ML033570324
| ML033570324 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 12/12/2003 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| Download: ML033570324 (4) | |
Text
Dec. 12, 2003 Page 1
of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-58837 USER INFORMATION:
G
~ CH*ROS EMPL#:28401 CA#: 0363 Addre CSA2 Phon 4
TRANSMITTAL INFORMATION:
TO:
12/12/2003 LOCATION:
DOCUMENT CONTROL DESK FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)
'-.-4HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
127 -
127 -
TECHNICAL SUPPORT CENTER (TSC)
COMMUNICATOR: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 11/12/2003 ADD MANUAL TABLE OF CONTENTS DATE: 12/11/2003 CATEGORY: PROCEDURES TYPE: EP ID:
EP-PS-127 REPLACE:
REV:16 REPLACE:
REV:16 REMOVE: PCAF 2003-1482 REV: N/A REMOVE: PCAF 2003-1553 REV: N/A REMOVE: PCAF 2003-1641 REV: N/A ADD: PCAF 2003-1482 REV: N/A ADD: PCAF 2003-1553 REV: N/A ADD: PCAF 2003-1641 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT
- ROCEDURES.
PLEASE MAKE ALL CHANGES AND
",__ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS,
Tab 8
- EP-PS-127-8 Control #
I EMERGENCY NOTIFICATION REPORT
- 1.
Call Status:
[l THIS IS A DRILL El THIS IS AN ACTUAL EVENT
- 2.
This is:
(Communicator's Name)
My telephone number is:
at Susquehanna Steam Electric Station.
Notification time is:
(Callback telephone number)
(Time notification initiated)
- 3.
EMERGENCY CLASSIFICATION:
[1 UNUSUAL EVENT E1 ALERT El The event has been terminated.
Cl SITE AREA EMERGENCY E1 GENERAL EMERGENCY UNIT:
a ONE El Two El ONE & Two Declaration Time:
(Time classification/
termination declared)
DATE:
(Date classification/
termination declared)
THIS REPRESENTS AIAN:
El INITIAL DECLARATION
[- ESCALATION El No CHANGE
} IN CLASSIFICATION STATUS
- 4.
The Emergency Action Level (EAL) Number is::
For initial declaration, static update, or escalation, provide current classification EAL number only.
For significant events, or when directed by the ED, RM, or EOFSS, provide a brief description.
For termination, write emergency has been terminated.
BRIEF NON-TECHNICAL DESCRIPTION OF THE EVENT:
- 5. THERE IS: El No El AN AIRBORNE NON-ROUTINE RADIOLOGICAL RELEASE IN PROGRESS El A LIQUID J
- 6.
WIND DIRECTION IS FROM: : ___________.
WIND SPEED IS:
mph.
(Data from 10 meter meteorological tower, available on PICSY.)
- 7.
==
Conclusion:==
E THIS IS A DRILL El THIS IS AN ACTUAL EVENT APPROVED:
Time:
(Time form approved)
Date:
(Date form approved)
EP-AD-000-31 0, Revision 6, Page 1 of 1
Tab 8 EP-PS-127-8 Affected Unit Control No.
PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA STEAM ELECTRIC STATION El This is a Drill El This is an Actual Event Preparer.
The EMERGENCY CLASSIFICATION is:
0 Unusual Event 0 Alert 0 Site Area Emergency 0 General Emergency Basis: EAL #
This represents:
E Initial Classification
[3 Escalation 0 Reduction El No Change in the Classification Status Emergency Action7s) implemented onsite:
Emergency Action(s) implemented onsite:
O None D Local Area Evacuation E Site Accountability Bases:
O1 Evacuation of non-essential personnel O KI to onsite personnel El Other The PROTECTIVE ACTION RECOMMENDATION is:
El No Protective Action Recommendation Required E Evacuate 0-2 miles and Shelter 2-10 miles and advise 0 Divert Danville Drinking Water*
citizens to take KI in accordance with the State's El Relocation emergency plans.
03 Control of Access El Evacuate 0-10 miles and advise citizens to take KI 0 Contamination Controls/Decon in accordance with the State's emergency plans 0 Other
- Expected arrival of release at Danville_
This represents:
0 Initial E Change E No Change in the Protective Action Recommendation EP-AD-000-1 10, Revision 11, Page 1 of 2
I..
Tab 8 EP-PS-127-8 The BASIS for the Protective Action Recommendation is:
Plant Status Status of Radioactive Release: Event-related release in progress? D Yes D3 No Total Site Release Rate Airborne Liquid
< Tech Requirements Limit Cl 0
2 Tech Requirements Limit D3 0
NOTE:
TRM Limits (gCimin): Noble Gas 1.OOE+6; Iodine 1.04E+2; Particulate 7.72 E+2 (Airbome releases)
Based on:
El Effluent Monitors El Field Measurements ED Engineering Judgement Data measured in the field confirm release rate estimations: El Yes E3 No El WA Weather Conditions:
Wind Speed_
Wind Direction_
Dose Projections: D TEDE > 1 rem or thyroid CDE > 5 rem at 2 miles El TEDE > 1 rem or thyroid CDE >5 rem at EPB Cl TEDE < 1 rem and thyroid CDE *5 rem at EPBV Other:
Approval:'
Date/Time:_
Emergency Director or Recovery Manager approval required if change in Classification or Protective Action Recommendation.
RPC or DASU approval if no change in the Classification or Protective Action Recommendation.
Transmittal:
D3 Verbal El Electronic El Both Communicated To:
NAME AGENCY DATE/TIME EP-AD-OOO-1 10, Revision 11, Page 2 of 2