTIVE ACTION RECOMMENDATION GUIDE AIRBORNE RELEASES
-' PA-1        MONITOR CONDITIONS FOR PAR APPLICATION The following conditions should be continuously evaluated to determine if a PAR should be implemented or changed:
    "*  Plant status and prognosis for changes in conditions
    "*  Onsite radiological conditions
    "*  Status of actual or potential radioactive releases
    "*  Offsite dose projections or actual offsite radiological conditions
    "*  Escalation in Emergency Classification (i.e., General)
(Go to PA-2)
PA-2        HAS A GENERAL EMERGENCY BEEN DECLARED?
El YES - Ifa GENERAL EMERGENCY has been declared, a PAR must be made within 15 minutes of the emergency declaration. The PAR requirement is found in "NUREG-0654. (Go to PA-3)
El NO - If a GENERAL EMERGENCY has not been declared, continue to monitor plant status, parameter trends, and prognosis for termination -or escalation of the event. (Go to PA-1)
PA-3        IS THERE A VALID DOSE PROJECTION INDICATING DOSES OF > 1 REM TEDE OR>
5 REM CDE CHILD THYROID AT A DISTANCE OF
              > 2 MILES?
El YES - Ifthe projected doses at 2 miles are > 1 REM TEDE or > 5 REM CDE child thyroid, then full evacuation (0-10 miles) is recommended.
(Go to PA-5)
El NO/UNKNOWN - (Go to PA-4)
EP-AD-O00-126, Revision 9, Page 3 of 6
 
TAB 6 EP-PS-325-6 0  PA-4        RECOMMEND EVACUATION 0-2 MILES; SHELTER 2-10 MILES Limited Evacuation (0-2 miles) and sheltering is appropriate for events that are significant enough to cause a General Emergency classification and dose projections are low, unknown, or below full evacuation guidelines.
o1  PA-5        EVACUATE 0-10 MILES Full evacuation of members of the general public is recommended at this point based on the emergency classification and dose projections.
EP-AD-000-126, Revision 9, Page 4 of 6
 
TAB 6 EP-PS-325-6 LIQUID
_1 PL-1        ENTRY This section is entered when there are indications of a potential radioactive liquid release.
Indications of potential releases include:
    "* an unisolable radwaste tank release.
    "* leaks to cooling tower basin
    "* leak to spray pond (Go to PL-2) 0l  PL-2      CHEMISTRY/ENVIRONMENTAL SAMPLING DIRECTOR (ESD) TAKES AND ANALYZES SAMPLE (Go to PL-3)
PL-3      IS RELEASE > TECHNICAL REQUIREMENTS LIMITS (AT THE RELEASE POINT)?
El YES - -Releases are at or greater than Technical Requirements limits when Chemistry determines that the limits are exceeded based on methodologies described in the ODCM and applicable Chemistry procedures.
0l  NO - Ifthe release is < Technical Requirements limits, then no notifications are required and monitoring should continue.
(Go to PL-4) 1E  PL-4      RAD PERSONNEL NOTIFY DANVILLE AND BRP THAT A RELEASE HAS OCCURRED Depending on which facility is activated, the notification to Danville and BRP will be made by the RPC (TSC) or the Radiological Liaison (EOF).
DO NOT MAKE ANY PROTECTIVE ACTIONS RECOMMENDATIONS AT THIS TIME.
EP-AD-000-126, Revision 9, Page 5 of 6
 
TAB 6 EP-PS-325-6 o  PL-5        CHEM/FTD EVALUATES RELEASE VERSUS PAGs The results of the sample analysis are compared to the PAGs for radionuclides in drinking water. The analysis calculates the expected concentration at Danville, taking into account the dilution afforded by the river.
PL-6      DOES RELEASE EXCEED PAGs (AT DANVILLE)?
o  YES - If a single isotope exceeds the PAG or the sum of the fractions exceeds 1.0, then a protective action recommendation should be made for Danville to DIVERT its DRINKING WATER supply to a backup supply until the release has passed.
(Go to PL-7) o    NO - If the PAGs are not exceeded, monitoring should continue and the State should be notified that no PAR for the liquid release is required. (Go to PL-8)
E    PL-7      RAD PERSONNEL NOTIFY DEP/BRP OF PAR Depending on which facility is activated, the PAR notification to DEP/BRP will be made by the RPC (TSC) or the Radiological Liaison (EOF). The PAR FORM shall be used to document the PAR.
DO NOT COMMUNICATE THE PROTECTIVE ACTION RECOMMENDATION TO DANVILLE. THE DEP/BRP IS RESPONSIBLE FOR THIS COMMUNICATION.
o1  PL-8      RAD PERSONNEL NOTIFY DEP/BRP No PAR is required. Depending on which facility is activated, the RPC (TSC) or the Radiological Liaison (EOF) shall notify DEP/BRP that no PAR is required.
EP-AD-000-126, Revision 9, Page 6 of 6}}

Latest revision as of 10:20, 26 March 2020

Revision 5 to EP-PS-325, Systems Lead Engineer: Emergency Plan - Position Specific Procedure.
ML022470064
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/23/2002
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EP-PS-325-6
Download: ML022470064 (8)


Text

Aug. 23, 2002 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2002-3 USER INFORMATION:

FrLAIM*LAUREL B EMPL#:23244 CA#: 0363 A-ddres. UUCZA2 Phone#: 254-3658 TRANSMITTAL INFORMATION:

T-:- r t7i-L0 tAUKE B 08/23/2002 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

TJTHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY

-- OR ELECTRONIC MANUAL ASSIGNED TO YOU:

325 - 325 - SYSTEMS LEAD ENGINEER: EMERGENCY PLAN POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 08/08/2002 ADD MANUAL TABLE OF CONTENTS DATE: 08/22/2002 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-325 REPLACE: REV:5 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

TAB 6 EP-PS-325-6 PAR AIRBORNE RELEASES EP ENTERED MONITOR CONDITIONS:

- PLANT STATUS/PROCEDURES

- ONSITE RAD CONDITIONS CONTINUE

- STATUS OF RELEASE

- DOSE PROJECTIONS AS PA-1 S D PA-1P AS GENERA AEMERGENCY BEENG NO

"-,ECLARED?

PA-2P YES ROJECTIONS IDOOTINC RECOMMENDD DOSOES.OTHECOMMITTEDECE D E YES N EVACUATION

>5REMTHE TO DUEGR0-10 ODOSE MILES 4.CDE OM DDE EUIVLENT OPA-5 PA-3 NO OR UNKNOWN S. PHREA CALIBUSDTORERTOSECIN4 FH RCDR O OEDTIE NOMTO NTEATO RECOMMEND EVACUATING CONTINUE ..

0-2 MILES ..ASS.................NT""

AND SHELTERING ASZEI, 2-10 MILES PA-1 PA-4 NOTES'

1. PA-P CAN BE USED TO REFER TO SECTION 41 OF THE PROCEDURE FOR MORE DETAILED INFORMATION ON THE ACTION TO BE TAKEN.
2. DOSE PROJECTIONS DO NOT INCLUDE DOSE ALREADY RECEIVED.
3. TEDE - WHOLE BODY cTED-E) IS THE SUM OF EFFECTIVE DOSE EQUIVALENT RESULTING FROM EXPOSURE TO EXTERNAL SOURCES. THE COMMITTED EFFECTIVE DOSE EQUIVALENT (CEDE) FROM ALL SIGNIFICANT INHAL.ATION PATHWAYS AND THE DOSE DUE TO GROUND DEPOSITON.
4. COE - COMMITTED DOSE EQUIVALENT TO THE CHILD THYROID.

EP-AD-000-126, Revision 9, Page 1 of 6

TAB 6 EP-PS-325-6 PAR LIQUID RELEASES ENTRY:

INDICATIONS OF A POTENTIAL UQUID RELEASE

- UNISOLABLE RADWASTE TANK RELEASE

- LEAK TO COOLING TOWER BASIN

- LEAK TO SPRAY POND rL-1 Isotopic Umit ENSURE CHEM/ESD RADIONUCUDE (uCi/ml) TAKES AND ANALYZES Ag-11Om 1.1E-6 SAMPLES As-76 7.2E-7 PL-2 Ba-140 1.1 E-6 Ce-141 3.6E-6 Co-58 1.1 E-4 ICONTINUE Co-60 1.2Es REQUIREMENTS (AT REQUIRED MONITORING Cr-51 7.2E-5 Cs-1 34 2.4E 4 Cs-1 37 2.4E 6 Fe-55 2.4E 5 Fe-59 2.4E 6 H-3 2.4E4 RAD PERSONNEL I-129 1.2E"8 NOTIFY DANVILLE AND 1-131 3.6E-8 BRP THAT A RELEASE La-140 7.2E7 HAS OCCURRED Mn-54 3.6E-6 PL-4 Mo-99 7.2E-6 Na-22 4.8E-6 CHEM/FTD EVALUATES Nb-95 3.6E76 RELEASE vs;PAG Ni-59 3.6E6 Ni-63 6.0E"7 P-32 3.6E-7 Ru-1 03 2.4E" Ru-1 06 3.6E-7 ES RELEASE EXCE RAD PERSONNEL Sb-124 7.2E"7 ANY OF THE TABLE LIMITS

-No- NOTIFY DANVILLE OR DOES THE SUM OFF Sb-125 3.6E "ýFRACTInS EXCEED 1.0 AT THATNO PARIS Sr-89 2.4E 7 DANVILLE? REQUIRED Sr-90 9.6E-8 PL-8 Tc-99m 1.1 E-5 7.2E-7 Y-90 I Yes' Zn-65 3.6E-6 Zr-95 2.4E-RAD PERSONNEL NOTIFY DEP/BRP FOR DANVILLE TO DIVERT DRINKING WATER SUPPLY & ESTIMATED TIME OF ARRIVAL OF RELEASE AT DANVILLE PL-7 NOTES:

1. PL-# CAN BE USED TO REFER TO SECTION 4.2 OF THE PROCEDURE FOR MORE DETAILED INFORMATION ON THE ACTION TO BE TAKEN.
2. CALLS TO DANVILLE ARE COURTESY INFORMATION CALLS ONLY. PROTECTIVE ACTION RECOMMENDATION CALLS MUST BE MADE BY DEP/BRP.

EP-AD-000-1 26, Revision 9, Page 2 of 6

TAB 6 EP-PS-325-6 PUBLIC PROTECTIVE ACTION RECOMMENDATION GUIDE AIRBORNE RELEASES

-' PA-1 MONITOR CONDITIONS FOR PAR APPLICATION The following conditions should be continuously evaluated to determine if a PAR should be implemented or changed:

"* Plant status and prognosis for changes in conditions

"* Onsite radiological conditions

"* Status of actual or potential radioactive releases

"* Offsite dose projections or actual offsite radiological conditions

"* Escalation in Emergency Classification (i.e., General)

(Go to PA-2)

PA-2 HAS A GENERAL EMERGENCY BEEN DECLARED?

El YES - Ifa GENERAL EMERGENCY has been declared, a PAR must be made within 15 minutes of the emergency declaration. The PAR requirement is found in "NUREG-0654. (Go to PA-3)

El NO - If a GENERAL EMERGENCY has not been declared, continue to monitor plant status, parameter trends, and prognosis for termination -or escalation of the event. (Go to PA-1)

PA-3 IS THERE A VALID DOSE PROJECTION INDICATING DOSES OF > 1 REM TEDE OR>

5 REM CDE CHILD THYROID AT A DISTANCE OF

> 2 MILES?

El YES - Ifthe projected doses at 2 miles are > 1 REM TEDE or > 5 REM CDE child thyroid, then full evacuation (0-10 miles) is recommended.

(Go to PA-5)

El NO/UNKNOWN - (Go to PA-4)

EP-AD-O00-126, Revision 9, Page 3 of 6

TAB 6 EP-PS-325-6 0 PA-4 RECOMMEND EVACUATION 0-2 MILES; SHELTER 2-10 MILES Limited Evacuation (0-2 miles) and sheltering is appropriate for events that are significant enough to cause a General Emergency classification and dose projections are low, unknown, or below full evacuation guidelines.

o1 PA-5 EVACUATE 0-10 MILES Full evacuation of members of the general public is recommended at this point based on the emergency classification and dose projections.

EP-AD-000-126, Revision 9, Page 4 of 6

TAB 6 EP-PS-325-6 LIQUID

_1 PL-1 ENTRY This section is entered when there are indications of a potential radioactive liquid release.

Indications of potential releases include:

"* an unisolable radwaste tank release.

"* leaks to cooling tower basin

"* leak to spray pond (Go to PL-2) 0l PL-2 CHEMISTRY/ENVIRONMENTAL SAMPLING DIRECTOR (ESD) TAKES AND ANALYZES SAMPLE (Go to PL-3)

PL-3 IS RELEASE > TECHNICAL REQUIREMENTS LIMITS (AT THE RELEASE POINT)?

El YES - -Releases are at or greater than Technical Requirements limits when Chemistry determines that the limits are exceeded based on methodologies described in the ODCM and applicable Chemistry procedures.

0l NO - Ifthe release is < Technical Requirements limits, then no notifications are required and monitoring should continue.

(Go to PL-4) 1E PL-4 RAD PERSONNEL NOTIFY DANVILLE AND BRP THAT A RELEASE HAS OCCURRED Depending on which facility is activated, the notification to Danville and BRP will be made by the RPC (TSC) or the Radiological Liaison (EOF).

DO NOT MAKE ANY PROTECTIVE ACTIONS RECOMMENDATIONS AT THIS TIME.

EP-AD-000-126, Revision 9, Page 5 of 6

TAB 6 EP-PS-325-6 o PL-5 CHEM/FTD EVALUATES RELEASE VERSUS PAGs The results of the sample analysis are compared to the PAGs for radionuclides in drinking water. The analysis calculates the expected concentration at Danville, taking into account the dilution afforded by the river.

PL-6 DOES RELEASE EXCEED PAGs (AT DANVILLE)?

o YES - If a single isotope exceeds the PAG or the sum of the fractions exceeds 1.0, then a protective action recommendation should be made for Danville to DIVERT its DRINKING WATER supply to a backup supply until the release has passed.

(Go to PL-7) o NO - If the PAGs are not exceeded, monitoring should continue and the State should be notified that no PAR for the liquid release is required. (Go to PL-8)

E PL-7 RAD PERSONNEL NOTIFY DEP/BRP OF PAR Depending on which facility is activated, the PAR notification to DEP/BRP will be made by the RPC (TSC) or the Radiological Liaison (EOF). The PAR FORM shall be used to document the PAR.

DO NOT COMMUNICATE THE PROTECTIVE ACTION RECOMMENDATION TO DANVILLE. THE DEP/BRP IS RESPONSIBLE FOR THIS COMMUNICATION.

o1 PL-8 RAD PERSONNEL NOTIFY DEP/BRP No PAR is required. Depending on which facility is activated, the RPC (TSC) or the Radiological Liaison (EOF) shall notify DEP/BRP that no PAR is required.

EP-AD-000-126, Revision 9, Page 6 of 6