ML041050506

From kanterella
Jump to navigation Jump to search
EP-PS-137, Rev 0, TSC NRC Communicator
ML041050506
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/07/2004
From:
Pennsylvania Power & Light Co, Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
28401 EP-PS-137, Rev 0
Download: ML041050506 (6)


Text

Apr. 07, 2004 Page 1

of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2004-16075 USER INFORMATION:

RLACH*R EMPL#:28401 CA#: 0363 Addr NUCSA2 P

ne#: 2 TRANSMITTAL INFORMATION:

TO:

-ty n 04/07/2004 LOCATION:

DOCUMENT CONTROL DESK rROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER iNUCSA-2)

HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

137 -

137 TSC NRC COMMUNICATOR REMOVE MANUAL TABLE OF CONTENTS DATE: 12/11/2003 ADD MANUAL TABLE OF CONTENTS -DATE: 04/06/2004 CATEGORY: PROCEDURES TYPE: EP ID:

EP-PS-137 REPLACE:

REV:0 REPLACE:

REV:0 REMOVE: PCAF 2003-1734 REV: N/A ADD: PCAF 2003-1734 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.- -PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR-NIMS INBOX.

Tab 7 EP-PS-1 37-7 EMERGENCY NOTIFICATION LOG SHEET EMERGENCY CLASSIFICATION UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY STATIC UPDATE EMERGENCY NOTIFICATION REPORT (ENR) CONTROL NO.

AGENCY NAME OF CONTACT TIME PEMA LCEMA CCEMA_

MOC/PIM ADDITIONAL INFORMATION EP-AD-OOO-308, Revision 3, Page 1 of 1

(.

(.

Cj Tab 7 EP-PS-137-7 NOTIFICATION MATRIX TECHNICAL SUPPORT CENTER COMMUNICATOR

  • I.

I %

PROTECTIVE ACtlON UPGRADE or SIGNIFICANT HAZARDOUS RECOMMENDATION AGENCYICONTACT PHONE NUMBER DOWNGRADE STATIC UPDATE EVENT MATERIAL FORM TERMINATION PCEMA (496014901) 1191 X

X X

X NA X

LC M A (4 06 49 7)W ithin

~

v ry hour CCDPS (495514956) 15 minutes MOC (490314902) tB mnuls Nuclear Regulatory Commisslon ENS or 1-301.816-5100 X

Within i1hour

. x.

X X

X 4

4 I

I

.1 Transmisslon Control Center 8-1-484-634-4090 X

After NRC noiHication X

Institute of Nuclear 8-1.800-321-0614 X

Power (INPO)

Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> American Nuclear 8-1-860-561-3433 X

Insurers

_I Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, X

NA PA Rural Electric Assn.

8-1-717.233-5704 Within 2 houis x

X m

I I

h Note:

Additional telephone numbers are located in the Emergency Telephone Directory available at each workstation.

EP-AD-000-350, RevisIon 14, Page 1 of 1

r Tab 7

- EP-PS-137-7 Control X I EMERGENCY NOTIFICATION REPORT I

1.

Call Status:

FI THIS IS A DRILL El THIS IS AN ACTUAL EVENT

2.

This is:

(Communicator's Name)

My telephone number is:

at Susquehanna Steam Electric Station.

Notification time is:

(Callback telephone number)

(Time notification initiated)

3.

EMERGENCY CLASSIFICATION:

El UNUSUAL EVENT El ALERT E The event has been terminated.

El SITE AREA EMERGENCY al GENERAL EMERGENCY UNIT: El ONE

[

Two El ONE & Two Declaration Time:

(Time classification/

termination declared)

DATE: -

(Date classification/

termination declared)

THIS REPRESENTS ANAN:

a INmAL DECLARATION l ESCALATION IN CLASSIFICATION STATUS Dl No CHANGE

4.

The Emergency Action Level (EAL) Number is:_

For initial declaration, static update, or escalation, provide current classification -EAL number only.

For significant events, or when directed by the ED, RM, or EOFSS, provide a brief description.

For termination, write emergency has been terminated.

BRIEF NON-TECHNICAL DESCRIPTION OF THE EVENT:

5.

THERE IS: El No E[

AN AIRBORNE

. NON-ROUTINE RADIOLOGICAL RELEASE IN PROGRESS El ALIQUID

6.

WIND DIRECTION IS FROM:

_ WIND SPEED IS:

mph.

(Data from 10 meter meteorological tower, available on PICSY.)

7.

==

Conclusion:==

Ea THIS IS A DRILL El THIS IS AN ACTUAL EVENT APPROVED:

(ED, RM, or EOFSS)

Time:

(Time form approved)

Date:

(Date form approved)

EP-AD-000-31 0, Revision 6, Page 1 of 1

I I I

I, I PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA S'(EAM ELECTRIC STATION 0

This is a Drill 3 This is an Actual Event Preparer.

l~

~

The EMERGENCY CLASSIFICATION is..l D Unusual Event 0 Alert 1 Site Area Emergency 03 General Emergency Basis: EAL #

This represents:

0 Initial Classification 0 Escalation D Reduction D No Change in the Classification Status Emergency Action(s) implemented onsite; 0 None 0 Local Area.Evacuation.

M Site Accountability Bases:

O Evacuation of non-essential personnel

. D KI to onsite personnel o Other The PROTECTIVE ACTION RECOMMENDATION is:

O No Protective Action Recommendation Required O Evacuate 0-2 miles and Shelter 2-10 miles and advise 0 Divert Danville Drinking Water*

citizens to take KI in accordance with the State's 0 Relocation emergency plans 0 Control of Access O Evacuate 0-1 0 miles and advise citizens to take KI 3 Contamination Controls/Decon in accordance with the State's emergency plans 0 Other

  • Expected arrival of release at Danville:

This represents:

0 Initial 03 Change 0 No Change in the Protective Action Recommendation EP-AD-000-1 10, Revision 11, Page 1 of 2

I :

  • TAB 7 EP-PS-137-7 The BASIS for the Protective Action'Recommendation is:

Plant Status Status of Radioactive Release: Event-related release in progress? n Yes 13 No Total Site Release Rate Airborne Liquid

< Tech Requirerments Limit

_3 _ _ D

Žt Tech Requirerments Limit El E

NOTE:

TRM Limits (pCfmin): Noble Gas 1.OOE+6; Iodine 1.04E+2; Particulate 7.72 E+2 (Airborne releases)

Based on:

M Effluent Monitors E3 Field Measurements E3 Engineering Judgement Data measured in the field confirm release rate estimations: O Yes l No E{ W/A Weather Conditions:

Wind Speed Wind Direction Dose Projections: E3 TEDE > 1 rem or thyroid CDE > 5 rem at 2 Miles E3 TEDE > 1 rem'or thyroid CDE > S rem at EPB E3 TEDE S 1 rem and thyroid CDE c 5 rem at EPB._

Other:

Approval:

Date/Time:

Emergency Director or Recovery Manager approval required if change in Classification or Protective Action Recommendation.

RPC or DASU approval Hf no change in the Classification or Protective Action Recommendation.

Transmittal:

E3 Verbal E3 Electronic El Both Communicated To:

NAME AGENCY DATEITIME EP-AD-000- 10, Revision 11, Page 2 of 2