Apr. 01, 2004 Page 1

of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2004-14888 USER TNFORMATTON Gx ACH*ROw M EMPL#:28401 CA#: 0363 Addre NUCSA2 Phon 2

4 TRANSMITTAL INFORMATIONU TO:

GER LCH*ROSE El 0

4/01/2004 LOCATION: CDOCUMENT CONTROL-DESK PROM:

NUCLEAR RECORDS-DOCUMENT-CONTROL CENTER NUCSA-2)

V HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

248 -

248 -

ENVIRONMENTAL SAMPLE DIRECTOR REMOVE MANUAL TABLE OF CONTENTS DATE: 01/16/2004 ADD MANUAL TABLE OF CONTENTS DATE: 03/31/2004 CATEGORY: PROCEDURES TYPE: EP ID:

EP-PS-248 ADD: PCAF 2004-1264 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

n PI:

-- -t PROCEDURE CHANGE PROCESS FORM PCAF NO.,-!.-/Y1-917-YI412.

PAGE 1 OF

13.

PROC. NO.

EP-PS-248 REV.

I

4.

FORMS REVISED E R2, R

R_,

R_, --

R 5-PROCEDURE TITLE Environmental Sampling Director:

6. REQUESTED CHANGE PERIODIC REVIEW 0

NO E] YES INCORPORATE PCAFS 3 NO El YES #

REVISION El PCAF DELETION El (CHECK'ONE ONLY)

7.

SUMMARY

OF / REASON FOR CHANGE Added guidance in Tab E concerning reporting of liquid Sample results

\\j Continued El

9. DETERMINE COMMITTEE REVIEW REQUIREMENTS

,j

) (Refer to Section 6.1.4)

> kj-;

PORC REVIEW REQ'D?

'3 0 i

'YAES

9.

PORC UT'G N/A BLOCKS 11 THRU 16ARE ON PAGE 2.0F FORM

17.

T.C. Dalpiaz I

3227

'1 01130/2004

18. COMMUNICATION OF CHANGE REQUIRED?

PREPARER ETN.

DATE Mg NO El YES (TYPE)

(Print or Type) 19

/

. >\\

'r j

.SIG NATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HAS

19.

CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE

,DOCUMENTED IN BLOCK 16 OR ATTACHED REIEW FORMS.

CROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED RNPvNSBL~iUPFVI~R DAE,BY SIGNATURE IN BLOCK 16 OR ATTACHED REV`IEW FORMS.

20.

/94 I~IIROAr-$

DATE7

21. RESPONSIBLE APPROVER-ENTER N/A IF FUM HAS APPROVAL AUTHORITY INITI&-S DATE FORM NDAP-QA-0002-8, Rev. 9, Page'1 of 2 (Electronic Form')

V:J AR 3 0204 DOCLU7~ENT CON~TROL S7-hfizClES - SSES

PROCEDURE CHANGE PROCESS FORM PCAF NO.

12. PAGE 2 OF
13. PROC. NO. EP-PS-248 REV. 1
11. This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726.

Either 11 a or b must be checked 'YES" and the appropriate form attached or referenced.

a. This change is an Administrative Correction for which 50.59 and 72.48 are not

[

YES z N/A applicable.

b. This change requires a 50.59/72.48 Applicability/Screen/Evaluation.

YES LI N/A (Attach if not previously issued).

Reference Applicability/Screening/Evaluation No. A-01-1543

12. This change is consistent with the FSAR or an FSAR change is required.

ZYES Change Request No._

13. Should this change be reviewed for potential effects on Training Needs or Material?
1 YES NO If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN. PICN #
14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?

E] YES Z NO

15. Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per YES Z NO NDAP-QA-0320? (SICT/E form does not need to be attached.)
16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-O101-1.

REVIEWED BY WITH DATE REVIEW NO.COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS

OPERATIONS STATION ENGINEERING EMERGENCY PLANNING 5

/

MAINTENANCE RADIATION PROTECTION NUCLEAR MODIFICATIONS NUCLEAR DESIGN CHEMISTRY OTHER 10 CFR 50.54Q Required for changes that affect, or have potential for affecting c reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (5)

Required for changes to Section XI Inservice Test Acceptance Criteria.

FORM NDAP-QA-0002-8, Rev. 9, Page 2 of 2 (Electronic Form)

PUCF #a

/

PAGE 5 EinF '7 -

EP-PS-248 '

Revision 1 Page 2 of 3 ENVIRONMENTAL SAMPLING DIRECTOR: Emergency-Plan-Position-Specific Instruction WHEN:

Activation of the Emergency Operations Facility HOW NOTIFIED:'

Paged/Telephone REPORT TO:

Dose Assessment Supervisor WHERE TO REPORT:

Emergency Operations Facility OVERALL DUTY:

Direct emergency environmental field monitoring efforts to determine the significance of airbore and liquid releases.

MAJOR TASKS:

- TAB:

REVISION:

Initial actions upon arrival TAB A 0

Monitoring of affected sectors following an TAB B 1

  • airborne release Monitoring of non-affected sectors following an TAB C 1

airborne release Obtaining additional environmental sampling TAB D 0-support Management of Environmental Sampling Field TAB E 1

Teams in monitoring of unusual liquid release Analysis and disposition of emergency.

TAB F 1

environmental samples

X4 I -

PA6RE.47OF TAB E EP-PS-248-E Revision 1 Page 1 of 4 MAJOR TASK:

Management of Environmental Sampling Field Teams in monitoring of Unusual liquid releases.

SPECIFIC TASKS:

HOW:

1.

Initiate sampling of the Susquehanna River and Danvilledrinking water supply..

NOTE:

  • If an airborne release is occurring, do not attempt to sample affected areas of the river to monitor liquid
  • release progress.

If an airborne release occurred previously, determine If the river and Danville Water Authority are in the affected sectors. If in the affected sectors, sampling team(s) may be dispatched if deposition levels in area traversed are below 4.5EXpCUm2.

  • 1If deposition levels are between 4.5] 2 pCim 2 and 4.5E'pCUm2, sampling team personnel must be accompanied by Radiological Monitoring Team personnel; DO NOT DISPATCH Monitoring-Team personnel to traverse areas with deposition at or above 4.5E'pCilm2without permission from the DASU.

1 a.

Ensure team members sign in on RWP #8002 for field team activities.

lb.

Sample the river to monitor progress of the release and to determine actual radionuclide levels at Danville Water Authority.

PCAF tF~

-/

i TAB E PAGESLJ OF EP-PS-248-E Revision 1 Page2of.4 SPECIFIC TASKS:

HOW:

1c.

If no airborne release is occurring or has occurred, contact the SSES Environmental Laboratory Project Director and request environmental samplers to monitor liquid release.

-d.

Using the river depth, reference Table 1 in "HELP' Tab to estimate transit time to Danville for leading edge of the release.

HELP Liquid Discharge Data Sheets See TAB 8 le.

Use the arrival time as a guide for dispatch of the sampling team to Danville Water Authority' consulting with the DASU where to sample. (Immediately go to the Water Authority or sample prior to it.)

.'NOTE:

Time permitting, water may be sampled from one or more of the bridges located downstream of the SSES discharge line but upriver from Danville.

The following approximate transit times for releases to these bridges are expressed as fractions of the travel time to"Danvilet' ll5to Berwick 1/3 to Mifflinville 213 to East Bloomsburg 3/4 to Catawissa Determine if sufficient time remains before the trailing edge of the plume passes the monitoring location for obtaining samples.

River water analysis results are not used in liquid release calculations.

ID PAGEOFLw

-TAB E EP-PS-248-E Revision 1 Page 3 of 4 SPECIFIC TASKS:

HOW:

HELP Environmental Sampling Locations See TAB 2

2.

Direct samplers to obtain water samples from the Danville Water Authority. -

2a. ' Obtain three two gallon grab samples of

-' water from the Radiation Monitor sink drain line, (location 12 H2R), at the following estimated arrival times: '

1) 2)

  • 3)

Leading edge of the release Peak concentration of the release Trailing edge of the release.

NOTE:

If the sample cannot be obtained from the sink drain line; collect one from the alternate location, (Pa. Fish Commission Boat Ramp at Danville), using a boat to sample midstream.

' 3a. Record on the forrnm'

1. Team(s) sample numbers
2. Sample types
3. Location codes
3.

Log information on the "Emergency Environmental Monitoring Sample Log" where applicable.

NOTE:

The sample numbers will be whole number integers that will be assigned sequentially based on the order In which samples are obtained, beginning with 1 for the first.

HELP Emergency Environmental Monitoring Records See TAB 4

()

A P.

I HAGELOF 7 -

HOW:

TAB E EP-PS-248-E Revision i Page 4 of 4 SPECIFIC TASKS:

4.

Direct samplers to return samples to the Administrative Coordinator at the SSES Environmental Laboratory, (unless an airborne release has occurred or one.is imminent).

NOTE:.

If an airborne release affecting the Environmental Labbratory is in progress or expected soon, direct the samplers to.take samples to the appropriate county-decontamination center.

HELP County Decontamination Facility.

Locations; See TAB 3:

I i

Pj!z

5. Notify the DASU of the sample results particularly if the diluted sum of the EC fractions at Danville exceeds 0.85.