Dec. 12, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-58789 USER INFORMATION:

ACH*RO EMPL#:28401 CA#: 0363 Addre NUCSA2 Ph 94 TRANSMITTAL INFORMATION:

TO: t, i^ u re t_ 12/12/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER

NUCSA-2)

\_A'HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

103 - 103 - OPERATIONS (OPS) COORDINATOR:

EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 11/12/2003 ADD MANUAL TABLE OF CONTENTS DATE: 12/11/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-103 REPLACE: REV:6 REPLACE: REV:6 REMOVE: PCAF 2003-1574 REV: N/A ADD: PCAF 2003-1574 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

I' ~ ~ ~~ ~ ~ ~ ~~~~~~~fDA

Tab 8 EP-PS-1 03-8 Control #

I EMERGENCY NOTIFICATION REPORT

1. Call Status: a THIS IS A DRILL El THIS IS AN ACTUAL EVENT
2. This is: at Susquehanna Steam Electric Station.

(Communicator's Name)

My telephone number is: Notification time is:

(Callback telephone number) (lime notification initiated)

3. EMERGENCY CLASSIFICATION:

El UNUSUAL EVENT El SITE AREA EMERGENCY

[1 ALERT El GENERAL EMERGENCY

[] The event has been terminated.

UNIT: E ONE Declaration DATE:

Time:

ED Two (Time classification/ (Date classification/

[] ONE & TWO termination declared) termination declared)

THIS REPRESENTS A/AN: El INmAL DECLARATION El El ESCALATION No CHANGE

} IN CLASSIFICATION STATUS

4. The Emergency Action Level (EAL) Number is:_

6 For initial declaration, static update, or escalation, provide current classification EAL number only.

For significant events, or when directed by the ED, RM, BRIEF NON-TECHNICAL or EOFSS, provide a brief description.

DESCRIPTION OF THE EVENT: L For termination. write emergency has been terminated.

5. THERE IS: E No Ex AN AIRBORNEl NON-ROUTINE RADIOLOGICAL RELEASE IN PROGRESS El A LIQUID
6. WIND DIRECTION IS FROM: _ WIND SPEED IS: mph.

(Data from 10 meter meteorological tower, available on PICSY.)

7.

Conclusion:

El THIS IS A DRILL El THIS IS AN ACTUAL EVENT APPROVED: Time: Date:

(ED, RM, or EOFSS) (Time form approved) (Date form approved)

EP-AD-000-310, Revision 6, Page 1 of 1

II x Tab 8 EP-PS-1 03-8 Affected Unit Control No.

PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA STEAM ELECTRIC STATION El This is a Drill 0 This is an Actual Event Preparer~

The EMERGENCY CLASSIFICATION is:

El Unusual Event El Alert E3 Site Area Emergency 0 General Emergency Basis: EAL #

This represents:

O Initial Classification 0 Escalation 0 Reduction E No Change in the Classification Status Emergency Action(s) implemented onsite:

0 None El Evacuation of non-essential personnel

  • 0 Local Area Evacuation El KI to onsite personnel ' -- .

O Site Accountability El Other Bases:

The PROTECTIVE ACTION RECOMMENDATION is:

o No Protective Action Recommendation Required 0 Evacuate 0-2 miles and Shelter 2-10 miles and advise 0 Divert Danville Drinking Water*

citizens to take KI in accordance with the State's E Relocation emergency plans.

  • Control of Access O Evacuate 0-10 miles and advise citizens to take KI E Contamination Controls/Decon
  • Expected arrival of release at Danville.

This represents: E Initial E Change E No Change in the Protective Action Recommendation EP-AD-000-1 10, Revision 11, Page 1 of 2

- . Tab 8 EP-PS-1 03-8

  • The BASIS for the Protective Action Recommendation is:

Plant Status Status of Radioactive Release: Event-related release in progress? O Yes E No Total Site Release Rate Airborne Liquid

< Tech Requirements Limit O I Tech Requirements Limit El El NOTE: TRM Limits (pCilmin): Noble Gas 1.OOE+6; Iodine 1.04E+2; Particulate 7.72 E+2 (Airborne releases)

Based on: El Effluent Monitors O Field Measurements E Engineering Judgement Data measured in the field confirm release rate estimations: E Yes El No E NWA Weather Conditions: Wind Speed_ Wind Direction Dose Projections: E TEDE S 1 rem or thyroid CDE > 5 rem at 2 miles O TEDE > 1 rem or thyroid CDE > 5 rem at EPB El TEDE < 1 rem and thyroid CDE < 5 rem at EPB-.

Other:

Approval: DatelTime:_

Emergency Director or Recovery Manager approval required if change in Classification or Protective Action Recommendation.

RPC or DASU approval if no change in the Classification or Protective Action Recommendation.

Transmittal: E Verbal El Electronic El Both Communicated To:

NAME AGENCY DATE/TIME EP-AD-000-1 10, Revision 11, Page 2 of 2