Jan. 19, 2004 Page 1
of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2004-2651 USER INFORMATION:
GE ACH*RO M
EMPL#:28401 CA#: 0363 Addre UCSA2 Pho 43194 RANSMITTAL INFORMATION:
TO:
b lb.
01/19/2004 LOCATION:
DOCUMENT CONTROL DESK "ROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER
- NUCSA-2)
\\_'JHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
101 -
101 -
EMERGENCY DIRECTOR (ED)-TSC EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 11/12/2003 ADD MANUAL TABLE OF CONTENTS DATE: 01/16/2004 CATEGORY: PROCEDURES TYPE: EP ID:
EP-PS-101 ADD: PCAF 2004-1034 REV: N/A REMOVE: PCAF 2003-1642 REV: N/A ADD: PCAF 2004-1033 REV: N/A REMOVE: PCAF 2004-1034 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
- i.
~ ~
~
~
~
~
~
II
IF Tab 5 EP-PS-1 01 -5 TURNOVER CHECKLIST CONTROL ROOM -TSC - EOF
- 1. Affected Units
- 2. Classification/EAL #
1.
- 3. Protective Action recommendations issued
- 4. Emergency Actions Implemented:
Accountability Local area evacuation Site evacuation Issuance of KI Personal injury response Other
- 5. Plant Conditions:
Reactor Shutdown:
Rx Pressure*
Cooldown I/P Rx Power*
Fuel Damaged Rx Level*
Plant Stable Cont. Pressure*
Rad Issues Cont. Rad*
Decay Heat Removal Path
.Available from PICSY (STA Overview Screen)
- 6. Sequence of Events, Mitigating Actions, and Equipment Out-of-Service:
- 7. Release in progress and flow path (if known)
Refer to EP-PS-1 00 Tab H OR EP-PS-1 01/200 Tab I
- 9. Status of News Release review and approval and Status of Offsite Notifications:
- 10. Functions transferred:
Control Room to TSC:
Classification Notification Dose Assessment Protective Action In-Plant Team Control TSC to EOF:
Classification Notification (Except ENS communications)
Dose Assessment 0 Protective Action
- 11. Turnover accepted Time:
EP-AD-000-096, Revision 2, Page 1 of 1
Tab 5 EP-PS-1 01-5 TURNOVER CHECKLIST CONTROL ROOM - TSC - EOF
- 1. Affected Units
- 2. Classification/EAL #
I
- 3. Protective Action recommendations issued
- 4. Emergency Actions Implemented:
Accountability Local area evacuation Site evacuation Issuance of KI Personal injury response Other
- 5. Plant Conditions:
Reactor Shutdown:
Rx Pressure*
Cooldown I/P Rx Power*
Fuel Damaged Rx Level*
Plant Stable Cont. Pressure*
Rad Issues Cont. Rad*
Decay Heat Removal Path
- Available from PICSY (STA Overview Screen)
- 6. Sequence of Events, Mitigating Actions, and Equipment Out-of-Service:
- 7. Release in progress and flow path (if known)
Refer to EP-PS-100 Tab H OR EP-PS-101/200 Tab I
- 9. Status of News Release review and approval and Status of Offsite Notifications:
- 10. Functions transferred:
Control Room to TSC:
Classification Notification Dose Assessment Protective Action In-Plant Team Control
- 11. Turnover accepted TSC to EOF:
Classification Notification (Except ENS communications)
Dose Assessment Protective Action Time:
m EP-AD-000-447, Revision 7, Page 1 of 1
TAB 5 EP-PS-1 01-5 TSC/EOF BRIEFING CHECKLIST Date:
Time:
Event classification:
EAL:
- 1. Changes in Plant Conditions since last Briefing:
- 2. RCS Heal Removal Flowpath:
- 3. Release Information:
- a. Release Rate: _iCilmin.
- b. Field Dose. Rates:
(TEDE-whole body)/
(CDE-thyroid)
- c. Dose Projection Calcs:
(TEDE-whole body)/
(CDE thyroidj
- 4. Rad Release Flowpath:
- 5. Proiected Time of Release Termination:
- 6. Protective Actions:
Status:
- a. Accountability
- b. Site Evacuation
- c. KI
- 7. Plant Priorities: (Stabilize Plant/Terminate Release/etc.):
Status:
- 8. EOF Support Activities:
Status:
EP-AD-000-095, Revision 1, Page 1 of I
/43 PROCEDURE CHANGE PROCESS FORM
- 1. PCAF NO.,Wy
- 12. PAGE 1 OF J4
-3PROC. NO.
EP-PS-101 REV. 19
- 4. FORMSREVISED - A Ri%
/- B R10
-C R8 R
R
- 5. PROCEDURE TITLE Emergency Plan Position Specific Instruction: TSC Emergency Director i i
- 6.
REQUESTED CHANGE PERIODIC REVIEW 3 NO Ml YES w..w I,01, VMV
110 INCORPORATE PCAFS La NO 3 YES
- 2003-1642 REVISION DI PCAF Z DELETION LI (CHECK ONE ONLY)
- 7.
SUMMARY
OF / REASON FOR CHANGE Incorporate PCAF 2003-1642 Adds guidance on issues that consistute significant events that should be reported to the offsite agencies.
Provides guidance on events and issues that should be announced to plant personnel.
Deletes a listing of items transferred from the Control Room to the TSC and adds a statement to reference the same list of items that are contained in the Turnover sheet Deletes the step to have the ED-TSC notify senior PPL Management. The step is incorporated in EP-PS-200 for the Recovery Manager to perform.
This is an administrative change in that it clarifies existing requirements.
Continued
- 8. DETERMINE COMMITTEE REVIEW REQUIREMENTS (Refer to Section 6.1.4)
PORC REVIEW REQ'D?
12 NO L
YES
- 9.
PORC MTG#
N/A BLOCKS 11 THRU 16ARE ON PAGE 2 OF FORM
- 17.
T.C. Dalpiaz
/
3227 I
01/07/2004
- 18. COMMUNICATION OF CHANGE REQUIRED?
PREPARER ETN DATE El NO M YES (TYPE) E mail notification (Print or Type) and personal discussion
- 19.
SIGNATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HAS CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE
( o, e/}lo 9
DOCUMENTED IN BLOCK 16 OR ATTACHED REVIEW FORMS.
DBEnDATE CROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED vRFSv 1E SUPERxV ISOR s
DATE cBY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW FORMS.
- 20.
II,.sf 1 APPROVAL DATE
- 21. RESPONSIBLE APPROVER ENTER N/A IF FUM HAS APPROVAL AUTHORITY N/A INITIALS DATE FORM NDAP-QA-0002-8, Rev. 9, Page 1 of 2 (Electronic Form)
N/d9gROCEDURE CHANGE PROCESS FORM
-1.
PCAF NO. 4;$
- 12.
PAGE 2 OF Ill
- 13. PROC. NO. EP-PS-101 REV. 19
- 11. This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726.
Either I la or b must be checked 'YES' and the appropriate form attached or referenced.
- a. This change is an Administrative Correction for which 50.59 and 72.48 are not YES Jj N/A applicable.
- b. This change requires a 50.59/72.48 Applicability/Screen/Evaluation.
s YES El N/A (Attach if not previously issued).
ReferenceApplicability/ScreeninglEvaluation No. A-01-1543
YES Change Request No.
- 13. Should this change be reviewed for potential effects on Training NWeds or Material?
YES jj NO If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN. PICN #
- 14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?
0 YES 3 NO
- 15. Is a Special, Infrequent or Complex TestlEvolution Analysis Form required per J YES Z
NO NDAP-QA-0320? (SICT/E form does not need to be attached.)
- 16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.
REVIEWED BY WITH DATE REVIEW NO COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS
- ISI *
- OPERATIONS STATION ENGINEERING EMERGENCY PLANNING
__________//______
MAINTENANCE RADIATION PROTECTION NUCLEAR MODIFICATIONS NUCLEAR DESIGN CHEMISTRY OTHER 10CFR 50.54Q
_xed__e__a__
Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (58)
Required for changes to Section Xi Inservice Test Acceptance Criteria.
FORM NDAP-QA-0002-8, Rev. 9, Page 2 of 2 (Electronic Form)*.
PU~~~~~~~~~~k
~
~
9
-5<
AI-PAGE 3OF.1 EP-PS-101 Revision 19 Page 2of4 EMERGENCY DIRECTOR IEPMTSC:
Emergency Plan-Positon Specific Procedure WHEN:
Emergency Support Center (TSC) Is aetivated HOW NOTIFIED:
Phoned by Station Operator After hours: Paged.
REPORTTO:
Vice President-Nutcear Operations WHERE TO REPORT:
Control Room/SC OVERALL DUTY:
Manage the Technical Support Center (TSC) so that the plant responds to the emergency. people are protected, and the center processes information to those who need to know. Once the EOF has taken over these comrnunications and radiological functions, concentrate exclusively on returning the plant to a safe condition.
MAJOR TASKS:'
TAB:
REVISION:
Assemble and brief TSC staff, then take over*
the task of managing the emergency.
Reclassify the emergency as conditions change-.
Make sure Information Is being communicated to company, public, and government personnel.
Mtake protective action recommendations to safeguard public and measures to protect personnel workdig In or near the plant.
RevieW Severe Accident Management (SAM),
strategis Manage turnover to the next shift.
Turn over Emergency Manasemnent to the EOF.
When emergency Is terminated, disband the TSC staff.
Determilne there Is a non-routine Racliological Release In Progress.
TAB A TAB B 8 -!jo
° TAB C TAB D TAB E TAB F TAB G TAB H 10 4
4 0
TAB I
oF R~son 19 SUPPORTING INFORMATION:
TAB:
Emergcncy Telephone Instnictions TAB I EmergencY Organiation TAB 2 Logkecping TAB3 Brief Non-Technical Descriptions of EAL TAB 4 TunovedBricetng Checkdists:
TAB S Control Room/TSC Turnover Checklist TSCIEOF Turnover Checklist
- TSEOF Briefing Checklist Emergency Classification TAB 6 Public Protective Action Reconmendation Guide TAB 7 PPL EBnergency Personnel Dose Assessment and TAB 8 Protective Action Recomrnendation (PAR) Guide TSC StaffResponsibilities TAB 9 Restoration Organization Guidelines TAB 10 Emergency Fonns TAB 11
- TSC Data Sheet Potassiun Iodine (KI) Tracking Form Emergency Exposwue Extensions Emergency Exposure Extension Request
- PAR State Notification Form Primary Containment and RVP Venting Strategy TAB 12
.r FCAF -g PA GEL~QFJ 9, j TAB A EP-PS-101-A Revision a jI Page I of 7 MAJOR TASK:
Assemble and brief TSC staff, then take over the task of managing the emergency.
- SPECIFIC _TASKS:
HOW:
NOTE: When the NERO Is called out, the TSC should be activated regardless of the classification leveL NOTE:The activation process Is the same regardless of classification level NOTE (1):
The Operations Coordinator may perform Steps I through 3b (as defined by parenthesis) if the-TSC Emergency Director has assumed the role of the ED In the Control Room; iL A.k C_
NOTE (2):
If the ED did NOT take over Control of the Emergency proceed
-with Step 1.
Determirie plant status la.
Report to Control Room.
lb.
Receive urnover from Shift Manager.
HELP CONTROL ROOMITSC TURNOVER CHECKLIST See TAB S
- 2.
Assume overall management of the emergency.
Ic.
Dcterine:
(1)
Resources or actions required by Operations.
(2)
In progress plant activities.
2a.
Verify key Coordinators are ready to assume emergency functions required for activation:
(I)
Operations Coordinator (2)
Damage Control Team coordinator
- *1 TABA
. EP-PS-101-A Revision1: jf Page 20f7 vZ%
SPECIFIC TASKS:
HOW:
(3)
Rad Protection Coordinator (4)
TSC Coordinator (5)
TSC NRC Communicator (6)
Security Coordinator HELP Emergency Organization See TAB 2 NOTE:
The Operations Coordinator may perform step Zb as dellned In ().
However, only a qualified-ED can relieve the Control Room ED of overall management of the emergency.
NOTE:1 AN EAL DECLARATION HAS JUST BEEN MADE IN THE CONTROL ROOM, ENSURE THE CONTROL ROOM ALSO MAKES THE OFFSITE NOTIFICATIONS AND PAR NOTIFICATIONS Qf a General Emergency was declared) 2b.
Contact the Shift Manager and relieve Control Room of overall management of emergency.
(Ops Coordinator nofif Control Room ED of readim of TSC totake turnoer.)
2c.
Refer to the Control Room-TSC Turnover sheet for listing of responsibilities transferred I
~-'~A
- ~
.~
I. I*
I
-)
PAGL 2OF EP-PS-101-A Page 3 of 7 SPECIFIC TASKS:
HOW:
2c.
If thc Operations Coordinator prepared the TSC for activation while you were filling te role of Control Room ED, activate the 71SC '
2d.
Make a Plant PA armouncement when the 'TSC is in control of the c~~~~~~~~m erg ency.
NOTE (1):
The Plant Page located on the ED Desk s Loal to the TSC. The Plant-wide PA Is located on elther wall In the TSC.
NOTE (2):
This responsibility can be delegated to the TSC Communicator.
2e.
Brief TSCpersonnrclon emergency situation.
2f.
Review classification of emergency (TAB B).
2g.
Review radiological conditions and dose proiections if applicable
- 3.
Perform extenia! n~ations.
(TAB D and TAB I) 3.-
perform extermal notifictions 3a.
Notify Public Information Manager of plant status.
1/4~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
CAF #
TM A PAG uF-1,J.J Revisioni/
Page 4 of r f
SPECIFIC TASKS:
HOW:
- 4.
Direct the Security or Admin Coordinators to verify 60 and 90 mrunute NERO members respond.
- 5.
Manage the emergency.
5a Reclassify the emergency as conditions change (TAB B).
Sb.
Communicate infonnation concerning emergency (TAB C).
Sc.
Initiate radioactive release monitoring to support Public Protective Action Recommendation (TAB D).
Sd.
Make Protective Action Recommendation as required (TAB D).
5e-Notify the Control Room to initiate accountability.
NOTE (1):
Aiccountability required at Site Ares Emergency or higher classification (consider habitability of accountability locations). Rid Protection and Security Coordinators responsible to implement.
NOTE (2):
Once accountability Is ordered,it..
must be maintalned until either the event is terminated or an evacuation Is ordered.
Sf.
Initiate RCA Evacuation when.
plant conditions dictate or:
(I)
When accountability is initiated.
I
- )
PAGEL.40F '
TAB A EP-P$-101.A Revision-J-if Page 5 of 7
.%1 SPECIFIC TASKS:
HOW:
Sg&
Initiate Site Evacuation of non-essential personnel when site conditions dictate or when a Site or General Eniergency is declared
- AND accountability is complete.
NOTE:
Essential personnel:
- Opeations
- Maintenance
- Health Physics
- Chtmistry
- Security.
NERO Members (I)
Instuct Secinity Coordinator to perform site evacuation.
K)
(2)
If the TSC is in control of.
the Emergency, direct both.
TSC Communicators to notify oftsite agencies of the evacuation initiation.
(3)
If the *EOF is in control of the emergency, direct the TSC E-Plan Communicator to notify the EOF Communicator of the evacuation so that the EOF can notify offsite agencies..
(4)
Dircat the TSC NRC Communicator to notify the NRC of the evacuation initiation.
Monitor plant status.
I Sh.
NOTE:
Ops Coordinator responsible to maintain.
PAGE.Ji-Of-J.~ 1J TAB A EP-PS-101-A Revision e Iy Page 6of7 LL.
I +/-
SPECIFIC TASKS:
HOW:
Si.
Establish plant priorities.
NOTE:
Ops Coordinator responsibility.
Sj.
Initiate corrective actions for plant priorities.
NOTE:
Damage Control Team Coordinator responsible to'implement actions.
51 Ensure proper resources arm available to combat emergency.
NOTE:
-Damage Control Team and Admin.
Coordinators responsibilities
- 51.
Initiate core dianage assessmnLt NOTE:
Tech Support Coordinator responsibility. Requires PASS sample - Chemistry Coordinator.
Sm.
Initiate i4-hour shift coverage for emergency positions.
NOTE:
Admnin. Coordinator responsible.
Sn.
Support emergency medical response, search/rescue.
NOTE:
Reference SP-00-308, (Emergency Medical Response, SearchlRescue)
- 6.
Request Federal assistance to augment NERO.
6a.
When federal assistance is required, requests should be coordinated with PEMA andlor DEP/BRP.
i I(2)
I
) 9..
li-;-
TABA EP-PS-1O1-A Revision 1J
.f Page 7 of 7 LL.
SPECIRC TASKS:
- 7.
lfreqwred' invoke the provisions of IOCFR 50.54X.
BOW:
7a.
In accordance with IOCFR 50.54X, operation outside the.
Technical Specifications shall ornly be taken in an cmergency.
(I)
Wihen action is immediately needed o protect the public health and safety and no action consistent with license conditions and Technical Specifications that can provide adequate or equivalent protection is immediately apparent.
(2)
Direct the Operations Coordinator to have the ShiftManager implement the provisions of OP-AD-001 Section 62.6.
Ni
S~~~
PAGE 1 OFF..LSJ TAB B EP-PS-101-B Revisloni Io Page I of 4 IL41.
i a
..t.
MAJUK 1Ado; Z Reclassify the emergency as conditions change.
SPECIFIC TASKS:
HOW: I
- 1.
Evaluate latest information.
la.
Cons~it lead Coordinators for updated information.
(1)
Radiation Protection Coordinator for radiological release.
(2)
Operations Coordinator on plant status.
(3)
Technical Support Coordinator over status of problem identification/
resolution.
(4)
Security Coordinator for security event.
(5)
Damage Control Team Coordinator for repair status.
2 Assess if there is a non-routine Radiological release in progress.
2a.
Refer to Tab I for assistance in determining if there is a non-routine Radiological release in progress.
2b..
If there is a non-routine Radiological release in progress, insure the TSC E Plan Communicator indicates that on the ENR fonn.
2c Insure that information is communicated to TSC personnel and the Recovery Manager.
LI-b.-
- 3.
If significant changes have occurred, review EAL classifications.
3a.
Review EAL classifications.
PAGL OL-OJLLL.
.~~~~~~~~~~~~~~~~~~~~~~~~
TAB B' EP-PS-101-B Revision.9-11 p
Page 2of 4
. 'a
'3' A CWQ.
UnW.
.HELP Emergency Classification See TAB 6 3b.
Find emergency action levels on matrix closest to actual plant condition.
CAULION:
If you upgrade to. a General Emergency, you must make a Protective Action Recommendation within 15 minutes (see TAB D).
3c.
Refer to EAL bases document for additional guidance.
3d.
If no EAL's are applicable to the current situation be sure to review the General Criteria EAL 4.
- 4.
Choose the most appropriate emergency action level.
4a.
If upgrading, go to Specific Task #4 of this tab, "Document and communicate the new classification."
4b.
If downgrading from a Site Area Emergency or General Emergency you must get concurrence from:
(1)
NRC (2)
DEPIBRP (3)
PPL Sr. VP or VP-Nuclear Operations 4c.
If terminating the emergency, go to TAB G.
- 5.
Document and communicate the new classification.
Document in log.
.Z I~~~~~~~
TAB B EP-PS-1 01-B RevisioaAA'/?t Page 3of 4 U.
I --k 1
4ml- -
SPECIFIC TASKS:
HOW: (I)
(2)
(3)
Time
'Date Emergency level 5b.
Instruct either TSC Communicator to announce classification over page.
Sc.
Instruct both TSC Communicators to initiate notifications (Local/State, NRC).
NOTE:
PEMA, LCEMA and CCDPS must be notified within IS minutes after classification.
NRC should be notified as' soon as possible, but within 60 minutes.
Sd.
At Site Area or General Emergency, contact the Shift Manager to initiate accountability actions if not already done.
NOTE (1):
Accountability Is optional at the alert level. It Is required at the SlteArea Emergency or-General Emergency.
- 3,-
NOTE (2):
Once accountability is' initiated it must be maintained 'until the event is terminated or a site' evacuation is Initiated. '
I 6a.
Go to TAB D.
- 6.
Review PAR Guidance in anticipation of escalation to a General Emergency.
PGAF ff-2064'4
'PAGEW. O FJ.LJ, TAB 8 EP-PS-101-B Revisfort.8j7 Page 4of 4
. U.
.A-S.PECIFIC TASKS:
HOW:
- 7.
When conditions warrant, declare a General Energency.
7a.
Within 15 minutes of declaration of a General Emergency, perform the following (1) Ensure notifications via ENR form to PEMA, LCEMA, and CCDPS are Initiated by the TSC Communicator.
(2)
Determine appropriate PAR.
- Go to TAB D.
- 8.
Continua to evaluate current PAR and revise as appropriate based on increasing dose levels.
8a.*- Go toTAB D.
I
F'(;At *_ S)TAB C
PAGE I; OF TL),.,-,J1 EPage losts Page Iof 3 MAJOR TASK:
Make sure information is being communicated to company, public, and government personnel. This includes calls you make directly.
SPECIFIC TASKS:
HOW:
- 1.
Assure offsite agencies and internal management are notified.
la.
Direct the TSC E-Plan Communicator to complete the Emergency Notification Report using guidance provided in the
'Emergency Action Level Reference ManuaL" HELP Brief Non-Technical Descriptions of EAL See TAB 4 lb.
If the TSC is in control of the Emergency, direct both of the TSC Communicators to notify offsite organizations when a site evacuation of non-essential personnel is initiated.
Ic.
If the EOF is in control, direct the E-Plan Communicator to notify the EOF Communicator to notify offsite organizations when a site evacuation is initiated.
Id.
If the EOF is in control, the TSC NRC Communicator will inform the NRC when a site evacuation is initiated.
HELP Emergency Telephone Instructions See TAB 1
. -1 PAGE 4OFJ.Lj TAB C EP-PS-101-C,
Revisionk 9 Page 2 of 3
.I SPECIFIC TASKS:
HOW:
- 2.
Evaluate if there is a non-routine Radiological Release in progress 2a.
Refer to Tab I for additional guidance in making this determination.
2b.
If offsite radiological release is in progress, the Rad Protection Coordinator informs DEP/BRP with Protective Action IRecomrnmendation Form.
2c.
If offsite radiological release is in progress, insure the TSC Communicator provides that information on the ENR form (Block 4)
- 3.
Provide static updates on the, emergency to TSC staff.
- 4.
Periodically meet with lead TSC Coordinators to discuss information about the emergency.
4a.
Conduct routine meetings approximately every 30 to 60 minutes to:,
(1)'
Set up action items.
(2)
Set priorities.
(3)
Clarify responsibilities.
(4)
Discuss long-range requirements.
(5)
Allocate resources.
HELP TSC Staff Responsibilities See TAB 11 HELP
.TSC/EOF BRIEFING CHECKLIST See TAB 5 Sa.
Set conference call by dialing 199 on your CTN phone.
- 5.
Present emergency status and TSC
- priorities diring EOF conference call.
)...
i-'*'
./ot PGAG4L ff
.. L' PAGE 0t FTJ1 TAB C EP-PS-101-C Revision.8 &
Page 3 of 3 tL.
41, 06..
SPECFC TASKS:
BOW:
NOTE:
Emergency Telephone DIrectory Centrex System Conferencing.
Sb.
Provide information concerning:
(1) Plant status.
(2) Radiological conditions.
- (3) Classification level.
- 6.
Approve news releases before being issued by PIM-
- 7.
Approve Emergency Notification Reports prior to transmission.
- 8.
Approve Protective Action Recommendation Forms pribr to transmission.
Insure emergency information is provided to the offsite agencies 9
8a Approval by Emergency Director required only if Public Protective Action Recommendation is made.
9a:
Direct the TSC Emergency Plan Com.mnicator to generate an ENR form for significant events:
When the TSC has taken control of the Emergency.
Initiation of a site evacuation Emergency classification at the current level but due to an unrelated EAL Change in radiological release status Medicai transport of a.
contaminated individual Fire requiring assistance from offsite fire companies Othersignificant events as
. determined by the Emergency, Director.
lOa.
Announce the following items via the plant PA system NOTE: THIS ACTION CAN BE ASSIGNED TO THE TSC E PLAN COMMUNICATOR.
Emergency. Classification arid EAL.
o Public Protective Actionb recommendations
.On-site protective actions
°-
Initiation of accountability Initiation of site evacuation o Local Area evacuations o Other items of significance as determined by the Emergency Director kL I.-
- 10.
Insure cmergeocy infomlation is provided to plant pexsonnd V
.i- -
s z=
1111-
KUAF f.
TAT B G.
PAGL~~fLOLILJ EtP-PS.1014G
-.. Pagel1of I IL l k.
MAJOR TASK:
Turn over Emergency Management to EOF, but continue to assess plant conditions and evaluate reclassification based on plant parameters.
SPECIFIC TASKS:
HOW:
- 1.
Collect turnover infornation from designated sourcs la. Use turnover checklist.
HELP TSCIEOF TURNOVER CHECKLIST See TAB 5
- 2.
Turnover ofcontrol of overall management of emergency activities from the TSC to the EOF.
2a.. Review turnover checklist with Recovery Manager.
NOTE: IF AN EAL DECLARATION HAS JUST BEEN MADE IN THE TSC, INSURE THAT OFFSITE NOTIFICATIONS ARE MADE BY THE TSC PRIOR TO TURNOVER TO THE EOF.
NOTE: IFA GENERAL.
EMERGENCY WAS JUST DECLARED IN THE TSC INSURE THAT THE PAR AND PAR NOTIFICATIONS ARE MADE BY THE TSC PRIOR TO TURNOVER TO THE EOP..
3CL A~
a-
- 3.
Continue to assess plant conditions and
- evaluate reclassification plant paramctenS.
NOTE:
- The Emergency Director Is responsible to notify the.
Recovery Manager when In-plant conditions associated
. with an Emergency Action Level have been reached.